(Created page with "<center><font size=3>'''Average Bid Prices for Spec Year 2014'''</font size><br> Link to this table</center> <table class="sortable...") |
m |
||
(8 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | + | <font size=3>'''Average bid prices for Specification Year 2014. Source: [https://www.dot.state.mn.us/bidlet/average-bid-price.html MnDOT]'''</font size><br> | |
− | + | Link to this [[Average Bid Prices for Spec Year 2014|table]] | |
− | Link to this [[Average Bid Prices for Spec Year 2014|table]] | ||
<table class="sortable"> | <table class="sortable"> | ||
Line 7: | Line 6: | ||
<th>Bid Item</th> | <th>Bid Item</th> | ||
<th>Item Description</th> | <th>Item Description</th> | ||
− | <th>Units</th> | + | <th>Units<sup>1</sup></th> |
<th>Average Price</th> | <th>Average Price</th> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>2105.601/00045</td> | <td>2105.601/00045</td> | ||
<td>Temporary Stream Diversion System</td> | <td>Temporary Stream Diversion System</td> | ||
<td>LS</td> | <td>LS</td> | ||
− | <td>&# | + | <td>$26,292.50</td> |
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<td>2452.601/00011</td> | <td>2452.601/00011</td> | ||
<td>Steel Sheet Piling (Temporary)</td> | <td>Steel Sheet Piling (Temporary)</td> | ||
<td>LS</td> | <td>LS</td> | ||
− | <td>&# | + | <td>$107,614.29</td> |
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>2452.618/00011</td> | <td>2452.618/00011</td> | ||
<td>Steel Sheet Piling (Temporary)</td> | <td>Steel Sheet Piling (Temporary)</td> | ||
<td>SF</td> | <td>SF</td> | ||
− | <td>&# | + | <td>$16.75</td> |
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>2573.504/00010</td> | <td>2573.504/00010</td> | ||
<td>Sandbag Barrier</td> | <td>Sandbag Barrier</td> | ||
<td>SF</td> | <td>SF</td> | ||
− | <td>&# | + | <td>$10.55</td> |
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>2105.601/00010</td> | <td>2105.601/00010</td> | ||
<td>Dewatering</td> | <td>Dewatering</td> | ||
<td>LS</td> | <td>LS</td> | ||
− | <td>&# | + | <td>$65,587.94</td> |
</tr> | </tr> | ||
− | |||
− | |||
− | |||
− | |||
</table> | </table> | ||
+ | <font size=1><sup>1</sup>LS = lump sum; SF = square foot</font size> | ||
− | + | <noinclude> | |
− | + | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Sediment control]] | |
− | + | </noinclude> | |
− | |||
− | [[ |
Average bid prices for Specification Year 2014. Source: MnDOT
Link to this table
Bid Item | Item Description | Units1 | Average Price |
---|---|---|---|
2105.601/00045 | Temporary Stream Diversion System | LS | $26,292.50 |
2452.601/00011 | Steel Sheet Piling (Temporary) | LS | $107,614.29 |
2452.618/00011 | Steel Sheet Piling (Temporary) | SF | $16.75 |
2573.504/00010 | Sandbag Barrier | SF | $10.55 |
2105.601/00010 | Dewatering | LS | $65,587.94 |
1LS = lump sum; SF = square foot
This page was last edited on 26 July 2022, at 13:18.