(Created page with "{{alert|This section of the manual is being developed|alert-under-construction}} ==SECTION 20 SWPPP AVAILABILITY==")
 
m (2023)
 
(6 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{alert|This section of the manual is being developed|alert-under-construction}}
+
==SECTION 20 SWPPP AVAILABILITY==
 +
 
 +
===20.1===
 +
<big>[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.33 SWPPP] Availability.</big>
 +
 
 +
===20.2===
 +
<big>[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.23 Permittees] must keep the SWPPP, on- site, or electronically available on-site, during normal working hours with personnel who have operational control over the applicable portion of the site, including all changes to the SWPPP, inspections, and maintenance records.</big>
  
==SECTION 20 SWPPP AVAILABILITY==
+
<noinclude>
 +
[[Category:Level 2 - Regulatory/Construction (CSW)]]
 +
</noinclude>

Latest revision as of 15:01, 8 August 2023

SECTION 20 SWPPP AVAILABILITY

20.1

SWPPP Availability.

20.2

Permittees must keep the SWPPP, on- site, or electronically available on-site, during normal working hours with personnel who have operational control over the applicable portion of the site, including all changes to the SWPPP, inspections, and maintenance records.

This page was last edited on 8 August 2023, at 15:01.