(Created page with "<font size=3>'''Wet swale construction inspection checklist'''.</font size><br> Link to this table<br> To access an Excel versi...") |
m |
||
(7 intermediate revisions by the same user not shown) | |||
Line 64: | Line 64: | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
− | <td>Size and | + | <td>Size, location, and inverts per plans</td> |
<td> </td> | <td> </td> | ||
<td> </td> | <td> </td> | ||
Line 84: | Line 84: | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
− | < | + | <td>Groundwater/bedrock verified</td> |
− | |||
<td> </td> | <td> </td> | ||
<td> </td> | <td> </td> | ||
</tr> | </tr> | ||
+ | <tr> | ||
<td>Stockpile location not adjacent to excavation area and stabilized with vegetation and/ or silt fence</td> | <td>Stockpile location not adjacent to excavation area and stabilized with vegetation and/ or silt fence</td> | ||
<td> </td> | <td> </td> | ||
Line 98: | Line 98: | ||
<td></td> | <td></td> | ||
</tr> | </tr> | ||
+ | <tr> | ||
<th colspan=3>3. Structural Components</th> | <th colspan=3>3. Structural Components</th> | ||
</tr> | </tr> | ||
Line 151: | Line 152: | ||
<th colspan=3>5. Final Inspection</th> | <th colspan=3>5. Final Inspection</th> | ||
</tr> | </tr> | ||
+ | <tr> | ||
+ | <td colspan=3>Project:</td> | ||
<tr> | <tr> | ||
<td>Dimensions per plans</td> | <td>Dimensions per plans</td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td>Check dams operational</td> | ||
<td> </td> | <td> </td> | ||
<td> </td> | <td> </td> | ||
Line 192: | Line 200: | ||
<noinclude> | <noinclude> | ||
− | [[ | + | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Checklist]] |
+ | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Swales]] | ||
</noinclude> | </noinclude> |
Wet swale construction inspection checklist.
Link to this table
To access an Excel version of form (for field use), click here.
Project: | ||
Location: | ||
Site Status: | ||
Date: | ||
Time: | ||
Inspector: | ||
Construction Sequence | Satisfactory / Unsatisfactory | Comments |
---|---|---|
1. Pre-Construction | ||
Pre-construction meeting | ||
Runoff diverted (Note type of bypass) | ||
Facility area cleared | ||
Project benchmark near site | ||
Facility location staked out | ||
Temporary erosion and sediment protection properly installed | ||
2. Excavation | ||
Size, location, and inverts per plans | ||
Side slopes stable | ||
Lateral slopes completely level | ||
Longitudinal slopes within design range | ||
Groundwater/bedrock verified | ||
Stockpile location not adjacent to excavation area and stabilized with vegetation and/ or silt fence | ||
Verify stockpile is not eroding | ||
3. Structural Components | ||
Outlets installed pre plans | ||
Pretreatment devices installed per plans | ||
Soil bed composition and texture conforms to specifications | ||
Inlets installed per plans | ||
4. Vegetation | ||
For native wet swales, plants and materials ordered 6 months prior to construction | ||
For native wet swales, construction planned to allow for adequate planting and establishment of plant community | ||
Complies with planting specs | ||
Topsoil complies with specs in composition and placement | ||
Soil properly stabilized for permanent erosion control | ||
5. Final Inspection | ||
Project: | ||
Dimensions per plans | ||
Check dams operational | ||
Pre-treatment operational | ||
Inlet/outlet operational | ||
Effective stand of vegetation stabilized per specifications | ||
Construction generated sediments removed | ||
Contributing watershed stabilized before flow is diverted to the practice | ||
Comments: | ||
Actions to be taken: |
This page was last edited on 4 August 2022, at 17:17.