m (2023)
 
(6 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{alert|This section of the manual is being developed|alert-under-construction}}
 
 
 
==SECTION 14 TEMPORARY SEDIMENT BASINS==
 
==SECTION 14 TEMPORARY SEDIMENT BASINS==
  
Line 7: Line 5:
  
 
===14.2===
 
===14.2===
<big>Where ten (10) or more acres of disturbed soil drain to a common location, [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.23 permittees] must provide a temporary sediment basin to provide treatment of the runoff before it leaves the construction site or enters [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.34 surface waters]. Permittees may convert a temporary sediment basin to a permanent basin after construction is complete. The temporary basin is no longer required when [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.22 permanent cover] has reduced the acreage of disturbed soil to less than ten (10) acres draining to a common location.</big>
+
<big>Where ten (10) or more acres of disturbed soil (5 acres for sites discharging to special or impaired waters, see section 24) drain to a common location, [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.23 permittees] must provide a temporary sediment basin to provide treatment of the runoff before it leaves the construction site or enters [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.34 surface waters]. Permittees may convert a temporary sediment basin to a permanent basin after construction is complete. The temporary basin is no longer required when [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.22 permanent cover] has reduced the acreage of disturbed soil to less than ten (10) acres draining to a common location.</big>
  
 
===14.3===
 
===14.3===
Line 22: Line 20:
  
 
===14.7===
 
===14.7===
<big>Permittees must provide energy dissipation for the basin outlet within 24 hours after connection to a surface water.</big>
+
<big>Permittees must provide [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.8 energy dissipation] for the basin outlet within 24 hours after connection to a surface water.</big>
  
 
===14.8===
 
===14.8===
<big>Permittees must locate temporary basins outside of surface waters and any buffer zone required in item 23.11.</big>
+
<big>Permittees must locate temporary basins outside of surface waters and any buffer zone required in item [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_23_Discharges_to_Special_(Prohibited,_Restricted,_Other)_and_Impaired_Waters#23.11 23.11].</big>
  
 
===14.9===
 
===14.9===
Line 31: Line 29:
  
 
===14.10===
 
===14.10===
<big>Where a temporary sediment basin meeting the requirements of item 14.3 through 14.9 is infeasible, permittees must install effective sediment controls such as smaller sediment basins and/or sediment traps, silt fences, vegetative buffer strips or any appropriate combination of measures as dictated by individual site conditions. In determining whether installing a sediment basin is infeasible, permittees must consider public safety and may consider factors such as site soils, slope, and available area on-site. Permittees must document this determination of infeasibility in the SWPPP.</big>
+
<big>Where a temporary sediment basin meeting the requirements of item [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_14_Temporary_Sediment_Basins#14.3 14.3] through [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_14_Temporary_Sediment_Basins#14.9 14.9] is [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.13 infeasible], permittees must install effective sediment controls such as smaller sediment basins and/or sediment traps, silt fences, vegetative buffer strips or any appropriate combination of measures as dictated by individual site conditions. In determining whether installing a sediment basin is infeasible, permittees must consider public safety and may consider factors such as site soils, slope, and available area on-site. Permittees must document this determination of infeasibility in the [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.33 SWPPP].</big>
 +
 
 +
<noinclude>
 +
[[Category:Level 2 - Regulatory/Construction (CSW)]]
 +
</noinclude>

Latest revision as of 21:53, 7 August 2023

SECTION 14 TEMPORARY SEDIMENT BASINS

14.1

Temporary Sediment Basins.

14.2

Where ten (10) or more acres of disturbed soil (5 acres for sites discharging to special or impaired waters, see section 24) drain to a common location, permittees must provide a temporary sediment basin to provide treatment of the runoff before it leaves the construction site or enters surface waters. Permittees may convert a temporary sediment basin to a permanent basin after construction is complete. The temporary basin is no longer required when permanent cover has reduced the acreage of disturbed soil to less than ten (10) acres draining to a common location.

14.3

The temporary basin must provide live storage for a calculated volume of runoff from a two (2)-year, 24-hour storm from each acre drained to the basin or 1,800 cubic feet of live storage per acre drained, whichever is greater.

14.4

Where permittees have not calculated the two (2)-year, 24-hour storm runoff amount, the temporary basin must provide 3,600 cubic feet of live storage per acre of the basins' drainage area.

14.5

Permittees must design basin outlets to prevent short-circuiting and the discharge of floating debris.

14.6

Permittees must design the outlet structure to withdraw water from the surface to minimize the discharge of pollutants. Permittees may temporarily suspend the use of a surface withdrawal mechanism during frozen conditions. The basin must include a stabilized emergency overflow to prevent failure of pond integrity.

14.7

Permittees must provide energy dissipation for the basin outlet within 24 hours after connection to a surface water.

14.8

Permittees must locate temporary basins outside of surface waters and any buffer zone required in item 23.11.

14.9

Permittees must construct the temporary basins prior to disturbing 10 or more acres of soil draining to a common location.

14.10

Where a temporary sediment basin meeting the requirements of item 14.3 through 14.9 is infeasible, permittees must install effective sediment controls such as smaller sediment basins and/or sediment traps, silt fences, vegetative buffer strips or any appropriate combination of measures as dictated by individual site conditions. In determining whether installing a sediment basin is infeasible, permittees must consider public safety and may consider factors such as site soils, slope, and available area on-site. Permittees must document this determination of infeasibility in the SWPPP.