m (2023) |
|||
(5 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | |||
− | |||
==SECTION 20 SWPPP AVAILABILITY== | ==SECTION 20 SWPPP AVAILABILITY== | ||
===20.1=== | ===20.1=== | ||
− | <big> | + | <big>[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.33 SWPPP] Availability.</big> |
===20.2=== | ===20.2=== | ||
− | <big>Permittees must keep the SWPPP, | + | <big>[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions#25.23 Permittees] must keep the SWPPP, on- site, or electronically available on-site, during normal working hours with personnel who have operational control over the applicable portion of the site, including all changes to the SWPPP, inspections, and maintenance records.</big> |
+ | |||
+ | <noinclude> | ||
+ | [[Category:Level 2 - Regulatory/Construction (CSW)]] | ||
+ | </noinclude> |
SWPPP Availability.
Permittees must keep the SWPPP, on- site, or electronically available on-site, during normal working hours with personnel who have operational control over the applicable portion of the site, including all changes to the SWPPP, inspections, and maintenance records.
This page was last edited on 8 August 2023, at 15:01.