m |
m |
||
(9 intermediate revisions by the same user not shown) | |||
Line 6: | Line 6: | ||
<th>Suitability in karst regions</th> | <th>Suitability in karst regions</th> | ||
<th>'''Karst considerations'''</th> | <th>'''Karst considerations'''</th> | ||
+ | <th>[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_16_Infiltration_Systems Construction stormwater permit restriction<sup>1</sup>]</th> | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 14: | Line 15: | ||
*Discharge point from the disconnect should extend at least 15 feet from any building foundation. | *Discharge point from the disconnect should extend at least 15 feet from any building foundation. | ||
</td> | </td> | ||
+ | <td>No</td> | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 23: | Line 25: | ||
*Larger designs that rely on exfiltration of treated runoff into the soils below are not recommended. | *Larger designs that rely on exfiltration of treated runoff into the soils below are not recommended. | ||
</td> | </td> | ||
+ | <td>No</td> | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 31: | Line 34: | ||
*Overflow of tank should extend at least 15 feet from building foundation. | *Overflow of tank should extend at least 15 feet from building foundation. | ||
</td> | </td> | ||
+ | <td>No</td> | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 39: | Line 43: | ||
*Runoff should be spread diffusely across landscape. | *Runoff should be spread diffusely across landscape. | ||
</td> | </td> | ||
+ | <td>No</td> | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 45: | Line 50: | ||
<td> | <td> | ||
*Runoff should be spread diffusely across landscape.</td> | *Runoff should be spread diffusely across landscape.</td> | ||
+ | <td>No</td> | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 53: | Line 59: | ||
*Incorporate compost amendments into the bottom of the channel to improve runoff reduction for vegetative uptake, and transpiration. | *Incorporate compost amendments into the bottom of the channel to improve runoff reduction for vegetative uptake, and transpiration. | ||
*Do not incorporate check dams unless the swale or channel incorporates an underdrain. Otherwise small areas of infiltration would develop in the zones upgradient of the check dam where the water is captured without adequate outlet. | *Do not incorporate check dams unless the swale or channel incorporates an underdrain. Otherwise small areas of infiltration would develop in the zones upgradient of the check dam where the water is captured without adequate outlet. | ||
+ | {{alert|If the CSW permit applies, Section 16.20 prohibits permittees from constructing infiltration systems in areas within 1,000 feet upgradient or 100 feet downgradient of active karst|alert-danger}} | ||
</td> | </td> | ||
+ | <td>Yes if designed for infiltration</td> | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 60: | Line 68: | ||
<td> | <td> | ||
*Recommended practice in areas of shallow bedrock and soil.</td> | *Recommended practice in areas of shallow bedrock and soil.</td> | ||
+ | <td>No</td> | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 66: | Line 75: | ||
<td> | <td> | ||
*Recommended practice in areas of shallow bedrock and soil.</td> | *Recommended practice in areas of shallow bedrock and soil.</td> | ||
+ | <td>No</td> | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 71: | Line 81: | ||
<td>Adequate</td> | <td>Adequate</td> | ||
<td></td> | <td></td> | ||
+ | <td>No</td> | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 78: | Line 89: | ||
*Create multiple small sized infiltration BMPs to infiltrate impervious areas of 250 to 2,500 square feet. | *Create multiple small sized infiltration BMPs to infiltrate impervious areas of 250 to 2,500 square feet. | ||
*Not recommended for sites identified as a stormwater hotspot. | *Not recommended for sites identified as a stormwater hotspot. | ||
+ | {{alert|If the CSW permit applies, Section 16.20 prohibits permittees from constructing infiltration systems in areas within 1,000 feet upgradient or 100 feet downgradient of active karst|alert-danger}} | ||
</td> | </td> | ||
+ | <td>Yes</td> | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Permeable pavement</td> | <td>Permeable pavement</td> | ||
<td>Adequate</td> | <td>Adequate</td> | ||
− | <td></td> | + | <td>{{alert|If the CSW permit applies, Section 16.20 prohibits permittees from constructing infiltration systems in areas within 1,000 feet upgradient or 100 feet downgradient of active karst|alert-danger}}</td> |
+ | <td>Yes if designed for infiltration (no underdrain)</td> | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 93: | Line 107: | ||
*Not recommended for sites identified as a stormwater hotspot. | *Not recommended for sites identified as a stormwater hotspot. | ||
*Incorporate pre-treatment to limit risk of groundwater contamination in the event of future failure of the BMP associated with development of a karst feature. Local review authority should be consulted for approval. | *Incorporate pre-treatment to limit risk of groundwater contamination in the event of future failure of the BMP associated with development of a karst feature. Local review authority should be consulted for approval. | ||
+ | {{alert|If the CSW permit applies, Section 16.20 prohibits permittees from constructing infiltration systems in areas within 1,000 feet upgradient or 100 feet downgradient of active karst|alert-danger}} | ||
</td> | </td> | ||
+ | <td>Yes</td> | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 101: | Line 117: | ||
*Requires larger surface area to drainage area ratios to limit the depth of the wetland. | *Requires larger surface area to drainage area ratios to limit the depth of the wetland. | ||
*Bedrock should act like a liner and help to maintain a permanent pool, unless fracture zone is present. | *Bedrock should act like a liner and help to maintain a permanent pool, unless fracture zone is present. | ||
− | * | + | *Consider using [http://stormwater.pca.state.mn.us/index.php/Liners_for_stormwater_management liner and liner cells]. |
+ | {{alert|If the CSW permit applies, liners are required in areas of active karst|alert-danger}} | ||
</td> | </td> | ||
+ | <td>No</td> | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 108: | Line 126: | ||
<td>Adequate</td> | <td>Adequate</td> | ||
<td> | <td> | ||
− | *Requires larger surface area to drainage area ratios to limit the depth of the basin or pond. If analysis shows that the soils can support the weight of a pond then a liner should be used | + | *Requires larger surface area to drainage area ratios to limit the depth of the basin or pond. If analysis shows that the soils can support the weight of a pond then a [http://stormwater.pca.state.mn.us/index.php/Liners_for_stormwater_management liner] should be used to prevent infiltration |
+ | {{alert|If the CSW permit applies, liners are required in areas of active karst|alert-danger}}</td> | ||
+ | <td>No</td> | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 114: | Line 134: | ||
<td>Discouraged</td> | <td>Discouraged</td> | ||
<td>Not feasible</td> | <td>Not feasible</td> | ||
+ | <td>No</td> | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 119: | Line 140: | ||
<td>Discouraged</td> | <td>Discouraged</td> | ||
<td> | <td> | ||
− | *Use small scale infiltration practices instead.</td> | + | *Use small scale infiltration practices instead. |
+ | {{alert|If the CSW permit applies, Section 16.20 prohibits permittees from constructing infiltration systems in areas within 1,000 feet upgradient or 100 feet downgradient of active karst|alert-danger}} | ||
+ | </td> | ||
+ | <td>Yes</td> | ||
</tr> | </tr> | ||
</table> | </table> | ||
− | + | <font size=1><sup>1</sup>[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_16_Infiltration_Systems#16.20 Section 16.20 of the CSW Permit] prohibits prohibits permittees from constructing infiltration systems in areas within 1,000 feet upgradient or 100 feet downgradient of [[Karst|active karst features]].</font size> | |
− | <noinclude>[[ | + | |
+ | <noinclude> | ||
+ | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Hydrology and geology]] | ||
+ | </noinclude> |
Stormwater BMP selection in karst settings. Sources Karst Working Group, 2009; Minnesota Stormwater Wiki; Tennessee Permanent Stormwater Management and Design Guidance.
Link to this table
BMP | Suitability in karst regions | Karst considerations | Construction stormwater permit restriction1 |
---|---|---|---|
Impervious area disconnect | Preferred |
|
No |
Bioretention with underdrain (biofiltration) | Preferred |
|
No |
Rain tank/cistern | Preferred |
|
No |
Rooftop disconnect | Preferred |
|
No |
Green roofs | Preferred |
|
No |
Dry swale or grassed channel | Preferred |
Warning: If the CSW permit applies, Section 16.20 prohibits permittees from constructing infiltration systems in areas within 1,000 feet upgradient or 100 feet downgradient of active karst
|
Yes if designed for infiltration |
Media filter | Preferred |
|
No |
Vegetative filter | Preferred |
|
No |
Soil compost amendment | Adequate | No | |
Small scale infiltration/micro-bioinfiltration | Adequate |
Warning: If the CSW permit applies, Section 16.20 prohibits permittees from constructing infiltration systems in areas within 1,000 feet upgradient or 100 feet downgradient of active karst
|
Yes |
Permeable pavement | Adequate | Warning: If the CSW permit applies, Section 16.20 prohibits permittees from constructing infiltration systems in areas within 1,000 feet upgradient or 100 feet downgradient of active karst |
Yes if designed for infiltration (no underdrain) |
Infiltration trench or basin | Adequate |
Warning: If the CSW permit applies, Section 16.20 prohibits permittees from constructing infiltration systems in areas within 1,000 feet upgradient or 100 feet downgradient of active karst
|
Yes |
Constructed wetlands | Adequate |
Warning: If the CSW permit applies, liners are required in areas of active karst
|
No |
Dry extended detention (ED) ponds and wet ponds | Adequate |
Warning: If the CSW permit applies, liners are required in areas of active karst |
No |
Wet swale | Discouraged | Not feasible | No |
Large scale infiltration | Discouraged |
Warning: If the CSW permit applies, Section 16.20 prohibits permittees from constructing infiltration systems in areas within 1,000 feet upgradient or 100 feet downgradient of active karst
|
Yes |
1Section 16.20 of the CSW Permit prohibits prohibits permittees from constructing infiltration systems in areas within 1,000 feet upgradient or 100 feet downgradient of active karst features.
This page was last edited on 13 December 2022, at 18:23.