m |
|||
(4 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
<font size=3>'''Expected performance for temporary/permanent sediment traps and basins'''.</font size><br> | <font size=3>'''Expected performance for temporary/permanent sediment traps and basins'''.</font size><br> | ||
− | Link to this [[Expected performance for temporary/permanent sediment traps and basins |table]] | + | Link to this [[Expected performance for temporary/permanent sediment traps and basins|table]] |
<table class="sortable"> | <table class="sortable"> | ||
Line 17: | Line 17: | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
− | <th colspan=2> | + | <th colspan=2>Water quality</th> |
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 56: | Line 56: | ||
</table> | </table> | ||
− | [[ | + | <noinclude> |
+ | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Sediment control]] | ||
+ | </noinclude> |
Expected performance for temporary/permanent sediment traps and basins.
Link to this table
Water quantity | |
---|---|
Flow attenuation | Secondary design benefit |
Runoff volume reduction | Secondary design benefit |
Water quality | |
Erosion prevention | Little or no design benefit |
Sediment control | Primary design benefit |
Nutrient loading | Secondary design benefit |
Pollutant removal | |
Total suspended solids | Primary design benefit |
Total phosphorus | Secondary design benefit |
Heavy metals | Secondary design benefit |
Floatables | Secondary design benefit |
Oil and grease | Secondary design benefit |
This page was last edited on 26 July 2022, at 13:23.