m |
m |
||
(One intermediate revision by the same user not shown) | |||
Line 66: | Line 66: | ||
<sup>2</sup>bottom half of each row = lbs/1000 sq ft. To find this, divide the number in the top half by 63</font size> | <sup>2</sup>bottom half of each row = lbs/1000 sq ft. To find this, divide the number in the top half by 63</font size> | ||
− | [[ | + | <noinclude> |
+ | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Chloride, salt management]] | ||
+ | </noinclude> |
Step 4 Calibration Chart for auger or conveyor systems
Link to this table
Date: August 8, 2015 | |||||
Spreader #: A4219 | |||||
Material: Rock salt | |||||
Setting | Pounds per minute | 5 mph (X12) | 10 mph (X6) | 15 mph (X4) | 20 mph (X3) |
---|---|---|---|---|---|
1 | 10 | 1201 | 60 | 40 | 30 |
1.92 | 1.0 | 0.6 | 0.5 | ||
2 | 22 | 264 | 132 | 88 | 66 |
4.2 | 2.1 | 1.4 | 1.0 | ||
3 | 34 | 408 | 204 | 136 | 102 |
6.5 | 3.2 | 2.2 | 1.6 |
1 Top half of each row = lbs/lane mile. To get this number, multiply lbs/min by the factor shown for each speed
2bottom half of each row = lbs/1000 sq ft. To find this, divide the number in the top half by 63
This page was last edited on 4 August 2022, at 15:46.