(Created page with " <center><font size=3>''BMP design considerations for ground water aquifer protection</font size>'''<br> Link to this [[BMP design considerations for ground water aquifer prot...")
 
m
 
(9 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
+
<font size=3>'''BMP design considerations for groundwater aquifer protection</font size>'''<br>
<center><font size=3>''BMP design considerations for ground water aquifer protection</font size>'''<br>
+
Link to this [[BMP design considerations for ground water aquifer protection|table]]
Link to this [[BMP design considerations for ground water aquifer protection|table]]</center>
 
 
<table class="sortable">
 
<table class="sortable">
 
<tr><th>BMP Group</th>
 
<tr><th>BMP Group</th>
Line 8: Line 7:
 
<tr>
 
<tr>
 
<td>Bioretention</td>
 
<td>Bioretention</td>
<td>*OK with proper caution for PSH</td>
+
<td>
 +
*OK with proper caution for PSH</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 26: Line 26:
 
<td>Stormwater Ponds</td>
 
<td>Stormwater Ponds</td>
 
<td>
 
<td>
*Needed liner if A soils or active karst are present
+
*May need liner if A soils or active karst are present. The CSW permit requires a liner in areas of active karst.
 
*Pre-treat PSH runoff
 
*Pre-treat PSH runoff
 
*Provide a separation distance from well or water table to BMP</td>
 
*Provide a separation distance from well or water table to BMP</td>
Line 33: Line 33:
 
<td>Constructed Stormwater Wetlands</td>
 
<td>Constructed Stormwater Wetlands</td>
 
<td>
 
<td>
*May needed liner if A soils or active karst are present
+
*May need liner if A soils or active karst are present. The CSW permit requires a liner in areas of active karst.
 
*Pre-treat PSH runoff
 
*Pre-treat PSH runoff
 
*Provide a separation distance from well or water table to BMP</td>
 
*Provide a separation distance from well or water table to BMP</td>
 +
</table>
  
</table>
+
<noinclude>
 +
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/General bmp information]]
 +
</noinclude>

Latest revision as of 20:03, 4 August 2022

BMP design considerations for groundwater aquifer protection
Link to this table

BMP Group Design Consideration
Bioretention
  • OK with proper caution for PSH
Filtration
  • OK with proper caution for PSH
  • Open channels are OK, but polluted runoff must be adequately pretreated
Infiltration
  • Provide a 100-foot horizontal separation distance from wells and three-foot vertical distance from the water table
  • No PSH runoff, unless treated by another practice, such as a filtering system
  • Needed pre-treatment of all runoff except rooftop
Stormwater Ponds
  • May need liner if A soils or active karst are present. The CSW permit requires a liner in areas of active karst.
  • Pre-treat PSH runoff
  • Provide a separation distance from well or water table to BMP
Constructed Stormwater Wetlands
  • May need liner if A soils or active karst are present. The CSW permit requires a liner in areas of active karst.
  • Pre-treat PSH runoff
  • Provide a separation distance from well or water table to BMP

This page was last edited on 4 August 2022, at 20:03.