The Construction Stormwater Permit requires a higher level of engineering review for proposed infiltration projects in areas overlying an Emergency Response Area (ERA) where the vulnerability of the DWSMA (Drinking Water Supply Management Area) is classified as moderate, or in areas outside the ERA where the vulnerability of the DWSMA (Drinking Water Supply Management Area) is classified as high or very high. This page provide guidance and recommendations for conducting a higher level of engineering review. | The Construction Stormwater Permit requires a higher level of engineering review for proposed infiltration projects in areas overlying an Emergency Response Area (ERA) where the vulnerability of the DWSMA (Drinking Water Supply Management Area) is classified as moderate, or in areas outside the ERA where the vulnerability of the DWSMA (Drinking Water Supply Management Area) is classified as high or very high. This page provide guidance and recommendations for conducting a higher level of engineering review. | ||
Line 75: | Line 77: | ||
==Information gathered from engineering reviews== | ==Information gathered from engineering reviews== | ||
The types of detailed geological investigations suggested under Condition 1 above could be very beneficial to public water suppliers and the Minnesota Department of Health (MDH) when it comes time to re-assess the vulnerability of the ERA and DWSMA during wellhead protection plan amendment, which occurs every 10-years. If you conduct a higher engineering review, please consider submitting the data and/or reports associated with such investigations to MDH or MPCA. Similarly, if you complete a well-receptor survey under Condition 2 above, please consider providing this information to MDH or MPCA. All wellhead protection plans include an assessment of wells within the DWSMA, and any receptor survey results could be beneficial towards those efforts. | The types of detailed geological investigations suggested under Condition 1 above could be very beneficial to public water suppliers and the Minnesota Department of Health (MDH) when it comes time to re-assess the vulnerability of the ERA and DWSMA during wellhead protection plan amendment, which occurs every 10-years. If you conduct a higher engineering review, please consider submitting the data and/or reports associated with such investigations to MDH or MPCA. Similarly, if you complete a well-receptor survey under Condition 2 above, please consider providing this information to MDH or MPCA. All wellhead protection plans include an assessment of wells within the DWSMA, and any receptor survey results could be beneficial towards those efforts. | ||
− | |||
− | |||
==Examples== | ==Examples== | ||
Line 350: | Line 350: | ||
*Seaberg, John. 2000. Overview of the Twin Cities Metropolitan Groundwater Model. | *Seaberg, John. 2000. Overview of the Twin Cities Metropolitan Groundwater Model. | ||
*Stark, J.R., and M.F. Hult. 1985. Ground-water Flow in the Prairie du Chien-Jordan Aquifer Related to Contamination by Coal-Tar Derivatives, St. Louis Park, Minnesota. Water-Resources Investigations Report 85-4087. | *Stark, J.R., and M.F. Hult. 1985. Ground-water Flow in the Prairie du Chien-Jordan Aquifer Related to Contamination by Coal-Tar Derivatives, St. Louis Park, Minnesota. Water-Resources Investigations Report 85-4087. | ||
+ | |||
+ | [[Category:Level 2 - Technical and specific topic information/infiltration]] |
The Construction Stormwater Permit requires a higher level of engineering review for proposed infiltration projects in areas overlying an Emergency Response Area (ERA) where the vulnerability of the DWSMA (Drinking Water Supply Management Area) is classified as moderate, or in areas outside the ERA where the vulnerability of the DWSMA (Drinking Water Supply Management Area) is classified as high or very high. This page provide guidance and recommendations for conducting a higher level of engineering review.
The figure at the right illustrates protection designations used to manage public water supply wells that have wellhead protection plans.
A public water supply well is vulnerable if:
Five classes of vulnerability exist: very low, low, moderate, high, and very high. Within high and very high vulnerability designations, contaminants at the land surface have the potential to move quickly to the underlying aquifer.
There are two conditions in which infiltration is prohibited under the Construction Stormwater General Permit unless a higher level of engineering review is conducted and demonstrates that a functioning treatment system will prevent adverse impacts to groundwater.
Vulnerability assessments for wellhead protection are based on data that was existing at the time of plan development, and are often reliant on stratigraphic information from construction logs for wells and borings constructed for purposes other than characterizing the nature and continuity of confining units. Therefore they should be viewed as a best estimate at the time of plan development, and subject to change during future plan amendments depending on the availability of newer or higher quality data.
In the first condition above, a contaminant will potentially be transported to an underlying aquifer within a moderate time frame (e.g. one year to a decade). The concern is that contaminants reaching an aquifer within the ERA can be transported to a public supply well within a short time (less than one year). It is therefore important to collect additional information about the geologic materials overlying the aquifer or ensure a minimal risk of contaminant exposure in these settings.
In the second condition above, outside of the ERA, the wells most likely to be impacted by infiltration practices are those also completed in the highly vulnerable aquifer and situated within one-year time of travel of the infiltration site. Determinations of ERA are based on sound geologic analysis and modeling, but other receptors beyond the public water supply well are not considered. Thus, private wells in these settings are at risk. Engineering review in this situation entails either conducting more detailed geologic analysis or modeling or conducting a well receptor survey.
Note that aquifer vulnerability for a DWSMA considers only the aquifer in which public water supply wells are located. The vulnerability designation for private wells completed in other aquifers must be determined on a case by case basis. For example, in the schematic to the right, the public supply well is located in an aquifer designated as having low vulnerability. Private wells completed in the same aquifer as the public supply wells have the same aquifer vulnerability designation as the DWSMA for the public well. The private well completed in the shallow aquifer above the confining unit is likely to have very high vulnerability.
Since the CSW permit focuses only on DWSMAs and on the vulnerability designation for DWSMAs, many private wells located in aquifers other than the aquifer for the DWSMA, or private wells located outside of DWSMAs may be at risk from an infiltration practice. It is Highly recommended that receptor surveys be completed for any infiltration practice, including those outside a DWSMA and that engineering reviews be conducted when private wells are likely to be located within a year travel time of the infiltration practice. See the following section for guidance.
The two conditions requiring higher levels of engineering review differ and therefore have different recommendations.
1. Condition 1: Moderate vulnerability overlying an ERA. Because there is a high degree of certainty regarding the boundaries of the ERA, the purpose of the engineering review in this case is to conduct a detailed geologic analysis or provide reasonable assurances that risk of contaminant exposure is limited.
If borings are not utilized, other sources of information may be used, but these should be used with caution. Examples include multiple well boring logs that show similar driller interpretation, or hydrogeologic assessments or studies conducted by professional organizations, such as the United States Geological Survey or Minnesota Pollution Control Agency.
An alternative approach to ensuring protection of a public water supply well is to ensure a minimum risk of contaminants exposure. This includes the following recommendations.
2. Condition 2: High and very high vulnerability outside an ERA. While a geologic assessment can be used in this situation, it is not necessary. If a geologic assessment is conducted, the goal would be to ensure there is sufficient protective material to retard contaminants before reaching the aquifer. The recommendations for conducting a geologic analysis described for condition 1 above can be used.
The primary concern for this condition, however, is to identify or protect other receptors, which typically will be private well owners. This can be achieved by limiting the risk of contaminant exposure, as described above for condition 1. A second option is to conduct a receptor survey. This is a two step process.
Note that these recommendations are relatively conservative and professional geoscientists or engineers may utilize other methods, including modeling.
The types of detailed geological investigations suggested under Condition 1 above could be very beneficial to public water suppliers and the Minnesota Department of Health (MDH) when it comes time to re-assess the vulnerability of the ERA and DWSMA during wellhead protection plan amendment, which occurs every 10-years. If you conduct a higher engineering review, please consider submitting the data and/or reports associated with such investigations to MDH or MPCA. Similarly, if you complete a well-receptor survey under Condition 2 above, please consider providing this information to MDH or MPCA. All wellhead protection plans include an assessment of wells within the DWSMA, and any receptor survey results could be beneficial towards those efforts.
The following examples represent hypothetical situations. The analysis and recommendations are based on professional judgement by MPCA staff. It is highly recommended that licensed geologists or engineers perform these analyses.
In general, a higher level of engineering review should include the following:
Depending on site conditions, additional considerations include the following:
Typical sources of information include the following.
An infiltration basin is proposed for a site undergoing redevelopment. The site, located in Cottage Grove, Minnesota, is approximately 55 acres in size and consists of 100 percent impermeable surfaces. The entire site is within a Drinking Water Source Management Area (DWSMA), outside of an Emergency Response Area. and within an area of the DWSMA classified as having high vulnerability. The redevelopment project requires a Construction Stormwater Permit. Infiltration at the site requires a higher level of engineering review to comply with the permit.
The engineering review consists of the following steps.
1. Identify the aquifer(s) of concern: To make this determination, we used the County Well Index to identify wells and well logs from nearby wells, the 2016 Washington County Geologic Atlas (Part A, Plate 2, Bedrock geology), and the 1990 Washington County Geologic Atlas (Plate 5, Hydrogeology). A water table aquifer is not utilized for drinking water supply, likely because the aquifer is thin or discontinuous and, where present, highly vulnerable to contamination. The uppermost bedrock unit is the Prairie du Chien formation, which is used for drinking water supply.
2. Determine the direction of groundwater flow in the aquifer of concern: We used the 2016 Washington County Geologic Atlas (Part A, Plate 2, Bedrock geology). Groundwater flow in the Prairie du Chien aquifer is to the southwest.
3. Identify wells down-gradient and side-gradient of the site and determine the distance to each well. There are relatively few wells used in the determination of groundwater flow within the aquifer. We therefore expanded the well search to include side-gradient wells. The following table summarizes distances to the closest wells. Note that a public supply well located in an ERA is the closest drinking water well. The SW corner of the site, which is closest to the ERA, is 0.13 miles from the ERA. The NE corner of the site is 0.50 miles from the ERA.
Well | Closest distance (miles) | Furthest distance (miles) | Direction |
---|---|---|---|
826033 | 0.82 | 1.19 | Down-gradient |
131970 | 0.51 | 0.88 | Side-gradient W-NW |
257609 | 0.70 | 1.07 | Side-gradient S-SE |
Emergency Response Area | 0.13 | 0.50 | Down-gradient |
4. Estimate travel time to the nearest receptor. The public supply well associated with the ERA is the nearest receptor. The travel time can be calculated using literature values, through modeling, or by using Darcy’s equation. The travel time is the distance to the nearest receptor divided by the average linear velocity in the horizontal direction. The average linear velocity is the hydraulic conductivity of the aquifer material (k), times the hydraulic gradient (i), divided by the effective porosity (f) of the aquifer material (ki/f).
Utilizing these values, the estimated one-year travel time is 605 feet or 0.115 miles.
5. The hydrogeology and land use at the site warrant further investigation. Well logs indicate the surficial material consists of coarse sand and gravel, ranging in thickness from 35 to 85 feet. Both the surficial and Prairie du Chien aquifers are highly vulnerable to groundwater contamination and the Prairie du Chien likely has fractured flow. Land use at the site consists of industry and transportation, with major highways and railways near the site. These warrant a site screening assessment. If the screening assessment indicates no concerns with contamination, infiltration is appropriate with the following considerations.
Conclusion: Considering this analysis and answers to the above questions, the figure to the right illustrates acceptable infiltration areas. This area is approximately 4 to 5 years travel time from the ERA and provides some buffering from adjacent transportation areas.
An infiltration basin is proposed for a highway reconstruction project in Edina, Minnesota. The infiltration basin must be built within highway right-of-way and is thus constrained to four potential locations within a highway interchange. All four locations are within an Emergency Response Area, and within an area of the Drinking Water Source Management Area (DWSMA), classified as having moderate vulnerability. The project requires a Construction Stormwater Permit. Infiltration at the site requires a higher level of engineering review to comply with the permit.
The engineering review consists of the following steps.
1. Identify the aquifer(s) of concern: To make this determination, we used the County Well Index to identify wells and well logs from nearby wells, the Hennepin County Geologic Atlas (Plates 2 through 7), and the City of Edina's Wellhead Protection Plan (Part 1). Several wells from the County Well Index are completed in the surficial aquifer. Two Edina municipal wells and some private wells are completed in the Prairie du Chien-Jordan aquifer.
2. Determine the direction of groundwater flow in the aquifer of concern: We used the 1989 Hennepin County Geologic Atlas (Plates 5 and 6) and the City of Edina's Wellhead Protection Plan (Part 1). Groundwater flow in the surficial and bedrock aquifers is to the southeast.
3. Identify wells down-gradient and side-gradient of the site and determine the distance to each well. There are relatively few wells used in the determination of groundwater flow within the aquifer. We therefore expanded the well search to include side-gradient wells. This encompasses City Well 4, which is directly east of the proposed infiltration area.
City Well | Aquifer | Casing/well depth (ft) | Static water level (ft below ground surface) |
---|---|---|---|
4 | Prairie du Chien-Jordan | 266/500 | 80 |
6 | Jordan | 316/503 | 90 |
Well ID | Depth (feet) | Aquifer | Direction from infiltration basin | Distance from infiltration basin (feet) |
---|---|---|---|---|
200563 | 88 | Quaternary (surficial) | East | 2040 |
200562 | 98 | St. Peter | East | 1400 |
224343 | 410 | Prairie du Chien | East | 630 |
200565 | 115 | Quaternary (surficial) | South-southeast | 1580 |
200566 | 308 | Prairie du Chien | South-southeast | 1730 |
200567 | 95 | Quaternary (surficial) | South-southeast | 1740 |
City Well 4 | 503 | Prairie du Chien - Jordan | East | 1150 |
4. Determine the likelihood contaminants will reach the surficial or bedrock aquifers. Using the sensitivity maps from the 1989 Hennepin County Atlas, both the surficial (Quaternary) and Prairie du Chien aquifers have low vulnerability to contamination, although there are small areas of the Prairie du Chien mapped as moderate near the proposed infiltration basin(s). The low vulnerability is attributed to overlying glacial deposits, which are described as loamy till, and for the Prairie du Chien, the presence of the St. Peter bedrock, which is considered a confining later. The City of Edina's Wellhead Protection Plan lists City Well 4 as vulnerable based on the presence of nitrates in sampling.
5. Determine aquifer time of travel to nearby wells. City Well 4 is within the ERA and therefore considered to be within a one-year time of travel. Using information from Edina's Wellhead Protection Plan (hydraulic conductivity, hydraulic gradient, and porosity), times of travel for the city well fields in the Prairie du Chien aquifer range from 124 to 7050 feet per year. For the ERA encompassing City Well 4, the time of travel is estimated at 2650 feet per year. The proposed infiltration basin is approximately 1150 feet from City well 4. Data for the surficial aquifer are lacking and travel times must be estimated based on typical values for the geologic material comprising the aquifer. Assuming a coarse sand or gravelly sand aquifer, based on stratigraphic information in well logs, the following table provides a range of travel time estimates.
Scenario | Conductivity (ft/year) | Gradient (ft/ft) | porosity | Estimated travel time (ft/year) |
---|---|---|---|---|
Low conductivity | 3150 | 0.00217 | 0.3 | 23 |
Mid range conductivity | 31500 | 0.00217 | 0.3 | 230 |
High conductivity | 315000 | 0.00217 | 0.3 | 2275 |
Wells within the surficial aquifer are 1500 to 2000 feet from the proposed infiltration basin.
Based on the information above, there are some potential concerns with infiltration at this site, including the following.
These concerns warrant further investigation, including the following.
If further investigation indicates infiltration is appropriate, consider the following.
Conclusion: Additional investigation, described above, is warranted for this site.
An infiltration basin is proposed for a parking lot reconstruction project in Morris, Minnesota. The impervious area is approximately 5 acres. The site is within a Drinking Water Source Management Area (DWSMA) but outside the Emergency Response Area. Aquifer vulnerability is mapped as very high. The project requires a Construction Stormwater Permit. Infiltration at the site requires a higher level of engineering review to comply with the permit.
The engineering review consists of the following steps.
1. Identify the aquifer(s) of concern: To make this determination, we used the County Well Index (CWI) to identify wells and well logs from nearby wells, and the Morris Source Water Assessment. Five City wells are completed in Quaternary deposits and range in depth from 58 to 78 feet. Private wells in the vicinity are completed in the same geologic deposits and have similar depths.
2. Determine the direction of groundwater flow in the aquifer of concern: Static water elevations from well logs in CWI, plotted in the image to the right, indicate no discernible pattern to groundwater flow. The elevation of the Pomme de Terre River, located just east of the proposed infiltration area, is approximately 1080 feet above sea level. There are several irrigation wells in the area that may impact water elevations. City wells, located south of the proposed infiltration, may also influence flow. Finally, well logs indicate alternating layers of sand/gravel and clay/till, suggesting there may be multiple hydraulic units. Without more detailed analysis and more precise measurements of static water elevations, groundwater flow direction cannot be positively determined.
3. Identify the distance from the infiltration area to nearby wells. Because flow direction is uncertain, we must consider all nearby wells. There are several wells near the proposed practice. Some of these are summarized in the table below.
Well ID | Depth (feet) | Aquifer | Direction from infiltration basin | Distance from infiltration basin (closest and furthest, in feet) |
---|---|---|---|---|
530879 | 78 | Quaternary (buried) | Southwest | 675 - 1625 |
117441 | 62 | Quaternary (buried) | West | 1000 - 1900 |
689691 | 80 | Quaternary (buried) | Northwest | 630 - 1000 |
601722 | 65 | Quaternary (buried) | North | 315 - 1275 |
589046 | 110 | Quaternary (buried) | East | 2275 - 2900 |
464752 | 95 | Quaternary (buried) | Southeast | 2600 - 3500 |
4. Determine the likelihood contaminants will reach the surficial or bedrock aquifers. Only two wells in CWI are within the area delineated as being highly vulnerable, and these wells are 3500 feet or more from the proposed infiltration practice. Both well logs show alternating layers of sand, gravel, and clay. Cumulative thickness of clay material in both logs exceeds 25 feet. Clay color is noted as blue, indicating reducing conditions. City wells have consistently tested negative for nitrate, while several wells in the area have high concentrations of arsenic [1][2]. These results suggest water in sampled wells is likely not vulnerable to contamination.
5. Determine aquifer time of travel to nearby wells. Data for calculating travel time is lacking. In particular, the hydraulic gradient is difficult to determine based on data. If we assume a coarse sand or gravelly sand aquifer and utilize inputs from Example 2 above, the following table provides a range of travel time estimates.
Scenario | Conductivity (ft/year) | Gradient (ft/ft) | porosity | Estimated travel time (ft/year) |
---|---|---|---|---|
Low conductivity | 3150 | 0.00217 | 0.3 | 23 |
Mid range conductivity | 31500 | 0.00217 | 0.3 | 230 |
High conductivity | 315000 | 0.00217 | 0.3 | 2275 |
Several wells within the Quaternary aquifer are within 1000 feet of the proposed infiltration. An infiltration practice cannot be constructed to be more than 1000 feet from the nearest domestic well.
The primary concern at the site is the lack of hydrogeologic information. Available well logs suggest there are confining layers of clay. However, the closest wells are likely within one year travel time of any proposed infiltration practice.
Conclusion: Additional investigation is recommended if infiltration is pursued at this site. Additional investigation includes the following options.
If further investigation indicates infiltration is appropriate, consider the following.