m |
m |
||
(3 intermediate revisions by the same user not shown) | |||
Line 13: | Line 13: | ||
<td>Temporary Stream Diversion System</td> | <td>Temporary Stream Diversion System</td> | ||
<td>LS</td> | <td>LS</td> | ||
− | <td>&# | + | <td>$26,292.50</td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 19: | Line 19: | ||
<td>Steel Sheet Piling (Temporary)</td> | <td>Steel Sheet Piling (Temporary)</td> | ||
<td>LS</td> | <td>LS</td> | ||
− | <td>&# | + | <td>$107,614.29</td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 25: | Line 25: | ||
<td>Steel Sheet Piling (Temporary)</td> | <td>Steel Sheet Piling (Temporary)</td> | ||
<td>SF</td> | <td>SF</td> | ||
− | <td>&# | + | <td>$16.75</td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 31: | Line 31: | ||
<td>Sandbag Barrier</td> | <td>Sandbag Barrier</td> | ||
<td>SF</td> | <td>SF</td> | ||
− | <td>&# | + | <td>$10.55</td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 37: | Line 37: | ||
<td>Dewatering</td> | <td>Dewatering</td> | ||
<td>LS</td> | <td>LS</td> | ||
− | <td>&# | + | <td>$65,587.94</td> |
</tr> | </tr> | ||
</table> | </table> | ||
<font size=1><sup>1</sup>LS = lump sum; SF = square foot</font size> | <font size=1><sup>1</sup>LS = lump sum; SF = square foot</font size> | ||
− | [[ | + | <noinclude> |
+ | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Sediment control]] | ||
+ | </noinclude> |
Average bid prices for Specification Year 2014. Source: MnDOT
Link to this table
Bid Item | Item Description | Units1 | Average Price |
---|---|---|---|
2105.601/00045 | Temporary Stream Diversion System | LS | $26,292.50 |
2452.601/00011 | Steel Sheet Piling (Temporary) | LS | $107,614.29 |
2452.618/00011 | Steel Sheet Piling (Temporary) | SF | $16.75 |
2573.504/00010 | Sandbag Barrier | SF | $10.55 |
2105.601/00010 | Dewatering | LS | $65,587.94 |
1LS = lump sum; SF = square foot
This page was last edited on 26 July 2022, at 13:18.