m |
|||
(3 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | + | <font size=3>'''Typical winter decommission and maintenance tasks'''</font size><br> | |
− | + | Link to this [[Typical winter decommission and maintenance tasks|table]] | |
− | Link to this [[Typical winter decommission and maintenance tasks|table]] | ||
<table class="sortable"> | <table class="sortable"> | ||
Line 8: | Line 7: | ||
<th>Typical decommissioning and winter maintenance tasks needed prior to spring startup <sup>1</sup></th> | <th>Typical decommissioning and winter maintenance tasks needed prior to spring startup <sup>1</sup></th> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>'''Source Area/Collection Surface'''</td> | <td>'''Source Area/Collection Surface'''</td> | ||
Line 14: | Line 12: | ||
*Clean residual de-icing material (sand, salt) from pavement prior to spring startup </td> | *Clean residual de-icing material (sand, salt) from pavement prior to spring startup </td> | ||
</tr> | </tr> | ||
− | |||
− | |||
− | |||
<tr> | <tr> | ||
<td>'''Collection System'''</td> | <td>'''Collection System'''</td> | ||
Line 22: | Line 17: | ||
*Drain and disconnect conveyances to prevent freeze/thaw damage</td> | *Drain and disconnect conveyances to prevent freeze/thaw damage</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<td>'''Storage System'''</td> | <td>'''Storage System'''</td> | ||
Line 33: | Line 26: | ||
</td> | </td> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<td>'''Treatment System'''</td> | <td>'''Treatment System'''</td> | ||
Line 42: | Line 33: | ||
</td> | </td> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<td>'''Distribution System'''</td> | <td>'''Distribution System'''</td> | ||
Line 53: | Line 42: | ||
</td> | </td> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<td>'''Overflow/Bypass Systems'''</td> | <td>'''Overflow/Bypass Systems'''</td> | ||
Line 60: | Line 47: | ||
*Drain and disconnect to prevent freeze/thaw damage</td> | *Drain and disconnect to prevent freeze/thaw damage</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
− | |||
− | |||
</table> | </table> | ||
− | + | <noinclude> | |
− | + | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Chloride, salt management]] | |
− | + | </noinclude> | |
− | |||
− | [[ |
Typical winter decommission and maintenance tasks
Link to this table
Component | Typical decommissioning and winter maintenance tasks needed prior to spring startup 1 |
---|---|
Source Area/Collection Surface |
|
Collection System |
|
Storage System |
|
Treatment System |
|
Distribution System |
|
Overflow/Bypass Systems |
|
This page was last edited on 4 August 2022, at 15:51.