PKalinosky (talk | contribs) m (→Introduction) |
|||
(11 intermediate revisions by 4 users not shown) | |||
Line 2: | Line 2: | ||
[[File:20171026 113812.jpg|500 px|thumb|right|alt=image MPCA and local MS4 staff during an audit|<font size=2>MPCA and local MS4 staff during an MPCA audit</font size>]] | [[File:20171026 113812.jpg|500 px|thumb|right|alt=image MPCA and local MS4 staff during an audit|<font size=2>MPCA and local MS4 staff during an MPCA audit</font size>]] | ||
− | The Minnesota Pollution Control Agency (MPCA) staff conduct audits of | + | The Minnesota Pollution Control Agency (MPCA) staff conduct audits of Stormwater Pollution Prevention Programs (SWPPPs) to determine compliance with the [https://www.pca.state.mn.us/sites/default/files/wq-strm4-94.pdf MS4 General Permit] and to provide technical assistance to staff in regulated Municipal Separate Storm Sewer Systems (MS4s). The MPCA’s intent is to audit all SWPPPs for MS4s regulated under the MS4 General Permit every seven years. Between MPCA audits, it is recommended to conduct a self-audit to check your progress with meeting permit requirements. |
− | Conduct a self-audit using the [[media: | + | Conduct a self-audit using the [[media:Wq-strm4-29b.docx | Phase II MS4 Audit Report Form]]. The Audit Report Form is the same form MPCA staff use to determine the compliance status of each requirement after an audit is conducted. During the self-audit, you should review each permit requirement and note whether or not the activity is complete. |
During the self-audit, review your SWPPP document that was submitted to the MPCA upon application for permit coverage. The SWPPP document has, for each MCM, your MS4-specific measureable goals, established best management practices (BMPs), timeframes for new BMP implementation, and the name or position title of staff responsible for BMP implementation. The BMPs, measurable goals, and timeframes indicated in the SWPPP document may be changed if you feel your SWPPP would benefit from being updated after your self-audit or annual program evaluation. | During the self-audit, review your SWPPP document that was submitted to the MPCA upon application for permit coverage. The SWPPP document has, for each MCM, your MS4-specific measureable goals, established best management practices (BMPs), timeframes for new BMP implementation, and the name or position title of staff responsible for BMP implementation. The BMPs, measurable goals, and timeframes indicated in the SWPPP document may be changed if you feel your SWPPP would benefit from being updated after your self-audit or annual program evaluation. | ||
Line 10: | Line 10: | ||
Before conducting your self-audit, gather all files, documents, and materials related to your SWPPP, including annual reports, SWPPP document, public notices, maps, written procedures, enforcement action documentation, regulatory mechanism(s), etc. Documentation of the activity should be easily accessible and available for review. | Before conducting your self-audit, gather all files, documents, and materials related to your SWPPP, including annual reports, SWPPP document, public notices, maps, written procedures, enforcement action documentation, regulatory mechanism(s), etc. Documentation of the activity should be easily accessible and available for review. | ||
− | + | Please note that completing a self-audit, regardless of the results, does not preclude the MPCA from taking enforcement after an MPCA lead audit related to any of the activities required by the MS4 General Permit. If you have any questions relating to your SWPPP, please contact your [https://stormwater.pca.state.mn.us/index.php?title=MS4_staff_contact_information_and_staff_assignments MPCA MS4 staff]. | |
− | We have also included general questions MPCA staff could ask during an audit. These questions are to prompt thought about your SWPPP in areas MPCA staff may focus during the audit. MPCA staff will ask general questions during the audit, but also questions specific to your SWPPP and stormwater activities. The questions noted | + | We have included tips on enhancing your SWPPP for each MCM. These are not direct permit requirements, but methods MPCA staff have observed during audits that make local stormwater programs more effective. We have also included general questions MPCA staff could ask during an audit. These questions are to prompt thought about your SWPPP in areas MPCA staff may focus during the audit. MPCA staff will ask general questions during the audit, but also questions specific to your SWPPP and stormwater activities. The questions noted are not a final and complete list of questions that can or will be asked during an MPCA audit. In addition, please refer to the [https://www.youtube.com/watch?v=4XzbypwEALg&feature=youtu.be Self-audit webinar] for additional information. |
− | |||
− | |||
− | |||
− | |||
==Overall program management== | ==Overall program management== | ||
Line 72: | Line 68: | ||
*Maintain a database or spreadsheet to collect all required information for illicit discharge discoveries and complaints. | *Maintain a database or spreadsheet to collect all required information for illicit discharge discoveries and complaints. | ||
*Coordinate with other municipal operations (fire, police, etc.) to create the procedures for investigating, locating, and eliminating the source of illicit discharges and spill responses to ensure the procedure includes all relevant staff and tools that can be used in various situations (e.g. booms, spill response kits). | *Coordinate with other municipal operations (fire, police, etc.) to create the procedures for investigating, locating, and eliminating the source of illicit discharges and spill responses to ensure the procedure includes all relevant staff and tools that can be used in various situations (e.g. booms, spill response kits). | ||
− | *Train all staff on the [https:// | + | *Train all staff on the [https://www.pca.state.mn.us/sites/default/files/wq-strm4-94.pdf MS4 General Permit] requirements for illicit discharges, including police officers, fire fighters, and building officials. |
'''Questions and concepts to consider''' | '''Questions and concepts to consider''' | ||
Line 133: | Line 129: | ||
*What are your procedures for inspecting ponds, outfalls, and structural stormwater BMPs? | *What are your procedures for inspecting ponds, outfalls, and structural stormwater BMPs? | ||
*What are your procedures for street sweeping and deicing application? | *What are your procedures for street sweeping and deicing application? | ||
+ | |||
+ | [[Category:Level 3 - Regulatory/Municipal (MS4)/Guidance, outreach materials, miscellaneous information]] | ||
+ | [[Category:Level 2 - Regulatory/Municipal (MS4)]] |
The Minnesota Pollution Control Agency (MPCA) staff conduct audits of Stormwater Pollution Prevention Programs (SWPPPs) to determine compliance with the MS4 General Permit and to provide technical assistance to staff in regulated Municipal Separate Storm Sewer Systems (MS4s). The MPCA’s intent is to audit all SWPPPs for MS4s regulated under the MS4 General Permit every seven years. Between MPCA audits, it is recommended to conduct a self-audit to check your progress with meeting permit requirements.
Conduct a self-audit using the Phase II MS4 Audit Report Form. The Audit Report Form is the same form MPCA staff use to determine the compliance status of each requirement after an audit is conducted. During the self-audit, you should review each permit requirement and note whether or not the activity is complete.
During the self-audit, review your SWPPP document that was submitted to the MPCA upon application for permit coverage. The SWPPP document has, for each MCM, your MS4-specific measureable goals, established best management practices (BMPs), timeframes for new BMP implementation, and the name or position title of staff responsible for BMP implementation. The BMPs, measurable goals, and timeframes indicated in the SWPPP document may be changed if you feel your SWPPP would benefit from being updated after your self-audit or annual program evaluation.
Before conducting your self-audit, gather all files, documents, and materials related to your SWPPP, including annual reports, SWPPP document, public notices, maps, written procedures, enforcement action documentation, regulatory mechanism(s), etc. Documentation of the activity should be easily accessible and available for review.
Please note that completing a self-audit, regardless of the results, does not preclude the MPCA from taking enforcement after an MPCA lead audit related to any of the activities required by the MS4 General Permit. If you have any questions relating to your SWPPP, please contact your MPCA MS4 staff.
We have included tips on enhancing your SWPPP for each MCM. These are not direct permit requirements, but methods MPCA staff have observed during audits that make local stormwater programs more effective. We have also included general questions MPCA staff could ask during an audit. These questions are to prompt thought about your SWPPP in areas MPCA staff may focus during the audit. MPCA staff will ask general questions during the audit, but also questions specific to your SWPPP and stormwater activities. The questions noted are not a final and complete list of questions that can or will be asked during an MPCA audit. In addition, please refer to the Self-audit webinar for additional information.
Tips for overall program management
Questions and concepts to consider
Tips for a successful public education and outreach program
Questions and concepts to consider
Tips for a successful public involvement program
Questions and concepts to consider
Tips for a successful illicit discharge detection & elimination program
Questions and concepts to consider
Tips for a successful construction stormwater program
Questions and concepts to consider
Tips for a successful post-construction stormwater program
Questions and concepts to consider
Tips for a successful pollution prevention program
Questions and concepts to consider