<center><font size=3>Guidance on BMP selection based on physical feasibility characteristics of a site.</font size><br>
+
<font size=3>'''This table shows guidance on BMP selection based on physical feasibility characteristics of a site.'''</font size><br>
Link to this [[BMP selection based on physical feasibility|table]].</center>
+
Link to this [[BMP selection based on physical feasibility|table]].
 
<table class="sortable"><tr>
 
<table class="sortable"><tr>
 
<th>BMP group</th>
 
<th>BMP group</th>
Line 14: Line 14:
 
<tr>
 
<tr>
 
<td>Bioretention</td>
 
<td>Bioretention</td>
<td>7-10%; Minimum 200 ft<sup>b</sup><sup>2</sup></td>
+
<td>7-10%; Minimum 200 ft<sup>2</sup></td>
 
<td>5 acre maximum; 0.5-2.0 acre preferred</td>
 
<td>5 acre maximum; 0.5-2.0 acre preferred</td>
 
<td>Any soil; use underdrain for C and D soils<sup>d</sup></td>
 
<td>Any soil; use underdrain for C and D soils<sup>d</sup></td>
<td>4-6 feet</td>
+
<td></td>
 
<td>3 feet</td>
 
<td>3 feet</td>
 
<td>3 feet</td>
 
<td>3 feet</td>
Line 24: Line 24:
 
<tr>
 
<tr>
 
<td>Filtration - media</td>
 
<td>Filtration - media</td>
<td>Neglibible, except for access</td>
+
<td>Negligible, except for access</td>
 
<td>5 acre maximum; 0.5-2.0 acre preferred</td>
 
<td>5 acre maximum; 0.5-2.0 acre preferred</td>
 
<td>Media part of design<sup>d</sup></td>
 
<td>Media part of design<sup>d</sup></td>
Line 45: Line 45:
 
<td>Varies based on depth</td>
 
<td>Varies based on depth</td>
 
<td>5 to 10 acre maximum</td>
 
<td>5 to 10 acre maximum</td>
<td>Native soils with i>=0.2 inches/hour</td>
+
<td>Native soils with i >= 0.2 inches/hour</td>
 
<td>2-12 feet</td>
 
<td>2-12 feet</td>
 
<td>3 feet</td>
 
<td>3 feet</td>
Line 53: Line 53:
 
<tr>
 
<tr>
 
<td>Infiltration basin</td>
 
<td>Infiltration basin</td>
<td>Varies based on dept</td>
+
<td>Varies based on depth</td>
 
<td>5 to 50 acre maximum</td>
 
<td>5 to 50 acre maximum</td>
<td>Native soils with i>=0.2 inches/hour</td>
+
<td>Native soils with i >= 0.2 inches/hour</td>
 
<td>2-12 feet</td>
 
<td>2-12 feet</td>
 
<td>3 feet</td>
 
<td>3 feet</td>
Line 64: Line 64:
 
<td>Stormwater ponds</td>
 
<td>Stormwater ponds</td>
 
<td>1-3%</td>
 
<td>1-3%</td>
<td>25 acre minimum<sup>b</sup></td>
+
<td>10 to 25 acres recommended<sup>b</sup></td>
 
<td>A or B soils may require liner</td>
 
<td>A or B soils may require liner</td>
 
<td>3-10 feet</td>
 
<td>3-10 feet</td>
Line 83: Line 83:
 
</table>
 
</table>
 
<font size=1><sup>a</sup>Surface area as a function of contributing surface area, except for ponds and wetlands, where it is a function of entire drainage area<br>
 
<font size=1><sup>a</sup>Surface area as a function of contributing surface area, except for ponds and wetlands, where it is a function of entire drainage area<br>
<sup>b</sup>10 acres may be feasible if groundwater is intercepted and/or if water balance calculations indicate a wet pool can be sustained<br>
+
<sup>b</sup>10 acres or less may be feasible if groundwater is intercepted and/or if water balance calculations indicate a wet pool can be sustained<br>
 
<sup>c</sup>Slope is defined as the slope across the proposed location of the practice<br>
 
<sup>c</sup>Slope is defined as the slope across the proposed location of the practice<br>
<sup>d</sup>Infiltration gallery could be designed to provide limited recharge
+
<sup>d</sup>Infiltration gallery could be designed to provide limited recharge</font size>
 +
 
 +
<noinclude>
 +
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/General bmp information]]
 +
</noinclude>

Latest revision as of 20:03, 4 August 2022

This table shows guidance on BMP selection based on physical feasibility characteristics of a site.
Link to this table.

BMP group Surface areaa Drainage area Soil infiltration rate Head Separation from bedrock Depth to seasonally high water table Maximum slopec Ultra-urban
Bioretention 7-10%; Minimum 200 ft2 5 acre maximum; 0.5-2.0 acre preferred Any soil; use underdrain for C and D soilsd 3 feet 3 feet 20%Yes
Filtration - media Negligible, except for access 5 acre maximum; 0.5-2.0 acre preferred Media part of designd 2-6 feet0 feet if enclosed 3 feet for vegetated; 0 feet if enclosed 20%Yes
Filtration - vegetative Varies based on depth 10 acre maximum Media part of design 2-6 feet 0 feet if enclosed 3 feet for vegetated; 0 feet if enclosed 20%Possible
Infiltration trench Varies based on depth 5 to 10 acre maximum Native soils with i >= 0.2 inches/hour 2-12 feet 3 feet 3 feet 15%Possible
Infiltration basin Varies based on depth 5 to 50 acre maximum Native soils with i >= 0.2 inches/hour 2-12 feet 3 feet 3 feet 15%No
Stormwater ponds 1-3% 10 to 25 acres recommendedb A or B soils may require liner 3-10 feet 0 feet (shallow soil limits design) 0 feet (except if hotspot or aquifer) 25%No
Constructed wetlands 2-4% 25 acre minimumb A or B soils may require liner 3-10 feet 0 feet 0 feet (except if hotspot or aquifer) 25%No

aSurface area as a function of contributing surface area, except for ponds and wetlands, where it is a function of entire drainage area
b10 acres or less may be feasible if groundwater is intercepted and/or if water balance calculations indicate a wet pool can be sustained
cSlope is defined as the slope across the proposed location of the practice
dInfiltration gallery could be designed to provide limited recharge