m
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
 +
Blanket is not installed properly: there is no overlap between blanket segments and blanket is suspended above the ground, suggesting a rill or gully could be present. Either the ground shall be regraded and blanket re-installed or blanket should lie flat on ground. In either case blanket ends should overlap.
  
 +
[[Category:Level 3 - General information, reference, tables, images, and archives/Images/Erosion prevention photos]]

Latest revision as of 16:15, 19 December 2022

Blanket is not installed properly: there is no overlap between blanket segments and blanket is suspended above the ground, suggesting a rill or gully could be present. Either the ground shall be regraded and blanket re-installed or blanket should lie flat on ground. In either case blanket ends should overlap.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current14:09, 18 August 2016Thumbnail for version as of 14:09, 18 August 2016976 × 620 (122 KB)Mtrojan (talk | contribs)

This page was last edited on 19 December 2022, at 16:15.