m |
m |
||
Line 7: | Line 7: | ||
*Inspect the structural integrity of the pavement surface, looking for signs of surface deterioration, such as slumping, cracking, spalling, or broken pavers. Replacement to rectify a damaged surface or one removed for access to utility repairs should be done per industry recommendations. After base compaction, small areas of pervious concrete and porous asphalt can be replaced with conventional (impervious) asphalt or concrete up to 10 percent of the total permeable pavement area. For PICP, paving units are removed for reinstatement later. The remaining undisturbed pavers at the perimeter of the opening are typically held in place with temporary wood or metal braces. Once the base is replaced and compacted, new bedding material and pavers are reinstated and compacted over the base. | *Inspect the structural integrity of the pavement surface, looking for signs of surface deterioration, such as slumping, cracking, spalling, or broken pavers. Replacement to rectify a damaged surface or one removed for access to utility repairs should be done per industry recommendations. After base compaction, small areas of pervious concrete and porous asphalt can be replaced with conventional (impervious) asphalt or concrete up to 10 percent of the total permeable pavement area. For PICP, paving units are removed for reinstatement later. The remaining undisturbed pavers at the perimeter of the opening are typically held in place with temporary wood or metal braces. Once the base is replaced and compacted, new bedding material and pavers are reinstated and compacted over the base. | ||
+ | ==Related articles== | ||
+ | *[[Overview for permeable pavement]] | ||
+ | *[[Types of permeable pavement]] | ||
+ | *[[Design criteria for permeable pavement]] | ||
+ | *[[Construction specifications for permeable pavement]] | ||
+ | <!--[[Construction observations for permeable pavement]]--> | ||
+ | *[[Assessing the performance of permeable pavement]] | ||
+ | *[[Operation and maintenance of permeable pavement]] | ||
+ | *[[Calculating credits for permeable pavement]] | ||
+ | <!--[[Cost-benefit considerations for permeable pavement]]--> | ||
+ | *[[Additional considerations for permeable pavement]] | ||
+ | <!--*[[Links for permeable pavement]] | ||
+ | *[[External resources for permeable pavement]]--> | ||
+ | *[[References for permeable pavement]] | ||
+ | <!--*[[Supporting material for permeable pavement]]--> | ||
+ | <!--*[[Permeable pavement credits]]--> | ||
+ | *[[Fact sheets for permeable pavement]]</noinclude> | ||
<noinclude>[[category:Assessing performance]]</noinclude> | <noinclude>[[category:Assessing performance]]</noinclude> |
Maintenance of permeable pavement includes a review of its condition and performance. A spring maintenance inspection is recommended and cleanup conducted as needed. The following are recommended annual maintenance inspection points for permeable pavements: