Tag: New redirect
 
(12 intermediate revisions by 2 users not shown)
Line 1: Line 1:
In order to operate an effective Stormwater Pollution Prevention Program (SWPPP), there are six different components known as [[Minimum Control Measures (MCMs)]] that must be incorporated into the SWPPP:
+
#REDIRECT [[Stormwater Program for Municipal Separate Storm Sewer Systems (MS4)]]
 
 
[[MCM 1 Public Education and Outreach]]<br/>
 
Public education outreach materials, public education implementation plan, examples of how to document outreach activities, and examples of outreach materials.
 
 
 
[[MCM 2 Public Participation/Involvement]]<br/>
 
Examples of how to document events held to give the public a voice in their local SWPPP.
 
 
 
[[MCM 3 Illicit Discharge Detection and Elimination]]<br/>
 
Regulatory mechanism to prohibit illicit discharges, illicit discharge recognition training, procedures for investigating, locating, and eliminating the source of illicit discharges, and spill response procedures.
 
 
 
[[MCM 4 Construction Site Stormwater Control]]<br/>
 
Site plan review procedures & items to evaluate, construction site inspection procedures and inspection checklists, and documentation of site plan reviews.
 
 
 
[[MCM 5 Post-Construction Stormwater Management]]<br/>
 
Legal mechanisms for long-term maintenance of structural stormwater best management practices (BMPs), site plan review checklists.
 
 
 
[[MCM 6 Pollution Prevention/Good Housekeeping]]<br/>
 
Facilities inventory examples; procedures for determining pond effectiveness of treating total suspended solids (TSS) and total phosphorus (TP); inspection checklists for documenting structural stormwater BMPs, stormwater management ponds, outfalls, stockpiles, and storage and material handling areas; employee training commensurate with the employee's job responsibilities.
 

Latest revision as of 18:58, 22 July 2024

This page was last edited on 22 July 2024, at 18:58.