m
 
Line 45: Line 45:
 
______________________________________________________________________________________
 
______________________________________________________________________________________
 
______________________________________________________________________________________
 
______________________________________________________________________________________
 +
 +
[[Category:Level 3 - Best management practices/Specifications and details/Operation and maintenance]]

Latest revision as of 19:26, 6 December 2022

Infiltration Basins

Maintenance Inspection Report

Date: ____________________________________________________________________

Inspector Name/Address/Phone Number: _______________________________________

Site Address: ______________________________________________________________

Owner Name/Address/Phone Number: _________________________________________

Drainage Area Stabilization (Inspect after large storms for first two years, Inspect yearly in spring or after large storms after first two years)

  • Erosion control/planting/seeding necessary: _________________________________________________
  • Mowing, pruning and debris removal necessary: ______________________________________________
  • Observations:

______________________________________________________________________________________ ______________________________________________________________________________________

Inlets & Pretreatment Structures (Inspect in Spring and Fall)

  • Repair needed: _________________________________________________________________________
  • Debris & sediment removal required: _______________________________________________________
  • Erosion evident: ________________________________________________________________________
  • Water by-passing inlet: __________________________________________________________________
  • Vegetation control necessary: _____________________________________________________________
  • Observations:

______________________________________________________________________________________ ______________________________________________________________________________________

Basin (Inspect after large storms for first two years, Inspect yearly in spring or after large storms after first two years)

  • Condition of infiltration area: ______________________________________________________________
  • Surface erosion evident: __________________________________________________________________
  • Debris/sediment removal required: _________________________________________________________
  • Adequate drawdown/standing water: _______________________________________________________
  • Vegetation control necessary: _____________________________________________________________
  • Observations:

______________________________________________________________________________________ ______________________________________________________________________________________

Outlet/Emergency Overflow (Inspect in Spring and Fall)

  • Overflow type: _________________________________________________________________________
  • Debris/sediment removal required: _________________________________________________________
  • Repair needed: _________________________________________________________________________
  • Observations:

______________________________________________________________________________________ ______________________________________________________________________________________

This page was last edited on 6 December 2022, at 19:26.