(Created page with "*Land grading - reshaping the ground surface to planned grades as determined by engineering survey evaluation and layout *Lot benching - the grading of lots within a subdivisi...")
 
m
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
 
*Lot benching - the grading of lots within a subdivision so that the runoff from each lot is directed to a stable outlet rather than to an adjacent lot.
 
*Lot benching - the grading of lots within a subdivision so that the runoff from each lot is directed to a stable outlet rather than to an adjacent lot.
 
*Trackout - dirt, mud or other debris tracked onto a paved public road by a vehicle leaving a construction site.
 
*Trackout - dirt, mud or other debris tracked onto a paved public road by a vehicle leaving a construction site.
 +
<noinclude>
 +
[[Category:Level 2 - Regulatory/Construction (CSW)]]
 +
</noinclude>

Latest revision as of 01:29, 7 December 2022

  • Land grading - reshaping the ground surface to planned grades as determined by engineering survey evaluation and layout
  • Lot benching - the grading of lots within a subdivision so that the runoff from each lot is directed to a stable outlet rather than to an adjacent lot.
  • Trackout - dirt, mud or other debris tracked onto a paved public road by a vehicle leaving a construction site.

This page was last edited on 7 December 2022, at 01:29.