m |
m |
||
(2 intermediate revisions by the same user not shown) | |||
Line 4: | Line 4: | ||
<table class="sortable"> | <table class="sortable"> | ||
<tr> | <tr> | ||
− | < | + | <th colspan=3>Project:</th> |
</tr> | </tr> | ||
<tr> | <tr> | ||
− | < | + | <th colspan=3>Location:</th> |
</tr> | </tr> | ||
<tr> | <tr> | ||
− | < | + | <th colspan=3>Site Status:</th> |
</tr> | </tr> | ||
<tr> | <tr> | ||
− | < | + | <th colspan=3>Date:</th> |
</tr> | </tr> | ||
<tr> | <tr> | ||
− | < | + | <th colspan=3>Time:</th> |
</tr> | </tr> | ||
<tr> | <tr> | ||
− | < | + | <th colspan=3>Inspector:</th> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<th>'''Construction sequence'''</th> | <th>'''Construction sequence'''</th> | ||
− | <th>Satisfactory / Unsatisfactory</th> | + | <th>'''Satisfactory / Unsatisfactory'''</th> |
− | <th>Comments</th> | + | <th>'''Comments'''</th> |
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 48: | Line 48: | ||
<tr> | <tr> | ||
<td>'''Final inspection'''</td> | <td>'''Final inspection'''</td> | ||
− | <td>Satisfactory / Unsatisfactory</td> | + | <td>'''Satisfactory / Unsatisfactory'''</td> |
− | <td>Comments</td> | + | <td>'''Comments'''</td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 64: | Line 64: | ||
<noinclude> | <noinclude> | ||
− | [[ | + | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Checklist]] |
</noinclude> | </noinclude> |
Check dam inspection checklist.
Link to this table
Project: | ||
---|---|---|
Location: | ||
Site Status: | ||
Date: | ||
Time: | ||
Inspector: | ||
Construction sequence | Satisfactory / Unsatisfactory | Comments |
Check dam material as per design specifications | ||
Check dam installation as per design specifications | ||
Dimensions per plan | ||
Spacing and grade per plan | ||
Final inspection | Satisfactory / Unsatisfactory | Comments |
Check dams operational | ||
Check dam structural integrity – shape, anchoring |