m |
m |
||
Line 2,905: | Line 2,905: | ||
<tr> | <tr> | ||
− | <td>Physical feasibility</td> | + | <td rowspan=27>Physical feasibility</td> |
<td>Surface area</td> | <td>Surface area</td> | ||
<td>Stormwater ponds</td> | <td>Stormwater ponds</td> | ||
Line 2,911: | Line 2,911: | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
− | |||
<td>Surface area</td> | <td>Surface area</td> | ||
<td>Stormwater ponds</td> | <td>Stormwater ponds</td> | ||
Line 2,918: | Line 2,917: | ||
<tr> | <tr> | ||
− | |||
<td>Drainage area</td> | <td>Drainage area</td> | ||
<td>Constructed wetlands</td> | <td>Constructed wetlands</td> | ||
Line 2,925: | Line 2,923: | ||
<tr> | <tr> | ||
− | |||
<td>Drainage area</td> | <td>Drainage area</td> | ||
<td>Constructed wetlands</td> | <td>Constructed wetlands</td> | ||
Line 2,933: | Line 2,930: | ||
<tr> | <tr> | ||
− | |||
<td>Drainage area</td> | <td>Drainage area</td> | ||
<td>Constructed wetlands</td> | <td>Constructed wetlands</td> | ||
Line 2,940: | Line 2,936: | ||
<tr> | <tr> | ||
− | |||
<td>Soils</td> | <td>Soils</td> | ||
<td>Infiltration</td> | <td>Infiltration</td> | ||
<td>Infiltration basin</td> | <td>Infiltration basin</td> | ||
</tr> | </tr> | ||
+ | |||
<tr> | <tr> | ||
− | |||
<td>Soils</td> | <td>Soils</td> | ||
<td>Infiltration</td> | <td>Infiltration</td> | ||
<td>Infiltration trench</td> | <td>Infiltration trench</td> | ||
</tr> | </tr> | ||
+ | |||
<tr> | <tr> | ||
− | |||
<td>Soils</td> | <td>Soils</td> | ||
<td>Infiltration</td> | <td>Infiltration</td> | ||
Line 2,959: | Line 2,954: | ||
<tr> | <tr> | ||
− | |||
<td>Soils</td> | <td>Soils</td> | ||
<td>Infiltration</td> | <td>Infiltration</td> | ||
Line 2,966: | Line 2,960: | ||
<tr> | <tr> | ||
− | |||
<td>Depth to rock</td> | <td>Depth to rock</td> | ||
<td>Bioretention</td> | <td>Bioretention</td> | ||
Line 2,974: | Line 2,967: | ||
<tr> | <tr> | ||
− | |||
<td>Depth to rock</td> | <td>Depth to rock</td> | ||
<td>Bioretention</td> | <td>Bioretention</td> | ||
Line 2,981: | Line 2,973: | ||
<tr> | <tr> | ||
− | |||
<td>Depth to rock</td> | <td>Depth to rock</td> | ||
<td>Bioretention</td> | <td>Bioretention</td> | ||
Line 2,989: | Line 2,980: | ||
<tr> | <tr> | ||
− | |||
<td>Depth to rock</td> | <td>Depth to rock</td> | ||
<td>Infiltration</td> | <td>Infiltration</td> | ||
Line 2,996: | Line 2,986: | ||
<tr> | <tr> | ||
− | |||
<td>Depth to rock</td> | <td>Depth to rock</td> | ||
<td>Infiltration</td> | <td>Infiltration</td> | ||
Line 3,004: | Line 2,993: | ||
<tr> | <tr> | ||
− | |||
<td>Depth to rock</td> | <td>Depth to rock</td> | ||
<td>Infiltration</td> | <td>Infiltration</td> | ||
Line 3,011: | Line 2,999: | ||
<tr> | <tr> | ||
− | |||
<td>Depth to rock</td> | <td>Depth to rock</td> | ||
<td>Infiltration</td> | <td>Infiltration</td> | ||
Line 3,018: | Line 3,005: | ||
<tr> | <tr> | ||
− | |||
<td>Depth to rock</td> | <td>Depth to rock</td> | ||
<td>Stormwater ponds</td> | <td>Stormwater ponds</td> | ||
Line 3,025: | Line 3,011: | ||
<tr> | <tr> | ||
− | |||
<td>Depth to water table</td> | <td>Depth to water table</td> | ||
<td>Infiltration</td> | <td>Infiltration</td> | ||
Line 3,032: | Line 3,017: | ||
<tr> | <tr> | ||
− | |||
<td>Depth to water table</td> | <td>Depth to water table</td> | ||
<td>Infiltration</td> | <td>Infiltration</td> | ||
Line 3,039: | Line 3,023: | ||
<tr> | <tr> | ||
− | |||
<td>Depth to water table</td> | <td>Depth to water table</td> | ||
<td>Infiltration</td> | <td>Infiltration</td> | ||
Line 3,046: | Line 3,029: | ||
<tr> | <tr> | ||
− | |||
<td>Depth to water table</td> | <td>Depth to water table</td> | ||
<td>Infiltration</td> | <td>Infiltration</td> | ||
Line 3,053: | Line 3,035: | ||
<tr> | <tr> | ||
− | |||
<td>Ultra-urban</td> | <td>Ultra-urban</td> | ||
<td>Stormwater ponds</td> | <td>Stormwater ponds</td> | ||
Line 3,060: | Line 3,041: | ||
<tr> | <tr> | ||
− | |||
<td>Ultra-urban</td> | <td>Ultra-urban</td> | ||
<td>Stormwater ponds</td> | <td>Stormwater ponds</td> | ||
Line 3,067: | Line 3,047: | ||
<tr> | <tr> | ||
− | |||
<td>Ultra-urban</td> | <td>Ultra-urban</td> | ||
<td>Stormwater ponds</td> | <td>Stormwater ponds</td> | ||
Line 3,074: | Line 3,053: | ||
<tr> | <tr> | ||
− | |||
<td>Ultra-urban</td> | <td>Ultra-urban</td> | ||
<td>Constructed wetlands</td> | <td>Constructed wetlands</td> | ||
Line 3,082: | Line 3,060: | ||
<tr> | <tr> | ||
− | |||
<td>Ultra-urban</td> | <td>Ultra-urban</td> | ||
<td>Constructed wetlands</td> | <td>Constructed wetlands</td> | ||
<td>ED shallow wetland</td> | <td>ED shallow wetland</td> | ||
</tr> | </tr> | ||
+ | |||
<tr> | <tr> | ||
− | |||
<td>Ultra-urban</td> | <td>Ultra-urban</td> | ||
<td>Constructed wetlands</td> | <td>Constructed wetlands</td> |
Pollution prevention | Pollution prevention | Municipal | |
I/Ca | |||
Runoff minimization | Volume reduction | ||
Capture and re-use | |||
Temporary construction sediment control | Perimeter | ||
Slope | |||
Drainageway | |||
Otherb | |||
Inspect & maintain | |||
Minimize runoff | Reduce volume | Better Site Design | |
Runoff minimization | Volume reduction | ||
Capture and re-use | |||
Bioretention | Infiltration recharge | ||
Filtration partial recharge | |||
Infiltration filtration recharge | |||
Infiltration | Infiltration basin | ||
Infiltration trench | |||
Dry well | |||
Underground system | |||
Minimize runoff | Increase recharge | Better Site Design | |
Runoff minimization | Volume reduction | ||
Capture and re-use | |||
Bioretention | Infiltration recharge | ||
Filtration partial recharge | |||
Infiltration filtration recharge | |||
Filtration | Media (sand) | ||
Vegetative | |||
Infiltration | Infiltration basin | ||
Infiltration trench | |||
Dry well | |||
Underground system | |||
Minimize runoff | Improve water quality | Better Site Design | |
Pollution prevention | Residential | ||
Municipall | |||
I/Ca | |||
Temporary construction sediment control | Perimeter | ||
Slope | |||
Drainageway | |||
Otherb | |||
Inspect & maintain | |||
Filtration | Vegetative | ||
Stormwater ponds | With extended detention | ||
Without extended detention | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Pond wetland system | |||
Minimize runoff | Reduce costs | Better Site Design | |
Temporary construction sediment control | Pre-construction | ||
Local feasibility | Pollution prevention | Residential | |
Municipal | |||
Temporary construction sediment control | Perimeter | ||
Slope | |||
Drainageway | |||
Otherb | |||
Cold climate | Better Site Design | ||
Pollution prevention | Municipal | ||
I/Ca | |||
Filtration | Media (sand) | ||
Vegetative | |||
Stormwater ponds | With extended detention | ||
Without extended detention | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetlandd | |||
Pond wetland system | |||
Supplemental treatment | Filtration devices | ||
Hydrodynamic devices | |||
Temporary construction sediment control | Better Site Design | ||
Pollution prevention | Municipal | ||
I/Ca | |||
Temporary construction sediment control | Pre-construction | ||
Perimeter | |||
Slope | |||
Drainageway | |||
Otherb | |||
Inspect & maintain | |||
Bioretention | Filtration | ||
Filtration | Media (sand) | ||
Vegetative | |||
Stormwater ponds | With extended detention | ||
Without extended detention | |||
Constructed wetlands | Pond wetland system | ||
Supplemental treatments | Filtration devices | ||
Hydrodynamic devices | |||
Watershed factors | Lakes | Better Site Design | |
Pollution preventionn | Residential | ||
Municipal | |||
I/Ca | |||
Runoff minimization | Volume reduction | ||
Temporary construction sediment control | Perimeter | ||
Slope | |||
Drainageway | |||
Otherb | |||
Bioretention | Infiltration recharge | ||
Filtration partial recharge | |||
Infiltration filtration recharge | |||
Filtration | |||
Filtration | |||
Media (sand) | |||
Vegetative | |||
Infiltration | Infiltration basin | ||
Infiltration trench | |||
Dry well | |||
Underground system | |||
Stormwater ponds | With extended detention | ||
Without extended detention | |||
Constructed wetlands | Pond wetland system | ||
Supplemental treatment | Chemical biological treatment | ||
Watershed factors | Trout resources | Better Site Design | |
Runoff minimization | Volume reduction | ||
Temporary construction sediment control | Drainageway | ||
Bioretention | Infiltration recharge | ||
Filtration partial rechargee | |||
Infiltration filtration recharge | |||
Filtration | |||
Filtration | Media (sand) | ||
Vegetative | |||
Infiltration | Infiltration basin | ||
Infiltration trench | |||
Dry well | |||
Underground system | |||
Constructed wetlands | Pond wetland system | ||
Watershed factors | Drinking water | Better Site Design | |
Pollution prevention | Residential | ||
Municipal | |||
Runoff minimization | Volume reduction | ||
Temporary construction sediment control | Perimeter | ||
Slope | |||
Drainageway | |||
Otherb | |||
Bioretention | Infiltration recharge | ||
Filtration partial recharge | |||
Infiltration filtration recharge | |||
Infiltration | Infiltration basin | ||
Infiltration trench | |||
Dry well | |||
Underground system | |||
Stormwater ponds | With extended detention | ||
Without extended detention | |||
Constructed wetlands | Pond wetland system | ||
Watershed factors | Wetlands (calcareous fens) | Better Site Design | |
Bioretention | Filtration partial recharge | ||
Infiltration filtration recharge | |||
Filtration | |||
Media (sand) | |||
Vegetative | |||
Infiltration | Infiltration basin | ||
Infiltration trench | |||
Dry well | |||
Underground system | |||
Stormwater ponds | Stormwater ponds | ||
Without extended detention | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Pond wetland system | |||
Supplemental treatment | Chemical biological treatment | ||
Watershed factors | Impaired waters | Better Site Design | |
Pollution prevention | Residential | ||
Municipal | |||
Runoff minimization | Volume reduction | ||
Temporary construction sediment control | Perimeter | ||
Slope | |||
Drainageway | |||
Bioretention | Infiltration filtration recharge | ||
Filtration | |||
Filtration | Media (sand) | ||
Vegetative | |||
Stormwater ponds | Stormwater ponds | ||
Without extended detention | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Pond wetland system | |||
Climate and terrain | Active karst | Runoff minimization | Volume reduction |
Capture and re-use | |||
Temporary construction sediment control | Slope | ||
Bioretention | Filtration | ||
Filtration | Media (sand) | ||
Vegetative | |||
Constructed wetland | Shallow wetland | ||
Low infiltration soil | Runoff minimization | Volume reduction | |
Runoff minimization | Capture and re-use | ||
Temporary construction sediment control | Perimeter | ||
Slope | |||
Stormwater ponds | Stormwater ponds | ||
Without extended detention | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Pond wetland system | |||
Climate and terrain | High snowfall | Pollution prevention | Municipal |
Runoff minimization | Volume reduction | ||
Capture and re-use | |||
Temporary construction sediment control | Slope | ||
Drainageway | |||
Inspect & maintain | |||
Bioretention | Infiltration filtration recharge | ||
Filtration | |||
Infiltration | Infiltration trench | ||
Dry well | |||
Underground system | |||
Stormwater ponds | Stormwater ponds | ||
Without extended detention | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Pond wetland system | |||
Supplemental treatment | Filtration devices | ||
Hydrodynamic devices | |||
Low rainfall | Bioretention | Filtration | |
Filtration | Media (sand) | ||
Vegetative | |||
Stormwater ponds | Without extended detention | ||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Stormwater treatment suitability | Recharge | Better Site Design | |
Runoff minimization | Volume reduction | ||
Capture and re-use | |||
Bioretention | Infiltration recharge | ||
Filtration partial recharge | |||
Infiltration filtration recharge | |||
Infiltration | Infiltration basin | ||
Infiltration trench | |||
Dry well | |||
Underground system | |||
Water quality | Better Site Design | ||
Pollution prevention | Residential | ||
Municipal | |||
I/Ca | |||
Temporary construction sediment control | Perimeter | ||
Slope | |||
Drainageway | |||
Otherb | |||
Inspect & maintain | |||
Filtration | Media (sand) | ||
Vegetative | |||
Stormwater ponds | Stormwater ponds | ||
Without extended detention | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Pond wetland system | |||
Stormwater treatment suitability | Channel protection | Better Site Design | |
Pollution prevention | Municipal | ||
Runoff minimization | Volume reduction | ||
Temporary construction sediment control | Perimeter | ||
Slope | |||
Drainageway | |||
Stormwater ponds | Stormwater ponds | ||
Without extended detention | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Pond wetland system | |||
Stormwater treatment suitability | Peak discharge | Pollution prevention | Municipal |
Runoff minimization | Volume reduction | ||
Temporary construction sediment control | Slope | ||
Bioretention | Infiltration recharge | ||
Filtration partial recharge | |||
Filtration | |||
Filtration | Media (sand) | ||
Vegetative | |||
Infiltration | Infiltration basin | ||
Infiltration trench | |||
Dry well | |||
Underground system | |||
Stormwater ponds | Stormwater ponds | ||
Without extended detention | |||
Shallow wetland | |||
ED shallow wetland | |||
Pond wetland system | |||
PSHc | Better Site Design | ||
Pollution prevention | Residential | ||
Municipal | |||
I/Ca | |||
Filtration | Media (sand) | ||
Vegetative | |||
Infiltration | Infiltration basin | ||
Physical feasibility | Soils | Temporary construction sediment control | Perimeter |
Slope | |||
Drainageway | |||
Bioretention | Filtration | ||
Filtration | Media (sand) | ||
Vegetative | |||
Elevation difference | Bioretention | Filtration | |
Depth to rock | Better Site Design | ||
Bioretention | Filtration | ||
Filtration | Media (sand) | ||
Vegetative | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Supplemental treatment | Hydrodynamic devices | ||
Physical feasibility | Depth to water table | Better Site Design | |
Runoff minimization | Capture and re-use | ||
Bioretention | Filtration | ||
Filtration | Media (sand) | ||
Vegetative | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Supplemental treatment | Hydrodynamic devices | ||
Site slope | Better Site Design | ||
Temporary construction sediment control | Perimeter | ||
Slope | |||
Drainageway | |||
Physical feasibility | Ultra-urban | Better Site Design | |
Pollution prevention | Residential | ||
Municipal | |||
Runoff minimization | Capture and re-use | ||
Temporary construction sediment control | Perimeter | ||
Slope | |||
Bioretention | Infiltration recharge | ||
Filtration partial recharge | |||
Infiltration filtration rechargee | |||
Filtration | |||
Filtration | Media (sand) | ||
Vegetative | |||
Infiltration | Underground system | ||
Supplemental treatment | Filtration devices | ||
Hydrodynamic devicess | |||
Community and environment | Ease of maintenance | Better Site Design | |
Pollution prevention | Residential | ||
Municipal | |||
Temporary construction sediment control | Perimeter | ||
Slope | |||
Filtration | Vegetative | ||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Supplemental treatment | Filtration devices | ||
Community acceptance | Better Site Design | ||
Pollution prevention | Residential | ||
Municipal | |||
Temporary construction sediment control | Perimeter | ||
Perimeter | |||
Slope | |||
Bioretention | Filtration | ||
Filtration | Vegetative | ||
Stormwater ponds | Stormwater ponds | ||
Without extended detention | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Pond wetland system | |||
Supplemental treatment | Filtration devices | ||
Community and environment | Construction cost | Better Site Design | |
Temporary construction sediment control | Pre-construction | ||
Perimeter | |||
Filtration | Vegetative | ||
Habitat quality | Better Site Design | ||
Bioretention | Infiltration recharge | ||
Filtration partial recharge | |||
Infiltration filtration recharge | |||
Filtration | |||
Filtration | Media (sand) | ||
Vegetative | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Pond wetland system | |||
Nuisance | Infiltration | Infiltration basin | |
Infiltration trench | |||
Dry well | |||
Underground system | |||
Location-specific restrictions and setbacks | Pollution prevention | Municipal | |
Temporary construction sediment control | Drainageway | ||
Knowledge of performance and reliability | Better Site Design | ||
Pollution prevention | Municipal | ||
I/Ca | |||
Runoff minimization | Volume reduction | ||
Temporary construction sediment control | Perimeter | ||
Slope | |||
Drainageway | |||
Inspect & maintain | |||
Bioretention | Filtration | ||
Filtration | Media (sand) | ||
Vegetative | |||
Stormwater ponds | Stormwater ponds | ||
Without extended detention | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Pond wetland system | |||
Pollution prevention | Bioretention | Filtration | |
Filtration | Vegetative | ||
Minimize runoff | Reduce volume | Bioretention | Filtration |
Bioretention | Filtration | ||
Filtration | Media (sand) | ||
Filtration | Vegetative | ||
Constructed wetlands | Shallow wetland | ||
Constructed wetlands | ED shallow wetland | ||
Constructed wetlands | Pond wetland system | ||
Minimize runoff | Increase recharge | Bioretention | Filtration |
Filtration | Vegetative | ||
Stormwater ponds | With extended detention | ||
Stormwater ponds | Without extended detention | ||
Constructed wetlands | Shallow wetland | ||
Constructed wetlands | ED shallow wetland | ||
Constructed wetlands | Pond wetland system | ||
Minimize runoff | Improve water quality | X | X |
Runoff minimization | Volume reduction | ||
Runoff minimization | Capture and re-use | ||
Bioretention | Infiltration recharge | ||
Bioretention | Filtration partial recharge | ||
Bioretention | Infiltration filtration recharge | ||
Bioretention | Filtration | ||
Filtration | Media (sand) | ||
Infiltration | Infiltration basin | ||
Infiltration | Infiltration trench | ||
Infiltration | Dry well | ||
Infiltration | Underground system | ||
Supplemental treatment | Chemical biological treatment | ||
Supplemental treatment | Filtration devices | ||
Supplemental treatment | Hydrodynamic devices | ||
Minimize runoff | Reduce costs | Pollution prevention | Residential |
Pollution prevention | Municipal | ||
Pollution prevention | I/Ca | ||
Runoff minimization | Volume reduction | ||
Runoff minimization | Capture and re-use | ||
Temporary construction sediment control | Inspect & maintain | ||
Bioretention | Infiltration recharge | ||
Bioretention | Filtration partial recharge | ||
Bioretention | Infiltration filtration recharge | ||
Bioretention | Filtration | ||
Filtration | Vegetative | ||
Minimize runoff | Local feasibility | Pollution prevention | I/Ca |
Minimize runoff | Cold climate | Pollution prevention | Residential |
Runoff minimization | Volume reduction | ||
Temporary construction sediment control | Perimeter | ||
Temporary construction sediment control | Slope | ||
Temporary construction sediment control | Drainageway | ||
Bioretention | Infiltration recharge | ||
Bioretention | Filtration partial recharge | ||
Bioretention | Infiltration filtration recharge | ||
Bioretention | Filtration | ||
Infiltration | Infiltration basin | ||
Infiltration | Infiltration trench | ||
Infiltration | Dry well | ||
Infiltration | Underground system | ||
Minimize runoff | Land use | Bioretention | Infiltration recharge |
Bioretention | Filtration partial recharge | ||
Bioretention | Infiltration filtration recharge | ||
Bioretention | Filtration | ||
Filtration | Vegetative | ||
Supplemental treatment | Filtration devices | ||
Supplemental treatment | Hydrodynamic devices | ||
Temporary construction sediment control | Runoff minimization | Volume reduction | |
Capture and re-use | |||
Bioretention | Infiltration recharge | ||
Filtration partial recharge | |||
Infiltration filtration recharge | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Supplemental treatment | Chemical biological treatment | ||
Watershed factors | Lakes | Constructed wetlands | Shallow wetland |
ED shallow wetland | |||
Trout resources | Runoff minimization | Capture and re-use | |
Temporary construction sediment control | Otherb | ||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Drinking water | Pollution preventions | I/Ca | |
Runoff minimization | Capture and re-use | ||
Filtration | Vegetative | ||
Wetlands (calcareous fens) | Runoff minimization | Infiltration recharge | |
Bioretention | Volume reduction | ||
Impaired waters | Pollution prevention | I/Ca | |
Runoff minimization | Capture and re-use | ||
Temporary construction sediment control | Otherb | ||
Bioretention | Infiltration recharge | ||
Filtration partial recharge | |||
Infiltration | Infiltration basin | ||
Infiltration trench | |||
Dry well | |||
Underground system | |||
Climate and terrain | Active karst | Better Site Design | |
Temporary construction sediment control | Drainageway | ||
Otherb | |||
Bioretention | Filtration partial recharge | ||
Stormwater ponds | Without extended detention | ||
Constructed wetlands | Pond wetland system | ||
Fractured bedrock/shallow soil | Better Site Design | ||
Low infiltration soil | Bioretention | Filtration | |
Filtration | Media (sand) | ||
Vegetative | |||
High snowfallt | Better Site Design | ||
Pollution prevention | I/Ca | ||
Bioretention | Infiltration recharge | ||
Filtration | Media (sand) | ||
Vegetative | |||
Infiltration | Infiltration basin | ||
Low rainfall | Stormwater ponds | With extended detention | |
Stormwater treatment suitability | Recharge | Temporary construction sediment control | Slope |
Drainageway | |||
Otherb | |||
Filtration | Vegetative | ||
Water quality | Runoff minimization | Volume reduction | |
Capture and re-use | |||
Bioretention | Infiltration recharge | ||
Filtration partial recharge | |||
Infiltration filtration recharge | |||
Filtration | |||
Infiltration | Infiltration basin | ||
Dry well | |||
Underground system | |||
Supplemental treatment | Chemical biological treatment | ||
Filtration devices | |||
Hydrodynamic devices | |||
Stormwater treatment suitability | Channel protection | Temporary construction sediment control | Otherb |
Bioretention | Infiltration recharge | ||
Filtration partial recharge | |||
Infiltration filtration recharge | |||
Filtration | |||
Filtration | Vegetative | ||
Infiltration | Infiltration basin | ||
Infiltration trench | |||
Infiltration trench | |||
Dry wellh | |||
Underground system | |||
Peak discharge | Temporary construction sediment control | Otherb | |
PSHc | Better Site Design | ||
Bioretention | Filtration | ||
Stormwater ponds | With extended detention | ||
Without extended detention | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Pond wetland system | |||
Physical feasibility | Surface area | Supplemental treatment | Filtration devices |
Hydrodynamic devices | |||
Soils | Constructed wetlands | Shallow wetland | |
ED shallow wetland | |||
Temporary construction sediment control | Slope | ||
Depth to water table | Bioretention | Infiltration recharge | |
Filtration partial recharge | |||
Infiltration filtration recharge | |||
Site slope | Bioretention | Infiltration recharge | |
Filtration partial recharge | |||
Infiltration filtration recharge | |||
Filtratione | |||
Community and environment | Ease of maintenance | Pollution prevention | I/Ca |
Temporary construction sediment control | Otherb | ||
Bioretention | Filtration | ||
Filtration | |||
Without extended detention | |||
Constructed wetlands | Pond wetland system | ||
Supplemental treatment | Hydrodynamic devices | ||
Pollution prevention | I/Ca | ||
I/Ca | |||
Habitat quality | Stormwater ponds | With extended detention | |
Without extended detention | |||
Nuisance | Stormwater ponds | With extended detention | |
Without extended detention | |||
Constructed wetlands | Shallow wetland | ||
ED shallow wetland | |||
Pond wetland system | |||
Ease of maintenance | Stormwater ponds | With extended detention | |
With extended detention | |||
Location-specific restrictions and setbacks | Better Site Design | ||
Runoff minimization | Capture and re-use | ||
Knowledge of performance and reliability | Runoff minimization | Capture and re-use | |
Temporary construction sediment control | Otherb | ||
Bioretention | Infiltration recharge | ||
Filtration partial recharge | |||
Infiltration filtration recharge | |||
Infiltration | Infiltration basin | ||
Infiltration trench | |||
Dry well | |||
Underground system | |||
Supplemental treatment | Chemical biological treatment | ||
Filtration devices | |||
Hydrodynamic devices | |||
Sensitivity to improper construction and poor maintenances | Better Site Design | ||
Runoff minimization | Capture and re-use | ||
Bioretention | Filtration | ||
Filtration | Vegetative | ||
Stormwater ponds | With extended detention | ||
Without extended detention | |||
Not recommended best management practices | |||
Temporary construction sediment control | Infiltration | Infiltration basin | |
Infiltration trench | |||
Dry well | |||
Underground system | |||
Watershed factors | Trout resources | Stormwater ponds | With extended detention |
Without extended detention | |||
Climate and terrain | Active karst | Bioretention | Infiltration recharge |
Infiltration filtration recharge | |||
Infiltration | Infiltration basin | ||
Infiltration trench | |||
Dry well | |||
Underground system | |||
Fractured bedrock/shallow soil | Bioretention | Infiltration recharge | |
Low infiltration soil | Bioretention | Infiltration recharge | |
Filtration partial recharge | |||
Infiltration filtration recharge | |||
Infiltration | Infiltration basin | ||
Infiltration trench | |||
Underground system | |||
Stormwater treatment suitability | PSHc | Infiltration | Bioretention |
Bioretention | Infiltration recharge | ||
Filtration partial recharge | |||
Infiltration filtration recharge | |||
Infiltration | Infiltration basin | ||
Infiltration trench | |||
Dry well | |||
Dry well | |||
Underground system | |||
Physical feasibility | Surface area | Stormwater ponds | With extended detention |
Surface area | Stormwater ponds | Without extended detention | |
Drainage area | Constructed wetlands | Shallow wetland | |
Drainage area | Constructed wetlands | ED shallow wetland | |
Drainage area | Constructed wetlands | Pond wetland system | |
Soils | Infiltration | Infiltration basin | |
Soils | Infiltration | Infiltration trench | |
Soils | Infiltration | Dry well | |
Soils | Infiltration | Underground system | |
Depth to rock | Bioretention | Infiltration recharge | |
Depth to rock | Bioretention | Filtration partial recharge | |
Depth to rock | Bioretention | Infiltration filtration recharge | |
Depth to rock | Infiltration | Infiltration basin | |
Depth to rock | Infiltration | Infiltration trench | |
Depth to rock | Infiltration | Dry well | |
Depth to rock | Infiltration | Underground system | |
Depth to rock | Stormwater ponds | With extended detention | |
Depth to water table | Infiltration | Infiltration basin | |
Depth to water table | Infiltration | Infiltration trench | |
Depth to water table | Infiltration | Dry well | |
Depth to water table | Infiltration | Underground system | |
Ultra-urban | Stormwater ponds | With extended detention | |
Ultra-urban | Stormwater ponds | Without extended detention | |
Ultra-urban | Stormwater ponds | Without extended detention | |
Ultra-urban | Constructed wetlands | Shallow wetland | |
Ultra-urban | Constructed wetlands | ED shallow wetland | |
Ultra-urban | Constructed wetlands | Pond wetland system | |
Community and environment | Ease of maintenance | Filtration | Media (sand) |
Community and environment | Ease of maintenance | Infiltration | Infiltration basin |
Community and environment | Ease of maintenance | Infiltration | Infiltration trench |
Community and environment | Ease of maintenance | Infiltration | Dry well |
Community and environment | Ease of maintenance | Infiltration | Underground system |
Community and environment | Community acceptance | Bioretention | Infiltration recharge |
Community and environment | Community acceptance | Bioretention | Infiltration filtration recharge |
Community and environment | Construction cost | Filtration | Media (sand) |
Community and environment | Construction cost | Filtration | Vegetative |
Community and environment | Construction cost | Infiltration | Infiltration trench |
Community and environment | Construction cost | Infiltration | Underground system |
Community and environment | Construction cost | Supplemental treatment | Chemical biological treatment |
Community and environment | Construction cost | Supplemental treatment | Chemical biological treatment |
Community and environment | Habitat quality | Filtration | Media (sand) |
Community and environment | Habitat quality | Infiltration | Infiltration trench |
Community and environment | Habitat quality | Infiltration | Dry well |
Community and environment | Habitat quality | Infiltration | Underground system |
Community and environment | Habitat quality | Supplemental treatment | Filtration devices |
Community and environment | Habitat quality | Supplemental treatment | Hydrodynamic devices |
Sensitivity to improper construction and poor maintenance | Runoff minimization | Volume reduction | |
Sensitivity to improper construction and poor maintenance | Temporary construction sediment control | Perimeter | |
Sensitivity to improper construction and poor maintenance | Temporary construction sediment control | Slope | |
Sensitivity to improper construction and poor maintenance | Temporary construction sediment control | Drainageway | |
Sensitivity to improper construction and poor maintenance | Bioretention | Infiltration recharge | |
Sensitivity to improper construction and poor maintenance | Bioretention | Filtration partial recharge | |
Sensitivity to improper construction and poor maintenance | Bioretention | Infiltration filtration recharge | |
Sensitivity to improper construction and poor maintenance | Infiltration | Infiltration basin | |
Sensitivity to improper construction and poor maintenance | Infiltration | Infiltration trench | |
Sensitivity to improper construction and poor maintenance | Infiltration | Dry well | |
Sensitivity to improper construction and poor maintenance | Infiltration | Underground system | |
Sensitivity to improper construction and poor maintenance | Supplemental treatmentn | Hydrodynamic devices |