m |
m |
||
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | <font size=3>''' | + | <font size=3>'''Recommended minimum setback requirements. This represents the minimum distance from the infiltration practice to the structure of concern. If the structure is aboveground, the distance is measured from the edge of the permeable pavement to the structure. If the structure is underground, the setback distance represents the distance from the point of infiltration through the bottom of the permeable pavement system to the structure.'''</font size><br> |
Link to this [[Minimum setback requirements|table]] | Link to this [[Minimum setback requirements|table]] | ||
<table class="sortable"><tr> | <table class="sortable"><tr> | ||
Line 17: | Line 17: | ||
<tr> | <tr> | ||
<td>Private Well</td> | <td>Private Well</td> | ||
− | |||
− | |||
− | |||
− | |||
<td>50</td> | <td>50</td> | ||
</tr> | </tr> | ||
Line 32: | Line 28: | ||
</table> | </table> | ||
− | <noinclude>[[ | + | <noinclude>[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Infiltration basin, trench, underground infiltration]]</noinclude> |
Recommended minimum setback requirements. This represents the minimum distance from the infiltration practice to the structure of concern. If the structure is aboveground, the distance is measured from the edge of the permeable pavement to the structure. If the structure is underground, the setback distance represents the distance from the point of infiltration through the bottom of the permeable pavement system to the structure.
Link to this table
Setback from | Minimum Distance [feet] |
---|---|
Property Line | 10 |
Building Foundation* | 10 |
Private Well | 50 |
Septic System Tank/Leach Field | 35 |
* Minimum with slopes directed away from the building. |
This page was last edited on 4 August 2022, at 17:48.