Dfairbairn (talk | contribs) |
m (→Information) |
||
(19 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | |||
− | |||
[[File:Symbol for swale with no underdrain.png|300px|thumb|alt=symbol for swale with no underdrain|<font size=3>Symbol for Swale main channel (without an underdrain) used in the MIDS calculator.</font size>]] | [[File:Symbol for swale with no underdrain.png|300px|thumb|alt=symbol for swale with no underdrain|<font size=3>Symbol for Swale main channel (without an underdrain) used in the MIDS calculator.</font size>]] | ||
For a swale main channel BMP (no underdrain), stormwater can be retained through three separate methods. Stormwater can [[Glossary#I|infiltrate]] into the soils as it travels through the main channel to the outflow, stormwater can pond behind a check dam and infiltrate into the underlying soils, or stormwater can be stored in the pore spaces of an engineered bioretention base and infiltrate into the underlying soils. If stormwater runoff to the main channel flows over a side slope through sheet flow, then a swale side slope BMP should be used in combination with the swale main channel BMP in the MIDS calculator. All pollutants in the infiltrated water are credited as being reduced. A portion of pollutants in the stormwater that flows through the channel outflow is removed through [[Glossary#F|filtration]] and [[Glossary#S|sediment removal]]. | For a swale main channel BMP (no underdrain), stormwater can be retained through three separate methods. Stormwater can [[Glossary#I|infiltrate]] into the soils as it travels through the main channel to the outflow, stormwater can pond behind a check dam and infiltrate into the underlying soils, or stormwater can be stored in the pore spaces of an engineered bioretention base and infiltrate into the underlying soils. If stormwater runoff to the main channel flows over a side slope through sheet flow, then a swale side slope BMP should be used in combination with the swale main channel BMP in the MIDS calculator. All pollutants in the infiltrated water are credited as being reduced. A portion of pollutants in the stormwater that flows through the channel outflow is removed through [[Glossary#F|filtration]] and [[Glossary#S|sediment removal]]. | ||
+ | |||
+ | ==Changes to Version 4 of the MIDS Calculator== | ||
+ | {{alert|Changes have been made to Version 4 of the MIDS Calculator|alert-info}} | ||
+ | The particulate phosphorus credit has been reduced from 73 to 68 percent to match the TSS reduction. Particulate pollutant removal cannot exceed sediment removal. | ||
==MIDS calculator user inputs for swale main channel== | ==MIDS calculator user inputs for swale main channel== | ||
− | [[File:Watershed tab swale with no underdrain.png|300px|thumb|alt= | + | [[File:Watershed tab swale with no underdrain.png|300px|thumb|alt=Screen shot of Watershed tab for Swale main channel|<font size=3>Screen shot of Watershed tab for Swale main channel. The user must input a value for impervious area or the BMP will not provide volume and pollutant reduction. Other fields are optional.</font size>]] |
− | [[File:Swale main channel BMP parameters tab.png|300px|thumb|alt= | + | [[File:Swale main channel BMP parameters tab.png|300px|thumb|alt=Screen shot of BMP parameters tab for Swale main channel. The user must enter values for all blank cells.BMP|<font size=3>Screen shot of BMP parameters tab for Swale main channel. The user must enter values for all blank cells.</font size>]] |
− | [[File:Swale main channel watershed tab 2.png|300px|thumb|alt= | + | [[File:Swale main channel watershed tab 2.png|300px|thumb|alt=Screen shot of BMP parameters tab for Swale main channel. The user must enter values for all blank cells.|<font size=3>Screen shot of BMP parameters tab for Swale main channel. The user must enter values for all blank cells.</font size>]] |
For swale main channel systems, the user must input the following parameters to calculate the volume and pollutant load reductions associated with the BMP. | For swale main channel systems, the user must input the following parameters to calculate the volume and pollutant load reductions associated with the BMP. | ||
Line 20: | Line 22: | ||
**'''Swale bottom width (W<sub>B</sub>)''': This is the average bottom width of the swale main channel. Units are in feet. Based on design restrictions, the bottom width cannot be less than 2 feet. | **'''Swale bottom width (W<sub>B</sub>)''': This is the average bottom width of the swale main channel. Units are in feet. Based on design restrictions, the bottom width cannot be less than 2 feet. | ||
**'''Channel slope (S):''' This is the slope of the channel. Units are in percent. The slope is calculated by taking the difference between vertical elevations at the upstream and downstream points of the swale and dividing by the horizontal distance between the two locations. The slope therefore represents an average slope over the length of the swale. If the slope varies over the length of a swale, the user should enter the average slope over the entire length rather than break the swale into separate smaller lengths. Based on design restrictions, the channel slope cannot be less than 0.5 percent or greater than 4 percent. | **'''Channel slope (S):''' This is the slope of the channel. Units are in percent. The slope is calculated by taking the difference between vertical elevations at the upstream and downstream points of the swale and dividing by the horizontal distance between the two locations. The slope therefore represents an average slope over the length of the swale. If the slope varies over the length of a swale, the user should enter the average slope over the entire length rather than break the swale into separate smaller lengths. Based on design restrictions, the channel slope cannot be less than 0.5 percent or greater than 4 percent. | ||
− | **'''Underlying soil - Hydrologic Soil Group''': The user selects the most restrictive soil (lowest hydraulic conductivity) within | + | **'''Underlying soil - Hydrologic Soil Group''': The user selects the most restrictive soil (lowest hydraulic conductivity) within 5 feet of the soil surface or the soil/media interface (if a bioretention base is utilized) of the swale main channel. There are 14 soil options that fall into 4 different Hydrologic Soil Groups (Hydrologic Soil Group (HSG) A, B, C, or D) for the user. Once a soil type is selected, the corresponding [[Design infiltration rates|infiltration rate]] will populate the “Infiltration rate of underlying soils” field. The user may also select “User Defined.” This selection will activate the “User Defined Infiltration Rate” cell, allowing the user to enter a different value from the value in the predefined selection list. The maximum allowable infiltration rate is 1.63 inches per hour. |
** '''Manning’s n (Vegetation):''' The user selects a type of vegetation cover on the swale main channel, which populates a corresponding Manning’s n. The vegetation types are mowed turf or native grasses. Mowed turf would be selected if the main channel is mowed on a consistent basis. Native grasses would be selected if the main channel is left to grow or is mowed infrequently. Once a vegetation cover is selected, the corresponding Manning’s n will populate in the “Manning’s n” field. The user may also select “User Defined.” This selection will activate the “User Defined Manning’s n” cell, allowing the user to enter a value different from the values in the predefined selection list. | ** '''Manning’s n (Vegetation):''' The user selects a type of vegetation cover on the swale main channel, which populates a corresponding Manning’s n. The vegetation types are mowed turf or native grasses. Mowed turf would be selected if the main channel is mowed on a consistent basis. Native grasses would be selected if the main channel is left to grow or is mowed infrequently. Once a vegetation cover is selected, the corresponding Manning’s n will populate in the “Manning’s n” field. The user may also select “User Defined.” This selection will activate the “User Defined Manning’s n” cell, allowing the user to enter a value different from the values in the predefined selection list. | ||
**'''Does the swale have a check dam?:''' This is a YES/NO question. The user selects YES if one or more check dams have been installed in the swale main channel. By selecting YES, the “Is check dam permeable?” input box will become active. | **'''Does the swale have a check dam?:''' This is a YES/NO question. The user selects YES if one or more check dams have been installed in the swale main channel. By selecting YES, the “Is check dam permeable?” input box will become active. | ||
Line 32: | Line 34: | ||
**'''Media porosity minus field capacity (n - FC)''': This is the ratio of media pore space to the total media volume in the bioretention base media installed from the surface of the swale main channel down to the native soils. If multiple types of media are used in the BMP, this value should be a weighted average of [[Soil water storage properties|the soil water storage values of the media ]] installed from the surface of the swale main channel down to the native soils. Values for porosity and field capacity based on soil type can be found here. The user inputs this value in cubic feet of pore space per cubic feet of media. The recommended range for this value is 0.15 to 0.35. | **'''Media porosity minus field capacity (n - FC)''': This is the ratio of media pore space to the total media volume in the bioretention base media installed from the surface of the swale main channel down to the native soils. If multiple types of media are used in the BMP, this value should be a weighted average of [[Soil water storage properties|the soil water storage values of the media ]] installed from the surface of the swale main channel down to the native soils. Values for porosity and field capacity based on soil type can be found here. The user inputs this value in cubic feet of pore space per cubic feet of media. The recommended range for this value is 0.15 to 0.35. | ||
*'''BMP Summary Tab''': The BMP Summary tab summarizes the volume and pollutant reductions provided by the specific BMP. It details the performance goal volume reductions and annual average volume, dissolved P, particulate P, and TSS load reductions. Included in the summary are the total volume and pollutant loads received by the BMP from its direct watershed, from upstream BMPs, and a combined value of the two. Also included in the summary are the volume and pollutant load reductions provided by the BMP, along with the volume and pollutant loads that exit the BMP through the outflow. This outflow load and volume is what is routed to the downstream BMP, if one is defined in the Watershed tab. Finally, percent reductions are provided for the percent of the performance goal achieved, percent annual runoff volume retained, total percent annual particulate phosphorus reduction, total percent annual dissolved phosphorus reduction, total percent annual TP reduction, and total percent annual TSS reduction. | *'''BMP Summary Tab''': The BMP Summary tab summarizes the volume and pollutant reductions provided by the specific BMP. It details the performance goal volume reductions and annual average volume, dissolved P, particulate P, and TSS load reductions. Included in the summary are the total volume and pollutant loads received by the BMP from its direct watershed, from upstream BMPs, and a combined value of the two. Also included in the summary are the volume and pollutant load reductions provided by the BMP, along with the volume and pollutant loads that exit the BMP through the outflow. This outflow load and volume is what is routed to the downstream BMP, if one is defined in the Watershed tab. Finally, percent reductions are provided for the percent of the performance goal achieved, percent annual runoff volume retained, total percent annual particulate phosphorus reduction, total percent annual dissolved phosphorus reduction, total percent annual TP reduction, and total percent annual TSS reduction. | ||
+ | |||
+ | ==Routing stormwater runoff to swales and swale side slopes in the MIDS Calculator== | ||
+ | {{:Routing stormwater runoff to swales and swale side slopes in the MIDS Calculator}} | ||
==Model input requirements and recommendations== | ==Model input requirements and recommendations== | ||
Line 46: | Line 51: | ||
:I<sub>R</sub> is the infiltration rate of the native soils (inches/hr). | :I<sub>R</sub> is the infiltration rate of the native soils (inches/hr). | ||
− | If the DDT<sub>calc</sub> is greater than the user-specified required drawdown time then the user will be prompted to enter a new check dam depth or infiltration rate of the native soils. | + | If the DDT<sub>calc</sub> is greater than the user-specified required drawdown time then the user will be prompted to enter a new check dam depth or infiltration rate of the native soils. |
==Methodology== | ==Methodology== | ||
Line 52: | Line 57: | ||
===Required treatment volume=== | ===Required treatment volume=== | ||
− | ''Required treatment volume'', or the volume of stormwater runoff delivered to the BMP, equals the performance goal (1.1 inches or user-specified performance goal) times the impervious area draining to the BMP plus any water routed to the BMP from an upstream BMP. This stormwater is delivered to the BMP instantaneously | + | ''Required treatment volume'', or the volume of stormwater runoff delivered to the BMP, equals the performance goal (1.1 inches or user-specified performance goal) times the impervious area draining to the BMP plus any water routed to the BMP from an upstream BMP. This stormwater is delivered to the BMP instantaneously. |
===Volume reduction=== | ===Volume reduction=== | ||
Line 61: | Line 66: | ||
====Volume reduction capacity due to infiltration along the swale main channel (V<sub>MC</sub>)==== | ====Volume reduction capacity due to infiltration along the swale main channel (V<sub>MC</sub>)==== | ||
− | With no real storage capacity unless impermeable check dams are present, the main method of stormwater volume reduction in a swale with no underdrain is via infiltration as the stormwater travels through the main channel. The | + | With no real storage capacity unless impermeable check dams are present, the main method of stormwater volume reduction in a swale with no underdrain is via infiltration as the stormwater travels through the main channel. The infiltration capacity of the swale main channel bottom (V<sub>MC</sub>) is estimated based on analysis of long-term modeling results as described in the following paragraphs. |
To determine the average annual volume reduction credit given for a swale main channel, the [http://wwwalker.net/p8/ P8 water quality model] was used. Fifty-five (55) years of hourly rainfall data were modeled for swale main channels with various configurations of channel length, swale bottom width, channel slope, soil infiltration rate, and Manning’s n parameters. The model results provided annual average volume reduction rates. Multivariate regression was used to assess model results to determine the relationships between swale modeling parameters and annual volume reductions. The observed relationships are paired with the user-provided inputs to calculate an annual percent stormwater volume reduction for the swale main channel in the calculator. | To determine the average annual volume reduction credit given for a swale main channel, the [http://wwwalker.net/p8/ P8 water quality model] was used. Fifty-five (55) years of hourly rainfall data were modeled for swale main channels with various configurations of channel length, swale bottom width, channel slope, soil infiltration rate, and Manning’s n parameters. The model results provided annual average volume reduction rates. Multivariate regression was used to assess model results to determine the relationships between swale modeling parameters and annual volume reductions. The observed relationships are paired with the user-provided inputs to calculate an annual percent stormwater volume reduction for the swale main channel in the calculator. | ||
− | To obtain the | + | To obtain the volume reduction capacity of the channel bottom (V<sub>MC</sub>), the annual volume reductions are converted to a volume reduction capacity. This is accomplished through the use of [[Performance curves for MIDS calculator|performance curves]] developed from a range of modeling scenarios. The performance curves use the annual volume reduction percentage, the infiltration rate of the underlying soils, the contributing watershed percent impervious area, and the size of the contributing watershed to calculate the volume reduction capacity achieved through infiltration along the swale main channel (V<sub>MC</sub>). |
====Volume reduction capacity of check dams (V<sub>CD</sub>)==== | ====Volume reduction capacity of check dams (V<sub>CD</sub>)==== | ||
Line 92: | Line 97: | ||
If a bioretention base is selected, then the credit given for the infiltration into the soils of the main channel (V<sub>MC</sub>) is removed since all stormwater that would have infiltrated into the soils as it travels through the main channel is now instead collected in the pore space of the media. If check dams are installed the total stormwater volume reduction capacity of the swale main channel would be equal to the volume reduction provided by the bioretention base (V<sub>BB</sub>) plus the storage capacity of the check dams (V<sub>CD</sub>). | If a bioretention base is selected, then the credit given for the infiltration into the soils of the main channel (V<sub>MC</sub>) is removed since all stormwater that would have infiltrated into the soils as it travels through the main channel is now instead collected in the pore space of the media. If check dams are installed the total stormwater volume reduction capacity of the swale main channel would be equal to the volume reduction provided by the bioretention base (V<sub>BB</sub>) plus the storage capacity of the check dams (V<sub>CD</sub>). | ||
+ | |||
+ | ====Comparison of volume reduction capacity with volume performance goal==== | ||
+ | |||
+ | The MIDS calculator compares the ''Volume reduction capacity of BMP [V]'' with the ''Required treatment volume'', and the lesser of the two values is used to populate the ''Volume of retention provided by BMP''. This comparison between potential and actual treatment volumes ensures that the BMP does not claim more credit than is due based on the actual amount of water routed to it. The ''Volume of retention provided by BMP'' is the actual volume credit the BMP receives toward the instantaneous performance goal. For example, if the BMP is oversized the user will only receive volume credit for the ''Required treatment volume'' routed to the BMP. | ||
+ | |||
+ | Annual volume retention is assessed by converting the instantaneous ''Volume reduction capacity of BMP [V]'' to an annual volume reduction percentage. This is accomplished through the use of [[Performance curves for MIDS calculator|performance curves]] developed from a range of modeling scenarios. These performance curves use the ''Volume reduction capacity of BMP [V]'', the [[Design infiltration rates|infiltration rate]] of the underlying soils, the percent imperviousness of the contributing watershed area, and the size of the contributing watershed to calculate the ''Percent annual runoff volume retained'' and annual ''Retention volume provided by BMP''. | ||
===Pollutant reduction=== | ===Pollutant reduction=== | ||
Line 102: | Line 113: | ||
====Pollutant reduction via non-volume reduction==== | ====Pollutant reduction via non-volume reduction==== | ||
− | For water routed to the main channel that does not infiltrate, pollutant removal occurs through [[Glossary#F|filtration]] and [[Glossary#S|sediment removal]]. Removal rates for this water are 68 percent for total suspended solids (TSS), | + | For water routed to the main channel that does not infiltrate, pollutant removal occurs through [[Glossary#F|filtration]] and [[Glossary#S|sediment removal]]. Removal rates for this water are 68 percent for total suspended solids (TSS), 68 percent for particulate phosphorus, and 0 percent for dissolved phosphorus. |
NOTE: The user can modify event mean concentrations (EMCs) on the '''Site Information''' tab in the calculator. Default concentrations are 54.5 milligrams per liter for total suspended solids (TSS) and 0.3 milligrams per liter for total phosphorus (particulate plus dissolved). The calculator will notify the user if the default is changed. Changing the default EMC will result in changes to the total pounds of pollutant reduced. | NOTE: The user can modify event mean concentrations (EMCs) on the '''Site Information''' tab in the calculator. Default concentrations are 54.5 milligrams per liter for total suspended solids (TSS) and 0.3 milligrams per liter for total phosphorus (particulate plus dissolved). The calculator will notify the user if the default is changed. Changing the default EMC will result in changes to the total pounds of pollutant reduced. | ||
Line 112: | Line 123: | ||
The following general assumption applies in calculating the credit for a swale main channel. If this assumption is not followed, the stormwater volume and pollutant reduction credits cannot be applied. | The following general assumption applies in calculating the credit for a swale main channel. If this assumption is not followed, the stormwater volume and pollutant reduction credits cannot be applied. | ||
− | *The swale main channel has been properly [http://stormwater.pca.state.mn.us/index.php/Design_criteria_for_filtration designed], [http://stormwater.pca.state.mn.us/index.php/Construction_specifications_for_filtration constructed] and will be properly [http://stormwater.pca.state.mn.us/index.php/Operation_and_maintenance_of_filtration maintained] according to specifications for filtration systems. | + | *The swale main channel has been properly [http://stormwater.pca.state.mn.us/index.php/Design_criteria_for_filtration designed], [http://stormwater.pca.state.mn.us/index.php/Construction_specifications_for_filtration constructed], and will be properly [http://stormwater.pca.state.mn.us/index.php/Operation_and_maintenance_of_filtration maintained] according to specifications for filtration systems. |
− | ==Swale Side Slope and Main Channel example | + | ==Swale Side Slope and Main Channel example== |
[[File:Swale no underdrain schematic for example.jpg|300px|thumb|left|alt=Schematic used to determine the watershed characteristics of your entire site|<font size=3>Schematic used to determine the watershed characteristics of your entire site. In this example, runoff from a 1.4 acre impervious lot enters a swale side slope and then the swale main channel. Pervious acres include the turf area and the swale (side slope and main channel). See Step 1.</font size>]] | [[File:Swale no underdrain schematic for example.jpg|300px|thumb|left|alt=Schematic used to determine the watershed characteristics of your entire site|<font size=3>Schematic used to determine the watershed characteristics of your entire site. In this example, runoff from a 1.4 acre impervious lot enters a swale side slope and then the swale main channel. Pervious acres include the turf area and the swale (side slope and main channel). See Step 1.</font size>]] | ||
− | [[File:Swale no underdrain site information tab.png|300px|thumb|alt= | + | [[File:Swale no underdrain site information tab.png|300px|thumb|alt=Screen shot of the Site Information tab of the MIDS calculator|<font size=3>Screen shot of the Site Information tab of the MIDS calculator. See Step 2.</font size>]] |
+ | |||
+ | [[File:Swale no underdrain schematic tab.png|300px|thumb|alt=Screen shot of Schematic tab for MIDS calculator. Drag and drop a Swale Side Slope and a Swale Main Channel icon into the Schematic Window|<font size=3>Screen shot of Schematic tab for MIDS calculator. Drag and drop a Swale Side Slope and a Swale Main Channel icon into the Schematic Window. See Step 3.</font size>]] | ||
− | + | This example was completed using Version 2 of the Calculator. | |
The runoff from a 1.4 acre parking lot surrounded by 0.359 acres of pervious turf area flows through sheet flow over one of the side slopes of a swale and into a swale main channel. The soils across the area have a unified soils classification [http://stormwater.pca.state.mn.us/index.php/Design_infiltration_rates classification of SW (HSG type A soil)]. A second side slope associated with the main channel does not receive runoff from impervious surfaces. Each of the swale side slopes are 800 feet long by 10 feet wide with a side slope of 5H:1V. The main channel of the swale is 800 feet long by 4 feet wide with a 2 percent slope. The swale main channel does not have an underdrain, bioretention base or check dams. The maintenance on the swale calls for mowing once a year. The following steps detail how this system would be set up in the MIDS calculator. | The runoff from a 1.4 acre parking lot surrounded by 0.359 acres of pervious turf area flows through sheet flow over one of the side slopes of a swale and into a swale main channel. The soils across the area have a unified soils classification [http://stormwater.pca.state.mn.us/index.php/Design_infiltration_rates classification of SW (HSG type A soil)]. A second side slope associated with the main channel does not receive runoff from impervious surfaces. Each of the swale side slopes are 800 feet long by 10 feet wide with a side slope of 5H:1V. The main channel of the swale is 800 feet long by 4 feet wide with a 2 percent slope. The swale main channel does not have an underdrain, bioretention base or check dams. The maintenance on the swale calls for mowing once a year. The following steps detail how this system would be set up in the MIDS calculator. | ||
− | '''Step 1''': Determine the watershed characteristics of your entire site. | + | '''Step 1''': Determine the watershed characteristics of your entire site. For this example we have a 2.2 acre site with 1.4 acres of impervious area (parking lot) and 0.8 acres of pervious area in type A soils. The pervious area includes the turf area and the area of the swale side slopes and main channel. |
− | '''Step 2''': Fill in the site specific information into the ''Site Information'' tab. | + | '''Step 2''': Fill in the site specific information into the ''Site Information'' tab. This includes entering a ZIP Code (55414 for this example) and the watershed information from Step 1. The Managed Turf area includes the turf area, the area of the side slopes and the area of the main channel. ZIP code and impervious area must be filled in or an error message will be generated. Other fields on this screen are optional. |
'''Step 3''': Go to the Schematic tab and drag and drop a ''Swale Side Slope'' and a ''Swale Main Channel'' icon into the ''Schematic Window''. | '''Step 3''': Go to the Schematic tab and drag and drop a ''Swale Side Slope'' and a ''Swale Main Channel'' icon into the ''Schematic Window''. | ||
− | '''Step 4''': Determine the watershed characteristics for each of the BMP components. | + | '''Step 4''': Determine the watershed characteristics for each of the BMP components. For this example the swale side slope watershed includes 1.4 acres of impervious area and 0.543 acre of pervious area (0.359 acre of turf area plus 0.184 acre of swale side slope). The watershed of the swale main channel includes the pervious area of the main channel (0.073 acre) and the pervious area of the other swale side slope (0.184 acre) for a total pervious area of 0.257 acre. Since no impervious area is being routed to the second swale side slope, the area can be included in the direct watershed area of the main channel. However, the second swale side slope could be placed in the calculator as an additional BMP. Including it as a separate BMP provides a slightly greater annual volume reduction and more closely represents the true system. |
− | '''Step 5''': Open the BMP properties for the swale side slope by right clicking on the ''Swale Side Slope'' icon and selecting ''Edit BMP | + | '''Step 5''': Open the BMP properties for the swale side slope by right clicking on the ''Swale Side Slope'' icon and selecting ''Edit BMP Properties'', or by double clicking on the ''Swale Side Slope'' icon. |
'''Step 6''': If help is needed, click on the ''Minnesota Stormwater Manual Wiki'' link or the ''Help'' button to review input parameter specifications and calculations specific to the ''Swale Side Slope'' BMP. | '''Step 6''': If help is needed, click on the ''Minnesota Stormwater Manual Wiki'' link or the ''Help'' button to review input parameter specifications and calculations specific to the ''Swale Side Slope'' BMP. | ||
− | '''Step 7''': Fill in the specific BMP watershed information (1.4 acres of impervious and 0.543 acre of Managed Turf on A Soils). | + | '''Step 7''': Fill in the specific BMP watershed information (1.4 acres of impervious and 0.543 acre of Managed Turf on A Soils). Route the side slope BMP to the main channel BMP. |
− | '''Step 8''': Enter in the BMP design parameters into the ''BMP parameters'' tab. Swale Side Slope | + | '''Step 8''': Enter in the BMP design parameters into the ''BMP parameters'' tab. This Swale Side Slope example would require the following entries: |
− | *Side slope [H:V] | + | *Side slope [H:V]: 5:1 |
− | *Flow path length | + | *Flow path length: 10 feet |
− | *Channel length | + | *Channel length: 800 feet |
− | *Underlying soil – Hydrologic Soil Group | + | *Underlying soil – Hydrologic Soil Group: 4 SW (HSG A, 1.63 in/hr) (selected in dropdown box) |
− | *Manning’s n (vegetation) | + | *Manning’s n (vegetation): Native grass (selected in dropdown box) |
<gallery caption="MIDS calculator screen shots for inputs for swale side slope and wet swale. Click on an image for enlarged view." widths="140px"> | <gallery caption="MIDS calculator screen shots for inputs for swale side slope and wet swale. Click on an image for enlarged view." widths="140px"> | ||
− | File:Swale side slope watershed tab.png|alt= | + | File:Swale side slope watershed tab.png|alt=Screen shot of Watershed tab for swale side slope|Screen shot of Watershed tab for swale side slope. See Step 4. |
− | File:Swale side slope BMP parameters tab.png|alt= | + | File:Swale side slope BMP parameters tab.png|alt=Screen shot of BMP Parameters tab for swale side slope|Screen shot of BMP Parameters tab for swale side slope. See Steps 5 through 8. |
− | File:Swale main channel watershed tab.png|alt= | + | File:Swale main channel watershed tab.png|alt=Screen shot of Watershed tab for swale main channel|Screen shot of Watershed tab for swale main channel. See Step 13. |
− | File:Swale main channel BMP parameters tab.png|alt= | + | File:Swale main channel BMP parameters tab.png|alt=Screen shot of BMP Parameters tab swale main channel|Screen shot of BMP Parameters tab for swale main channel. See Step 14. |
− | File:Swale main channel watershed tab 2.png|alt= | + | File:Swale main channel watershed tab 2.png|alt=Screen shot of BMP Parameters tab swale main channel|Screen shot of BMP Parameters tab for swale main channel. See Step 14. |
</gallery> | </gallery> | ||
<gallery caption="MIDS calculator screen shots of results and summary tabs. Click on an image for enlarged view." widths="200px"> | <gallery caption="MIDS calculator screen shots of results and summary tabs. Click on an image for enlarged view." widths="200px"> | ||
− | File:swale side slope results tab 1.png|alt= | + | File:swale side slope results tab 1.png|alt=Screen shot of BMP Summary tab for swale side slope|Screen shot of BMP Summary tab for swale side slope. See Step 9. |
− | File:Swale main channel BMP summary tab 2.png|alt= | + | File:Swale main channel BMP summary tab 2.png|alt=Screen shot of BMP Summary tab for wet swale|Screen shot of BMP Summary tab for wet swale. See Step 15. |
− | File:Swale main channel BMP summary tab 1.png|alt= | + | File:Swale main channel BMP summary tab 1.png|alt=Screen shot of BMP Summary tab for wet swale|Screen shot of BMP Summary tab for wet swale. See Step 15. |
− | File:results tab.png|alt= | + | File:results tab.png|alt=Screen shot of Results tab for the entire site|Screen shot of Results tab for the entire site. See Step 17. |
</gallery> | </gallery> | ||
Line 167: | Line 180: | ||
'''Step 12''': If help is needed, click on the ''Minnesota Stormwater Manual Wiki'' link or the ''Help'' button to review input parameter specifications and calculation specific to the ''Swale main channel'' BMP. | '''Step 12''': If help is needed, click on the ''Minnesota Stormwater Manual Wiki'' link or the ''Help'' button to review input parameter specifications and calculation specific to the ''Swale main channel'' BMP. | ||
− | '''Step 13''': Enter in the watershed information for the swale main channel in the ''Watershed'' tab (0.257 acre for Pervious Turf on A Soil which includes the area of the main channel and the other side slope). | + | '''Step 13''': Enter in the watershed information for the swale main channel in the ''Watershed'' tab (0.257 acre for Pervious Turf on A Soil, which includes the area of the main channel and the other side slope). |
− | '''Step 14''': Enter | + | '''Step 14''': Enter the BMP design parameters into the ''BMP Parameters'' tab. This Swale main channel example would require the following entries: |
− | *Channel length | + | *Channel length: 800 feet |
− | *Swale bottom width | + | *Swale bottom width: is 4 feet |
− | *Channel slope | + | *Channel slope: 2 percent (%) |
− | *Underlying soil – Hydrologic Soil Group | + | *Underlying soil – Hydrologic Soil Group: 4 SW (HSG A, 1.63 in/hr) (selected in dropdown box) |
− | *Manning’s n (vegetation) | + | *Manning’s n (vegetation): Native grass (selected in dropdown box) |
− | *Does the swale have a check dam | + | *Does the swale have a check dam: No |
− | *Does the swale have a bioretention base | + | *Does the swale have a bioretention base: No |
− | '''Step 15''': Click on | + | '''Step 15''': Click on ''BMP Summary'' tab to view results for this BMP. |
− | '''Step 16''': Click on the | + | '''Step 16''': Click on the ''OK'' button to exit the BMP Properties screen. |
− | '''Step 17''': Click on | + | '''Step 17''': Click on ''Results'' tab to see overall results for the site. |
==Requirements== | ==Requirements== | ||
− | [[File: | + | [[File:3 foot separation b.png|thumb|300px|alt=image illustrating separation distance to bedrock or seasonal high water table|<font size=3>Measurement of depth from the bottom of the infiltration BMP to the seasonally high water table or bedrock. Note that there must be a minimum of 2 feet separation when soils beneath the BMP are ripped, with a total separation distance of 3 feet or more. Infiltration BMPs include any BMP that allows water to infiltrate into the underlying soil.</font size>]] |
{{alert|The following are requirements of the [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/stormwater/construction-stormwater/index.html Minnesota Construction Stormwater General Permit]|alert-danger}} | {{alert|The following are requirements of the [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/stormwater/construction-stormwater/index.html Minnesota Construction Stormwater General Permit]|alert-danger}} | ||
− | *At least 3 feet of separation from the bottom of an infiltration system to the seasonal high water table (for swales with a bioretention base) | + | *At least 3 feet of separation from the bottom of an infiltration system to the [[Glossary#S|seasonal high water table]] (for swales with a bioretention base) |
*If soils below the bottom of the infiltration system are ripped to promote infiltration, at least 2 feet of separation from the bottom of the ripped zone to the seasonal high water table (for swales with a bioretention base) | *If soils below the bottom of the infiltration system are ripped to promote infiltration, at least 2 feet of separation from the bottom of the ripped zone to the seasonal high water table (for swales with a bioretention base) | ||
− | *Use the most restrictive infiltration rate within | + | *Use the most restrictive infiltration rate within 5 feet of the bottom of the BMP |
*For measured infiltration rates, apply a safety factor of 2 | *For measured infiltration rates, apply a safety factor of 2 | ||
*Pretreatment for infiltration systems (for swales with a bioretention base) | *Pretreatment for infiltration systems (for swales with a bioretention base) | ||
Line 203: | Line 216: | ||
*Guidance on determining [[Design criteria for bioretention#Determine site infiltration rates (for facilities with infiltration and/or recharge)|infiltration rates]] | *Guidance on determining [[Design criteria for bioretention#Determine site infiltration rates (for facilities with infiltration and/or recharge)|infiltration rates]] | ||
*Information on [[Stormwater infiltration and constraints on infiltration|site constraints]] (shallow soil, karst, etc.) | *Information on [[Stormwater infiltration and constraints on infiltration|site constraints]] (shallow soil, karst, etc.) | ||
− | *Guidance on [[ | + | *Guidance on [[Pretreatment]] |
*Information on [[Design criteria for bioretention#Materials specifications - filter media|soil mixes]] | *Information on [[Design criteria for bioretention#Materials specifications - filter media|soil mixes]] | ||
*[[Construction specifications for filtration|Construction specifications for filtration BMPs]] | *[[Construction specifications for filtration|Construction specifications for filtration BMPs]] | ||
Line 219: | Line 232: | ||
<noinclude> | <noinclude> | ||
− | [[Category:MIDS | + | [[Category:Level 3 - Models and modeling/Specific models/MIDS Calculator]] |
− | [[Category: | + | [[Category:Level 3 - Best management practices/Structural practices/Dry swale]] |
+ | [[Category:Level 3 - Best management practices/Structural practices/Step pool]] | ||
</noinclude> | </noinclude> |
For a swale main channel BMP (no underdrain), stormwater can be retained through three separate methods. Stormwater can infiltrate into the soils as it travels through the main channel to the outflow, stormwater can pond behind a check dam and infiltrate into the underlying soils, or stormwater can be stored in the pore spaces of an engineered bioretention base and infiltrate into the underlying soils. If stormwater runoff to the main channel flows over a side slope through sheet flow, then a swale side slope BMP should be used in combination with the swale main channel BMP in the MIDS calculator. All pollutants in the infiltrated water are credited as being reduced. A portion of pollutants in the stormwater that flows through the channel outflow is removed through filtration and sediment removal.
The particulate phosphorus credit has been reduced from 73 to 68 percent to match the TSS reduction. Particulate pollutant removal cannot exceed sediment removal.
For swale main channel systems, the user must input the following parameters to calculate the volume and pollutant load reductions associated with the BMP.
The Minimal Impact Design Standards (MIDS) Calculator separates side slopes and the main channel of swales into separate practices. This creates the potential for inaccurately routing water, since in reality side slopes and main channels are part of a single swale system. This page provides guidance for routing water to swales in the MIDS Calculator.
The MIDS Calculator separates swale side slopes and swale main channels into separate best management practices. This is because infiltration and pollutant retention calculations differ for the side slope and the main channel. Descriptions of modeling assumptions and calculations are found at the following links.
The primary difference between side slopes and main channels is due to increased potential for infiltration in a main channel resulting from different configurations. Specifically, infiltration in a main channel is affected by length of the swale, presence or absence of impermeable check dams, and presence or absence of engineered media. These configurations are either not available for side slopes or have limited impact on infiltration.
In reality, swale side slopes and main channels are part of a single swale practice. There are three possible configurations of swales. Configuring and routing water to them correctly is essential to correctly modeling swales.
These configurations are shown in the adjacent image.
If the following requirements for inputs into the MIDS calculator are not met, then an error message will inform the user to change the input to meet the requirement.
\(DDT_{calc} = D_{CD}/(I_R/ 12)\)
Where
If the DDTcalc is greater than the user-specified required drawdown time then the user will be prompted to enter a new check dam depth or infiltration rate of the native soils.
Required treatment volume, or the volume of stormwater runoff delivered to the BMP, equals the performance goal (1.1 inches or user-specified performance goal) times the impervious area draining to the BMP plus any water routed to the BMP from an upstream BMP. This stormwater is delivered to the BMP instantaneously.
The swale main channel BMP without an underdrain can achieve volume reduction capacity through three mechanisms. The first is from infiltration as the stormwater travels along the main channel (VMC). The second is from infiltration of stormwater that is stored behind an impermeable check dam (if installed) (VCD). The third is from infiltration of stormwater that is stored in the media of the bioretention base (if installed) (VBB).
The total instantaneous Volume reduction capacity of BMP [V] due to these three mechanisms is calculated using BMP design inputs provided by the user. This Volume reduction capacity of BMP [V] is then compared to the Required treatment volume in order to determine the Volume of retention provided by BMP, which is the instantaneous volume credit that can be claimed for that BMP.
With no real storage capacity unless impermeable check dams are present, the main method of stormwater volume reduction in a swale with no underdrain is via infiltration as the stormwater travels through the main channel. The infiltration capacity of the swale main channel bottom (VMC) is estimated based on analysis of long-term modeling results as described in the following paragraphs.
To determine the average annual volume reduction credit given for a swale main channel, the P8 water quality model was used. Fifty-five (55) years of hourly rainfall data were modeled for swale main channels with various configurations of channel length, swale bottom width, channel slope, soil infiltration rate, and Manning’s n parameters. The model results provided annual average volume reduction rates. Multivariate regression was used to assess model results to determine the relationships between swale modeling parameters and annual volume reductions. The observed relationships are paired with the user-provided inputs to calculate an annual percent stormwater volume reduction for the swale main channel in the calculator.
To obtain the volume reduction capacity of the channel bottom (VMC), the annual volume reductions are converted to a volume reduction capacity. This is accomplished through the use of performance curves developed from a range of modeling scenarios. The performance curves use the annual volume reduction percentage, the infiltration rate of the underlying soils, the contributing watershed percent impervious area, and the size of the contributing watershed to calculate the volume reduction capacity achieved through infiltration along the swale main channel (VMC).
In addition to the volume reduction provided as stormwater travels through the main channel, the storage capacity of the swale main channel can be increased through the addition of check dams. If the check dams are impermeable, they provide areas of ponded water in the swale main channel that will infiltrate into the soils. The Volume reduction capacity of BMP [V] gained through the addition of check dams in the system is equal to the storage volume provided behind a check dam multiplied by the number of check dams installed. The storage volume behind a check dam (VCD) is given by
\(V_{CD}= D_{CD}^2/S * (1/2 W_B + 1/6 (W_T -W_B )) \)
Where
The volume reduction capacity of the check dams (VCD) is added to the volume reduction capacity achieved through infiltration along the swale main channel (VMC).
The third method of volume reduction provided in a swale main channel BMP is through the addition of a bioretention base. This is a layer of engineered soils above the native soils capable of storing water and allowing it to infiltrate into the underlying native soils. The Volume reduction capacity associated with this BMP component is equal to the amount of water that can be instantaneously captured by the BMP in the media. The captured volume (VBB) is given by
\(V_{BB} = D_M * W_B * L_C * (n - FC)\)
Where
If a bioretention base is selected, then the credit given for the infiltration into the soils of the main channel (VMC) is removed since all stormwater that would have infiltrated into the soils as it travels through the main channel is now instead collected in the pore space of the media. If check dams are installed the total stormwater volume reduction capacity of the swale main channel would be equal to the volume reduction provided by the bioretention base (VBB) plus the storage capacity of the check dams (VCD).
The MIDS calculator compares the Volume reduction capacity of BMP [V] with the Required treatment volume, and the lesser of the two values is used to populate the Volume of retention provided by BMP. This comparison between potential and actual treatment volumes ensures that the BMP does not claim more credit than is due based on the actual amount of water routed to it. The Volume of retention provided by BMP is the actual volume credit the BMP receives toward the instantaneous performance goal. For example, if the BMP is oversized the user will only receive volume credit for the Required treatment volume routed to the BMP.
Annual volume retention is assessed by converting the instantaneous Volume reduction capacity of BMP [V] to an annual volume reduction percentage. This is accomplished through the use of performance curves developed from a range of modeling scenarios. These performance curves use the Volume reduction capacity of BMP [V], the infiltration rate of the underlying soils, the percent imperviousness of the contributing watershed area, and the size of the contributing watershed to calculate the Percent annual runoff volume retained and annual Retention volume provided by BMP.
Pollutant removal can be accomplished both via volume reducing and non-volume reducing processes in this BMP. Pollutant load reductions are calculated on an annual basis and are thus dependent upon the volume of water retained by the BMP through infiltration and the volume of water treated by filtration and sediment removal in the BMP.
The previously discussed annual volume reduction percentages are used to determine the annual pollutant load reductions achieved by the BMP. All pollutants in the infiltrated water are considered captured for a 100 percent removal. While oversizing a BMP above the Required treatment volume will not provide additional credit towards the performance goal volume, it may provide additional pollutant reduction.
For water routed to the main channel that does not infiltrate, pollutant removal occurs through filtration and sediment removal. Removal rates for this water are 68 percent for total suspended solids (TSS), 68 percent for particulate phosphorus, and 0 percent for dissolved phosphorus.
NOTE: The user can modify event mean concentrations (EMCs) on the Site Information tab in the calculator. Default concentrations are 54.5 milligrams per liter for total suspended solids (TSS) and 0.3 milligrams per liter for total phosphorus (particulate plus dissolved). The calculator will notify the user if the default is changed. Changing the default EMC will result in changes to the total pounds of pollutant reduced.
Overflow from a swale main channel can be routed to any other BMP, except for a green roof, a swale side slope, or any BMP in a stormwater treatment sequence that would cause stormwater to be rerouted back to the swale main channel already in that sequence. All BMPs can be routed to the swale main channel.
The following general assumption applies in calculating the credit for a swale main channel. If this assumption is not followed, the stormwater volume and pollutant reduction credits cannot be applied.
This example was completed using Version 2 of the Calculator.
The runoff from a 1.4 acre parking lot surrounded by 0.359 acres of pervious turf area flows through sheet flow over one of the side slopes of a swale and into a swale main channel. The soils across the area have a unified soils classification classification of SW (HSG type A soil). A second side slope associated with the main channel does not receive runoff from impervious surfaces. Each of the swale side slopes are 800 feet long by 10 feet wide with a side slope of 5H:1V. The main channel of the swale is 800 feet long by 4 feet wide with a 2 percent slope. The swale main channel does not have an underdrain, bioretention base or check dams. The maintenance on the swale calls for mowing once a year. The following steps detail how this system would be set up in the MIDS calculator.
Step 1: Determine the watershed characteristics of your entire site. For this example we have a 2.2 acre site with 1.4 acres of impervious area (parking lot) and 0.8 acres of pervious area in type A soils. The pervious area includes the turf area and the area of the swale side slopes and main channel.
Step 2: Fill in the site specific information into the Site Information tab. This includes entering a ZIP Code (55414 for this example) and the watershed information from Step 1. The Managed Turf area includes the turf area, the area of the side slopes and the area of the main channel. ZIP code and impervious area must be filled in or an error message will be generated. Other fields on this screen are optional.
Step 3: Go to the Schematic tab and drag and drop a Swale Side Slope and a Swale Main Channel icon into the Schematic Window.
Step 4: Determine the watershed characteristics for each of the BMP components. For this example the swale side slope watershed includes 1.4 acres of impervious area and 0.543 acre of pervious area (0.359 acre of turf area plus 0.184 acre of swale side slope). The watershed of the swale main channel includes the pervious area of the main channel (0.073 acre) and the pervious area of the other swale side slope (0.184 acre) for a total pervious area of 0.257 acre. Since no impervious area is being routed to the second swale side slope, the area can be included in the direct watershed area of the main channel. However, the second swale side slope could be placed in the calculator as an additional BMP. Including it as a separate BMP provides a slightly greater annual volume reduction and more closely represents the true system.
Step 5: Open the BMP properties for the swale side slope by right clicking on the Swale Side Slope icon and selecting Edit BMP Properties, or by double clicking on the Swale Side Slope icon.
Step 6: If help is needed, click on the Minnesota Stormwater Manual Wiki link or the Help button to review input parameter specifications and calculations specific to the Swale Side Slope BMP.
Step 7: Fill in the specific BMP watershed information (1.4 acres of impervious and 0.543 acre of Managed Turf on A Soils). Route the side slope BMP to the main channel BMP.
Step 8: Enter in the BMP design parameters into the BMP parameters tab. This Swale Side Slope example would require the following entries:
Step 9: Click on BMP Summary tab to view results for this BMP.
Step 10: Click on the OK button to exit the BMP properties screen. An arrow will appear showing that the swale side slope has been routed to the swale main channel.
Step 11: Open the BMP properties window for the swale main channel by right clicking on the Swale main channel icon and selecting Edit BMP properties, or by double clicking on the “Swale main channel” icon.
Step 12: If help is needed, click on the Minnesota Stormwater Manual Wiki link or the Help button to review input parameter specifications and calculation specific to the Swale main channel BMP.
Step 13: Enter in the watershed information for the swale main channel in the Watershed tab (0.257 acre for Pervious Turf on A Soil, which includes the area of the main channel and the other side slope).
Step 14: Enter the BMP design parameters into the BMP Parameters tab. This Swale main channel example would require the following entries:
Step 15: Click on BMP Summary tab to view results for this BMP.
Step 16: Click on the OK button to exit the BMP Properties screen.
Step 17: Click on Results tab to see overall results for the site.
This page was last edited on 29 January 2023, at 13:38.