m
m
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
<font size=3>'''Summary of infiltration practices cost components'''.</font size><br>
 +
Link to this [[Infiltration practices cost components|table]]
  
 
<center><font size=3>'''This table shows infiltration practices cost components'''.</font size><br>
 
Link to this [[Infiltration practices cost components|table]]</center>
 
 
<table class="sortable"><tr>
 
<table class="sortable"><tr>
 
<tr>
 
<tr>
Line 13: Line 12:
 
<td rowspan=4>Site Preparation</td>
 
<td rowspan=4>Site Preparation</td>
 
<td>Tree & plant protection</td>
 
<td>Tree & plant protection</td>
<td>Protection Cost ($/acre) x Affected Area (acre)</td>
+
<td>Protection Cost ($/acre) * Affected Area (acre)</td>
 
<td rowspan=4>Removal of existing structures, topsoil removal and stockpiling</td>
 
<td rowspan=4>Removal of existing structures, topsoil removal and stockpiling</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Infiltration area protection</td>
 
<td>Infiltration area protection</td>
<td>Silt fence cost ($/’foot) x Perimeter of infiltration area</td>
+
<td>Silt fence cost ($/’foot) * Perimeter of infiltration area</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Clearing & grubbing</td>
 
<td>Clearing & grubbing</td>
<td>Clearing Cost ($/acre) x Affected Area (acre)</td>
+
<td>Clearing Cost ($/acre) * Affected Area (acre)</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Topsoil salvage</td>
 
<td>Topsoil salvage</td>
<td>Salvage Cost ($/acre) x Affected Area</td>
+
<td>Salvage Cost ($/acre) * Affected Area</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td rowspan=2>Site Formation</td>
 
<td rowspan=2>Site Formation</td>
 
<td>Excavation / grading</td>
 
<td>Excavation / grading</td>
<td>X-ft Depth Excavation Cost ($/acre) x Area (acre)</td>
+
<td>X-ft Depth Excavation Cost ($/acre) * Area (acre)</td>
 
<td rowspan=2>Soil & rock fill material, tunneling</td></tr>
 
<td rowspan=2>Soil & rock fill material, tunneling</td></tr>
 
<tr>
 
<tr>
 
<td>Hauling material offsite</td>
 
<td>Hauling material offsite</td>
<td>Excavation Cost x (% of Material to be hauled away)</td>
+
<td>Excavation Cost * (% of Material to be hauled away)</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 45: Line 44:
 
<tr>
 
<tr>
 
<td>Media (for infiltration trenches)</td>
 
<td>Media (for infiltration trenches)</td>
<td>Media cost ($/cubic yard) X filter volume (cubic yard)</td>
+
<td>Media cost ($/cubic yard) * filter volume (cubic yard)</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Geotextile</td>
 
<td>Geotextile</td>
<td>Geotextile cost ($/cy) x area of trench, including walls</td>
+
<td>Geotextile cost ($/cy) * area of trench, including walls</td>
 
</tr>
 
</tr>
  
Line 67: Line 66:
 
<td rowspan=4>Site Restoration</td>
 
<td rowspan=4>Site Restoration</td>
 
<td>Soil preparation</td>
 
<td>Soil preparation</td>
<td>Topsoil or amendment cost ($/acre) x Area (acre)</td>
+
<td>Topsoil or amendment cost ($/acre) * Area (acre)</td>
 
<td rowspan=4>Tree protection, soil amendments, seed bed preparation, trails</td>
 
<td rowspan=4>Tree protection, soil amendments, seed bed preparation, trails</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Seeding</td>
 
<td>Seeding</td>
<td>Seeding Cost ($/acre) x Seeded Area (acre)</td>
+
<td>Seeding Cost ($/acre) * Seeded Area (acre)</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Filter strip</td>
 
<td>Filter strip</td>
<td>Sod cost ($/square foot) x filter strip area</td>
+
<td>Sod cost ($/square foot) * filter strip area</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Planting / transplanting</td>
 
<td>Planting / transplanting</td>
<td>Planting Cost ($/acre) x Planted Area (acre)</td>
+
<td>Planting Cost ($/acre) * Planted Area (acre)</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td rowspan=4>Annual Operation, Maintenance, and Inspection</td>
 
<td rowspan=4>Annual Operation, Maintenance, and Inspection</td>
 
<td>Sediment removal</td>
 
<td>Sediment removal</td>
<td>Removal Cost ($/acre) x Area (acre) x Frequency (1x / 5yr)</td>
+
<td>Removal Cost ($/acre) * Area (acre) * Frequency (1 time per 5 years)</td>
 
<td rowspan=4>Vegetation maintenance, cleaning of structures</td>
 
<td rowspan=4>Vegetation maintenance, cleaning of structures</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Debris removal</td>
 
<td>Debris removal</td>
<td>Removal Cost ($/acre) x Area (acre) x Frequency (2x / 1yr)</td>
+
<td>Removal Cost ($/acre) * Area (acre) * Frequency (2 time per year)</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Inspection</td>
 
<td>Inspection</td>
<td>Inspection Cost ($) x Inspection Frequency (6x / 1 yr)</td>
+
<td>Inspection Cost ($) * Inspection Frequency (6 times per year)</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Mowing (for some vegetative filters)</td>
 
<td>Mowing (for some vegetative filters)</td>
<td>Mowing Cost ($) x Mowing Frequency (6x / 1 yr)</td>
+
<td>Mowing Cost ($) * Mowing Frequency (6 times per year)</td>
 
</tr>
 
</tr>
 +
</table>
  
</table>
+
<noinclude>
[[category:table]]
+
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Costs, benefits]]
 +
</noinclude>

Latest revision as of 20:44, 3 August 2022

Summary of infiltration practices cost components.
Link to this table

Implementation Stage Primary Cost Components Basic Cost Estimate Other Considerations
Site Preparation Tree & plant protection Protection Cost ($/acre) * Affected Area (acre) Removal of existing structures, topsoil removal and stockpiling
Infiltration area protection Silt fence cost ($/’foot) * Perimeter of infiltration area
Clearing & grubbing Clearing Cost ($/acre) * Affected Area (acre)
Topsoil salvage Salvage Cost ($/acre) * Affected Area
Site Formation Excavation / grading X-ft Depth Excavation Cost ($/acre) * Area (acre) Soil & rock fill material, tunneling
Hauling material offsite Excavation Cost * (% of Material to be hauled away)
Structural Components Vault structure (for underground infiltration) ($/structure) Pipes, catchbasins, manholes, valves, vaults
Media (for infiltration trenches) Media cost ($/cubic yard) * filter volume (cubic yard)
Geotextile Geotextile cost ($/cy) * area of trench, including walls
inlet structure ($/structure)
Overflow structure ($/structure)
Observation well ($/structure)
Site Restoration Soil preparation Topsoil or amendment cost ($/acre) * Area (acre) Tree protection, soil amendments, seed bed preparation, trails
Seeding Seeding Cost ($/acre) * Seeded Area (acre)
Filter strip Sod cost ($/square foot) * filter strip area
Planting / transplanting Planting Cost ($/acre) * Planted Area (acre)
Annual Operation, Maintenance, and Inspection Sediment removal Removal Cost ($/acre) * Area (acre) * Frequency (1 time per 5 years) Vegetation maintenance, cleaning of structures
Debris removal Removal Cost ($/acre) * Area (acre) * Frequency (2 time per year)
Inspection Inspection Cost ($) * Inspection Frequency (6 times per year)
Mowing (for some vegetative filters) Mowing Cost ($) * Mowing Frequency (6 times per year)

This page was last edited on 3 August 2022, at 20:44.