m |
m |
||
Line 2,215: | Line 2,215: | ||
<tr> | <tr> | ||
− | <td rowspan= | + | <td rowspan=9>Impaired waters</td> |
<td>Pollution prevention</td> | <td>Pollution prevention</td> | ||
<td>I/C<sup>a</sup></td> | <td>I/C<sup>a</sup></td> |
Pollution prevention | Pollution prevention | Municipal | |
I/Ca | |||
Runoff minimization | Volume reduction | ||
Capture and re-use | |||
Temporary construction sediment control | Perimeter | ||
Slope | |||
Drainageway | |||
Otherb | |||
Inspect & maintain | |||
Minimize runoff | Reduce volume | Better Site Design | |
Runoff minimization | Volume reduction | ||
Capture and re-use | |||
Bioretention | Infiltration recharge | ||
Filtration partial recharge | |||
Infiltration filtration recharge | |||
Infiltration | Infiltration basin | ||
Infiltration trench | |||
Dry well | |||
Underground system | |||
Minimize runoff | Increase recharge | Better Site Design | |
Runoff minimization | Volume reduction | ||
Capture and re-use | |||
Bioretention | Infiltration recharge | ||
Filtration partial recharge | |||
Infiltration filtration recharge | |||
Filtration | Media (sand) | ||
Vegetative | |||
Infiltration | Infiltration basin | ||
Infiltration trench | |||
Dry well | |||
Underground system | |||
Minimize runoff | Improve water quality | Better Site Design | |
Pollution prevention | Residential | ||
Municipall | |||
I/Ca | |||
Temporary construction sediment control | Perimeter | ||
Slope | |||
Drainageway | |||
Otherb | |||
Inspect & maintain | |||
Filtration | Vegetative | ||
Stormwater ponds | With extended detention | ||
Without extended detention | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Pond wetland system | |||
Minimize runoff | Reduce costs | Better Site Design | |
Temporary construction sediment control | Pre-construction | ||
Local feasibility | Pollution prevention | Residential | |
Municipal | |||
Temporary construction sediment control | Perimeter | ||
Slope | |||
Drainageway | |||
Otherb | |||
Cold climate | Better Site Design | ||
Pollution prevention | Municipal | ||
I/Ca | |||
Filtration | Media (sand) | ||
Vegetative | |||
Stormwater ponds | With extended detention | ||
Without extended detention | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetlandd | |||
Pond wetland system | |||
Supplemental treatment | Filtration devices | ||
Hydrodynamic devices | |||
Temporary construction sediment control | Better Site Design | ||
Pollution prevention | Municipal | ||
I/Ca | |||
Temporary construction sediment control | Pre-construction | ||
Perimeter | |||
Slope | |||
Drainageway | |||
Otherb | |||
Inspect & maintain | |||
Bioretention | Filtration | ||
Filtration | Media (sand) | ||
Vegetative | |||
Stormwater ponds | With extended detention | ||
Without extended detention | |||
Constructed wetlands | Pond wetland system | ||
Supplemental treatments | Filtration devices | ||
Hydrodynamic devices | |||
Watershed factors | Lakes | Better Site Design | |
Pollution preventionn | Residential | ||
Municipal | |||
I/Ca | |||
Runoff minimization | Volume reduction | ||
Temporary construction sediment control | Perimeter | ||
Slope | |||
Drainageway | |||
Otherb | |||
Bioretention | Infiltration recharge | ||
Filtration partial recharge | |||
Infiltration filtration recharge | |||
Filtration | |||
Filtration | |||
Media (sand) | |||
Vegetative | |||
Infiltration | Infiltration basin | ||
Infiltration trench | |||
Dry well | |||
Underground system | |||
Stormwater ponds | With extended detention | ||
Without extended detention | |||
Constructed wetlands | Pond wetland system | ||
Supplemental treatment | Chemical biological treatment | ||
Watershed factors | Trout resources | Better Site Design | |
Runoff minimization | Volume reduction | ||
Temporary construction sediment control | Drainageway | ||
Bioretention | Infiltration recharge | ||
Filtration partial rechargee | |||
Infiltration filtration recharge | |||
Filtration | |||
Filtration | Media (sand) | ||
Vegetative | |||
Infiltration | Infiltration basin | ||
Infiltration trench | |||
Dry well | |||
Underground system | |||
Constructed wetlands | Pond wetland system | ||
Watershed factors | Drinking water | Better Site Design | |
Pollution prevention | Residential | ||
Municipal | |||
Runoff minimization | Volume reduction | ||
Temporary construction sediment control | Perimeter | ||
Slope | |||
Drainageway | |||
Otherb | |||
Bioretention | Infiltration recharge | ||
Filtration partial recharge | |||
Infiltration filtration recharge | |||
Infiltration | Infiltration basin | ||
Infiltration trench | |||
Dry well | |||
Underground system | |||
Stormwater ponds | With extended detention | ||
Without extended detention | |||
Constructed wetlands | Pond wetland system | ||
Watershed factors | Wetlands (calcareous fens) | Better Site Design | |
Bioretention | Filtration partial recharge | ||
Infiltration filtration recharge | |||
Filtration | |||
Media (sand) | |||
Vegetative | |||
Infiltration | Infiltration basin | ||
Infiltration trench | |||
Dry well | |||
Underground system | |||
Stormwater ponds | Stormwater ponds | ||
Without extended detention | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Pond wetland system | |||
Supplemental treatment | Chemical biological treatment | ||
Watershed factors | Impaired waters | Better Site Design | |
Pollution prevention | Residential | ||
Municipal | |||
Runoff minimization | Volume reduction | ||
Temporary construction sediment control | Perimeter | ||
Slope | |||
Drainageway | |||
Bioretention | Infiltration filtration recharge | ||
Filtration | |||
Filtration | Media (sand) | ||
Vegetative | |||
Stormwater ponds | Stormwater ponds | ||
Without extended detention | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Pond wetland system | |||
Climate and terrain | Active karst | Runoff minimization | Volume reduction |
Capture and re-use | |||
Temporary construction sediment control | Slope | ||
Bioretention | Filtration | ||
Filtration | Media (sand) | ||
Vegetative | |||
Constructed wetland | Shallow wetland | ||
Low infiltration soil | Runoff minimization | Volume reduction | |
Runoff minimization | Capture and re-use | ||
Temporary construction sediment control | Perimeter | ||
Slope | |||
Stormwater ponds | Stormwater ponds | ||
Without extended detention | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Pond wetland system | |||
Climate and terrain | High snowfall | Pollution prevention | Municipal |
Runoff minimization | Volume reduction | ||
Capture and re-use | |||
Temporary construction sediment control | Slope | ||
Drainageway | |||
Inspect & maintain | |||
Bioretention | Infiltration filtration recharge | ||
Filtration | |||
Infiltration | Infiltration trench | ||
Dry well | |||
Underground system | |||
Stormwater ponds | Stormwater ponds | ||
Without extended detention | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Pond wetland system | |||
Supplemental treatment | Filtration devices | ||
Hydrodynamic devices | |||
Low rainfall | Bioretention | Filtration | |
Filtration | Media (sand) | ||
Vegetative | |||
Stormwater ponds | Without extended detention | ||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Stormwater treatment suitability | Recharge | Better Site Design | |
Runoff minimization | Volume reduction | ||
Capture and re-use | |||
Bioretention | Infiltration recharge | ||
Filtration partial recharge | |||
Infiltration filtration recharge | |||
Infiltration | Infiltration basin | ||
Infiltration trench | |||
Dry well | |||
Underground system | |||
Water quality | Better Site Design | ||
Pollution prevention | Residential | ||
Municipal | |||
I/Ca | |||
Temporary construction sediment control | Perimeter | ||
Slope | |||
Drainageway | |||
Otherb | |||
Inspect & maintain | |||
Filtration | Media (sand) | ||
Vegetative | |||
Stormwater ponds | Stormwater ponds | ||
Without extended detention | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Pond wetland system | |||
Stormwater treatment suitability | Channel protection | Better Site Design | |
Pollution prevention | Municipal | ||
Runoff minimization | Volume reduction | ||
Temporary construction sediment control | Perimeter | ||
Slope | |||
Drainageway | |||
Stormwater ponds | Stormwater ponds | ||
Without extended detention | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Pond wetland system | |||
Stormwater treatment suitability | Peak discharge | Pollution prevention | Municipal |
Runoff minimization | Volume reduction | ||
Temporary construction sediment control | Slope | ||
Bioretention | Infiltration recharge | ||
Filtration partial recharge | |||
Filtration | |||
Filtration | Media (sand) | ||
Vegetative | |||
Infiltration | Infiltration basin | ||
Infiltration trench | |||
Dry well | |||
Underground system | |||
Stormwater ponds | Stormwater ponds | ||
Without extended detention | |||
Shallow wetland | |||
ED shallow wetland | |||
Pond wetland system | |||
PSHc | Better Site Design | ||
Pollution prevention | Residential | ||
Municipal | |||
I/Ca | |||
Filtration | Media (sand) | ||
Vegetative | |||
Infiltration | Infiltration basin | ||
Physical feasibility | Soils | Temporary construction sediment control | Perimeter |
Slope | |||
Drainageway | |||
Bioretention | Filtration | ||
Filtration | Media (sand) | ||
Vegetative | |||
Elevation difference | Bioretention | Filtration | |
Depth to rock | Better Site Design | ||
Bioretention | Filtration | ||
Filtration | Media (sand) | ||
Vegetative | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Supplemental treatment | Hydrodynamic devices | ||
Physical feasibility | Depth to water table | Better Site Design | |
Runoff minimization | Capture and re-use | ||
Bioretention | Filtration | ||
Filtration | Media (sand) | ||
Vegetative | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Supplemental treatment | Hydrodynamic devices | ||
Site slope | Better Site Design | ||
Temporary construction sediment control | Perimeter | ||
Slope | |||
Drainageway | |||
Physical feasibility | Ultra-urban | Better Site Design | |
Pollution prevention | Residential | ||
Municipal | |||
Runoff minimization | Capture and re-use | ||
Temporary construction sediment control | Perimeter | ||
Slope | |||
Bioretention | Infiltration recharge | ||
Filtration partial recharge | |||
Infiltration filtration rechargee | |||
Filtration | |||
Filtration | Media (sand) | ||
Vegetative | |||
Infiltration | Underground system | ||
Supplemental treatment | Filtration devices | ||
Hydrodynamic devicess | |||
Community and environment | Ease of maintenance | Better Site Design | |
Pollution prevention | Residential | ||
Municipal | |||
Temporary construction sediment control | Perimeter | ||
Slope | |||
Filtration | Vegetative | ||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Supplemental treatment | Filtration devices | ||
Community acceptance | Better Site Design | ||
Pollution prevention | Residential | ||
Municipal | |||
Temporary construction sediment control | Perimeter | ||
Perimeter | |||
Slope | |||
Bioretention | Filtration | ||
Filtration | Vegetative | ||
Stormwater ponds | Stormwater ponds | ||
Without extended detention | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Pond wetland system | |||
Supplemental treatment | Filtration devices | ||
Community and environment | Construction cost | Better Site Design | |
Temporary construction sediment control | Pre-construction | ||
Perimeter | |||
Filtration | Vegetative | ||
Habitat quality | Better Site Design | ||
Bioretention | Infiltration recharge | ||
Filtration partial recharge | |||
Infiltration filtration recharge | |||
Filtration | |||
Filtration | Media (sand) | ||
Vegetative | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Pond wetland system | |||
Nuisance | Infiltration | Infiltration basin | |
Infiltration trench | |||
Dry well | |||
Underground system | |||
Location-specific restrictions and setbacks | Pollution prevention | Municipal | |
Temporary construction sediment control | Drainageway | ||
Knowledge of performance and reliability | Better Site Design | ||
Pollution prevention | Municipal | ||
I/Ca | |||
Runoff minimization | Volume reduction | ||
Temporary construction sediment control | Perimeter | ||
Slope | |||
Drainageway | |||
Inspect & maintain | |||
Bioretention | Filtration | ||
Filtration | Media (sand) | ||
Vegetative | |||
Stormwater ponds | Stormwater ponds | ||
Without extended detention | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Pond wetland system | |||
Pollution prevention | Bioretention | Filtration | |
Filtration | Vegetative | ||
Minimize runoff | Reduce volume | Bioretention | Filtration |
Bioretention | Filtration | ||
Filtration | Media (sand) | ||
Filtration | Vegetative | ||
Constructed wetlands | Shallow wetland | ||
Constructed wetlands | ED shallow wetland | ||
Constructed wetlands | Pond wetland system | ||
Minimize runoff | Increase recharge | Bioretention | Filtration |
Filtration | Vegetative | ||
Stormwater ponds | With extended detention | ||
Stormwater ponds | Without extended detention | ||
Constructed wetlands | Shallow wetland | ||
Constructed wetlands | ED shallow wetland | ||
Constructed wetlands | Pond wetland system | ||
Minimize runoff | Improve water quality | X | X |
Runoff minimization | Volume reduction | ||
Runoff minimization | Capture and re-use | ||
Bioretention | Infiltration recharge | ||
Bioretention | Filtration partial recharge | ||
Bioretention | Infiltration filtration recharge | ||
Bioretention | Filtration | ||
Filtration | Media (sand) | ||
Infiltration | Infiltration basin | ||
Infiltration | Infiltration trench | ||
Infiltration | Dry well | ||
Infiltration | Underground system | ||
Supplemental treatment | Chemical biological treatment | ||
Supplemental treatment | Filtration devices | ||
Supplemental treatment | Hydrodynamic devices | ||
Minimize runoff | Reduce costs | Pollution prevention | Residential |
Pollution prevention | Municipal | ||
Pollution prevention | I/Ca | ||
Runoff minimization | Volume reduction | ||
Runoff minimization | Capture and re-use | ||
Temporary construction sediment control | Inspect & maintain | ||
Bioretention | Infiltration recharge | ||
Bioretention | Filtration partial recharge | ||
Bioretention | Infiltration filtration recharge | ||
Bioretention | Filtration | ||
Filtration | Vegetative | ||
Minimize runoff | Local feasibility | Pollution prevention | I/Ca |
Minimize runoff | Cold climate | Pollution prevention | Residential |
Runoff minimization | Volume reduction | ||
Temporary construction sediment control | Perimeter | ||
Temporary construction sediment control | Slope | ||
Temporary construction sediment control | Drainageway | ||
Bioretention | Infiltration recharge | ||
Bioretention | Filtration partial recharge | ||
Bioretention | Infiltration filtration recharge | ||
Bioretention | Filtration | ||
Infiltration | Infiltration basin | ||
Infiltration | Infiltration trench | ||
Infiltration | Dry well | ||
Infiltration | Underground system | ||
Minimize runoff | Land use | Bioretention | Infiltration recharge |
Bioretention | Filtration partial recharge | ||
Bioretention | Infiltration filtration recharge | ||
Bioretention | Filtration | ||
Filtration | Vegetative | ||
Supplemental treatment | Filtration devices | ||
Supplemental treatment | Hydrodynamic devices | ||
Temporary construction sediment control | Runoff minimization | Volume reduction | |
Capture and re-use | |||
Bioretention | Infiltration recharge | ||
Filtration partial recharge | |||
Infiltration filtration recharge | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Supplemental treatment | Chemical biological treatment | ||
Watershed factors | Lakes | Constructed wetlands | Shallow wetland |
ED shallow wetland | |||
Watershed factors | Trout resources | Runoff minimization | Capture and re-use |
Temporary construction sediment control | Otherb | ||
Constructed wetlands | Shallow wetland | ||
Constructed wetlands | ED shallow wetland | ||
Drinking water | Pollution preventions | I/Ca | |
Runoff minimization | Capture and re-use | ||
Filtration | Vegetative | ||
Wetlands (calcareous fens) | Runoff minimization | Infiltration recharge | |
Bioretention | Volume reduction | ||
Impaired waters | Pollution prevention | I/Ca | |
Runoff minimization | Capture and re-use | ||
Temporary construction sediment control | Otherb | ||
Bioretention | Infiltration recharge | ||
Bioretention | Filtration partial recharge | ||
Infiltration | Infiltration basin | ||
Infiltration | Infiltration trench | ||
Infiltration | Dry well | ||
Infiltration | Underground system |