|
|
(13 intermediate revisions by 2 users not shown) |
Line 1: |
Line 1: |
− | In order to operate an effective Stormwater Pollution Prevention Program (SWPPP), there are six different [[Minimum Control Measures (MCMs)]] that must be incorporated into the SWPPP.
| + | #REDIRECT [[Stormwater Program for Municipal Separate Storm Sewer Systems (MS4)]] |
− | | |
− | [[MCM 1 Public Education and Outreach]]
| |
− | *Public education outreach materials, public education implementation plan, examples of how to document outreach activities, and examples of outreach materials.
| |
− | [[MCM 2 Public Participation/Involvement]]
| |
− | *Examples of how to document events held to give the public a voice in their local SWPPP.
| |
− | [[MCM 3 Illicit Discharge Detection and Elimination]] | |
− | *Regulatory mechanism to prohibit illicit discharges, illicit discharge recognition training, procedures for investigating, locating, and eliminating the source of illicit discharges, and spill response procedures.
| |
− | [[MCM 4 Construction Site Stormwater Control]]
| |
− | *Site plan review procedures & items to evaluate, construction site inspection procedures and inspection checklists, and documentation of site plan reviews.
| |
− | [[MCM 5 Post-Construction Stormwater Management]]
| |
− | *Legal mechanisms for long-term maintenance of structural stormwater best management practices (BMPs), site plan review checklists.
| |
− | [[MCM 6 Pollution Prevention/Good Housekeeping]]
| |
− | *Facilities inventory examples; procedures for determining pond effectiveness of treating total suspended solids (TSS) and total phosphorus (TP); inspection checklists for documenting structural stormwater BMPs, stormwater management ponds, outfalls, stockpiles, and storage and material handling areas; employee training commensurate with the employee's job responsibilities.
| |