<font size=3>'''Average Bid Prices for Spec Year 2014'''</font size><br>
+
<font size=3>'''Average bid prices for Specification Year 2014. Source: [https://www.dot.state.mn.us/bidlet/average-bid-price.html MnDOT]'''</font size><br>
 
Link to this [[Average Bid Prices for Spec Year 2014|table]]
 
Link to this [[Average Bid Prices for Spec Year 2014|table]]
  
Line 6: Line 6:
 
<th>Bid Item</th>
 
<th>Bid Item</th>
 
<th>Item Description</th>
 
<th>Item Description</th>
<th>Units</th>
+
<th>Units<sup>1</sup></th>
 
<th>Average Price</th>
 
<th>Average Price</th>
 
</tr>
 
</tr>
Line 13: Line 13:
 
<td>Temporary Stream Diversion System</td>
 
<td>Temporary Stream Diversion System</td>
 
<td>LS</td>
 
<td>LS</td>
<td>&#128178;26,292.50</td>
+
<td>&#36;26,292.50</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 19: Line 19:
 
<td>Steel Sheet Piling (Temporary)</td>
 
<td>Steel Sheet Piling (Temporary)</td>
 
<td>LS</td>
 
<td>LS</td>
<td>&#128178;107,614.29</td>
+
<td>&#36;107,614.29</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 25: Line 25:
 
<td>Steel Sheet Piling (Temporary)</td>
 
<td>Steel Sheet Piling (Temporary)</td>
 
<td>SF</td>
 
<td>SF</td>
<td>&#128178;16.75</td>
+
<td>&#36;16.75</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 31: Line 31:
 
<td>Sandbag Barrier</td>
 
<td>Sandbag Barrier</td>
 
<td>SF</td>
 
<td>SF</td>
<td>&#128178;10.55</td>
+
<td>&#36;10.55</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 37: Line 37:
 
<td>Dewatering</td>
 
<td>Dewatering</td>
 
<td>LS</td>
 
<td>LS</td>
<td>&#128178;65,587.94</td>
+
<td>&#36;65,587.94</td>
 
</tr>
 
</tr>
 
</table>
 
</table>
 +
<font size=1><sup>1</sup>LS = lump sum; SF = square foot</font size>
  
[[category:Table]]
+
<noinclude>
 +
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Sediment control]]
 +
</noinclude>

Latest revision as of 13:18, 26 July 2022

Average bid prices for Specification Year 2014. Source: MnDOT
Link to this table

Bid Item Item Description Units1 Average Price
2105.601/00045 Temporary Stream Diversion System LS $26,292.50
2452.601/00011 Steel Sheet Piling (Temporary) LS $107,614.29
2452.618/00011 Steel Sheet Piling (Temporary) SF $16.75
2573.504/00010 Sandbag Barrier SF $10.55
2105.601/00010 Dewatering LS $65,587.94

1LS = lump sum; SF = square foot