PKalinosky (talk | contribs) (Changes Approved_PK) |
PKalinosky (talk | contribs) |
||
Line 12: | Line 12: | ||
:*A [[#Model language|long term maintenance agreement]] for private structural stormwater BMPs. | :*A [[#Model language|long term maintenance agreement]] for private structural stormwater BMPs. | ||
:*[https://stormwater.pca.state.mn.us/index.php?title=Site_plan_review_procedure Site plan review procedures] to ensure the post-construction stormwater management is in accordance with the regulatory mechanism. | :*[https://stormwater.pca.state.mn.us/index.php?title=Site_plan_review_procedure Site plan review procedures] to ensure the post-construction stormwater management is in accordance with the regulatory mechanism. | ||
− | :*All documentation described [https://stormwater.pca.state.mn.us/ | + | :*All documentation described [https://stormwater.pca.state.mn.us/images/d/dd/MS4DocumentaionRequired.pdf here]. |
==Resources== | ==Resources== |
Paved surfaces exacerbate the negative impacts to stormwater, including increasing the stormwater discharge volume and pollutants in stormwater. Managing stormwater onsite post-construction is the more effective way to mitigate these impacts. Minimum Control Measure (MCM) 5 of the municipal separate storm sewer system (MS4) General Permit requires permittees to have and enforce a post-construction stormwater management program that prevents or reduces stormwater pollution in new- and re- development projects.
The post-construction stormwater management program should include:
Click on the blue links above in the "MS4 General Permit requirements" section to get more information and resources specific to those permit requirements. In addition, all resources related to MCM 5 are below.
Fact sheets and guidance documents should provide background information and tips to inform your approach to implementing MCM 5 - Post-Construction Stormwater Management.
Fill in the blanks and adopt ordinance or long-term maintenance agreement language that meets the regulatory mechanism requirements for MCM 5 - Post-Construction Stormwater Management.
Documentation and tracking templates are examples that local stormwater staff are currently using to meet the MS4 General Permit requirements for MCM 5 - Post-Construction Stormwater Management.
Below are methods that local stormwater staff are currently using to meet the site plan review documentation Post-Construction Stormwater Management requirements in the MS4 General Permit for MCM 5 - Post-Construction Stormwater Management.
Example procedures are those that local stormwater staff are currently using to meet the MS4 PART III.STORMWATER POLLUTION PREVENTION PROGRAM (SWPPP)#5. Post-Construction Stormwater Management| MS4 General Permit requirements for MCM 5 - Post-Construction Stormwater Management.
The information in this section provides MS4 permittees with tools they can use to meet MCM 5, which addresses post-construction stormwater management.