m |
m |
||
(2 intermediate revisions by the same user not shown) | |||
Line 57: | Line 57: | ||
</table> | </table> | ||
− | [[ | + | <noinclude> |
+ | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Sediment control]] | ||
+ | </noinclude> |
Expected performance for check dams
Link to this table
Water Quantity | |
---|---|
Flow attenuation | Secondary design benefit |
Runoff volume reduction | Secondary design benefit |
Water Quantity | |
Pollution prevention | |
Erosion prevention (i.e., for channel banks) | Primary design benefit |
Sediment control | Secondary design benefit |
Nutrient loading | Secondary design benefit |
Pollutant removal | |
Total suspended solids | Secondary design benefit |
Total phosphorus | Secondary design benefit |
Heavy metals | Secondary design benefit |
Floatables | Secondary design benefit |
Oil and grease | Secondary design benefit |
This page was last edited on 26 July 2022, at 13:20.