− | + | <font size=3>'''This table shows recommended elements of a community snow management plan'''</font size><br>Click here to access [[Recommended elements of a community snow management plan|table]] | |
− | + | <table class="sortable"> | |
− | ''' | + | <tr><th>'''Plan Element'''</th> |
− | <tr><th>Plan Element</th> | + | <th>'''Recommended Practices'''</th> |
− | <th>Recommended Practices</th> | + | </tr> |
+ | <tr> | ||
+ | <th colspan="2"><center>'''Snow Removal and Disposal Approach'''</center></th> | ||
</tr> | </tr> | ||
+ | <tr></tr> | ||
<tr> | <tr> | ||
<td>Formalize snow removal and disposal goals and objectives (action steps)</td> | <td>Formalize snow removal and disposal goals and objectives (action steps)</td> | ||
Line 10: | Line 13: | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
− | <td>Develop plowing and removal/ | + | <td>Develop plowing and removal/redistribution plan</td> |
− | redistribution plan</td> | ||
<td>Formalize goals and objectives into an action plan that clearly delineates steps that will be taken under different snow and ice scenarios; target problem areas (such as ice formation)</td> | <td>Formalize goals and objectives into an action plan that clearly delineates steps that will be taken under different snow and ice scenarios; target problem areas (such as ice formation)</td> | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
− | <td | + | <td colspan="2"><center>'''Salt/Mixed Sand-Salt Storage'''</center></td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 30: | Line 32: | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
− | <td | + | <td colspan="2"><center>'''Chemical Application Practices'''</center></td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 49: | Line 51: | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
− | <td | + | <td colspan="2"><center>'''Opportunities for BMP Adaptation'''</center></td> |
</tr> | </tr> | ||
Line 60: | Line 62: | ||
<td>Identify problem BMPs that could be preventing adequate runoff treatment and program to manage them better</td> | <td>Identify problem BMPs that could be preventing adequate runoff treatment and program to manage them better</td> | ||
</tr> | </tr> | ||
+ | <tr> | ||
+ | <td colspan="2"><center>'''Winter Construction Control'''</center></td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td>Assess current practices used in your community</td> | ||
+ | <td>As part of SWPPP, are there any limits on construction or special BMPs required during the winter season</td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td>List special provisions</td> | ||
+ | <td>Identify possible protective measures that could be adopted to prevent problems associated with winter conditions</td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td colspan="2"><center>'''Method of Addressing New Site Versus Existing Site'''</center></td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td>Assess need for construction control program</td> | ||
+ | <td>Notify new sites covered under NPDES construction permit process that they are required to address snow in a site SWPPP</td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td>Assess need for MS4 program under post-construction elements</td> | ||
+ | <td>Address existing sites covered under the umbrella of the MS4 SWPPP or any re-development permitting</td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td colspan="2"><center>'''Pollution Prevention Efforts'''</center></td> | ||
+ | <td>X</td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td>Develop pollution prevention program focused on winter activities</td> | ||
+ | <td>List program elements that could be used to prevent runoff problems from occurring during the winter construction season; adopt ones most appropriate to your community</td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td>Identify any measures that show effectiveness</td> | ||
+ | <td>Identify other methods that could be used, although not part of previous element</td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | </table> | ||
− | </ | + | <noinclude>[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Chloride, salt management]] |
+ | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Cold climate]] | ||
+ | </noinclude> |
This table shows recommended elements of a community snow management plan
Click here to access table
Plan Element | Recommended Practices | |
---|---|---|
Formalize snow removal and disposal goals and objectives (action steps) | Adopt community snow removal and disposal goals and objectives so citizens know what to expect under certain conditions; clarify intent of wiser salt use | |
Develop plowing and removal/redistribution plan | Formalize goals and objectives into an action plan that clearly delineates steps that will be taken under different snow and ice scenarios; target problem areas (such as ice formation) | |
Characterization of storage areas | Identify areas where both public and private salt and salt-sand mixes are accumulated and stored, and the characteristics of these areas, such as:
|
|
Cover exposed chemicals | Provide a small containment shelter with full coverage and a 3” lip to stop small flow from even leaving the storage pile. For larger operations, full coverage of both storage and mixing areas, and removal of unused pre-mixed sand/salt back into covered storage is recommended | |
Identify the amount and manner of salt use | Determine the volume of salt being used, by whom, and where they are storing and applying it | |
Identify training programs for salt handlers | Institute formal training program for all loaders and applicators | |
Specify methods used to minimize salt application rate | Develop protocol for promotion of less salt use through driver training, equipment calibration and maintenance, pre-wetting techniques, antiicing, sand mixing | |
Initiate record keeping system to track application rates by route and driver | Develop log system to track the amount of salt applied by each dri | |
Map surface water drainage system and BMPs designed to handle runoff | Examine existing drainage maps to determine where chloride-laden meltwater runoff will go; identify sensitive water bodies; and assess the effectiveness of BMPs to treat snowmelt runoff | |
Upgrade BMPs if needed | Identify problem BMPs that could be preventing adequate runoff treatment and program to manage them better | |
Assess current practices used in your community | As part of SWPPP, are there any limits on construction or special BMPs required during the winter season | |
List special provisions | Identify possible protective measures that could be adopted to prevent problems associated with winter conditions | |
Assess need for construction control program | Notify new sites covered under NPDES construction permit process that they are required to address snow in a site SWPPP | |
Assess need for MS4 program under post-construction elements | Address existing sites covered under the umbrella of the MS4 SWPPP or any re-development permitting | |
X | ||
Develop pollution prevention program focused on winter activities | List program elements that could be used to prevent runoff problems from occurring during the winter construction season; adopt ones most appropriate to your community | |
Identify any measures that show effectiveness | Identify other methods that could be used, although not part of previous element | |