m
m
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
'''This table shows Cost components for stormwater ponds'''<br>
+
<font size=3>'''This table shows Cost components for stormwater ponds'''</font size><br>
 
(Link to this [[Cost components for stormwater ponds|table]])
 
(Link to this [[Cost components for stormwater ponds|table]])
  
Line 15: Line 15:
 
<td rowspan=3>Removal of existing structures, topsoil removal and stockpiling</td>
 
<td rowspan=3>Removal of existing structures, topsoil removal and stockpiling</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Topsoil salvage</td>
 
<td>Topsoil salvage</td>
Line 30: Line 29:
 
<td rowspan=2>Soil & rock fill material, tunneling</td>
 
<td rowspan=2>Soil & rock fill material, tunneling</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Hauling material offsite</td>
 
<td>Hauling material offsite</td>
 
<td>Excavation Cost x (% of Material to be hauled away)</td>
 
<td>Excavation Cost x (% of Material to be hauled away)</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td rowspan=2>Structural Components</td>
 
<td rowspan=2>Structural Components</td>
Line 79: Line 76:
 
<td>Mowing Cost ($) x Mowing Frequency (4 / 1 yr)</td>
 
<td>Mowing Cost ($) x Mowing Frequency (4 / 1 yr)</td>
 
</tr>
 
</tr>
 
 
</table>
 
</table>
  
 
+
<noinclude>
 
+
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Costs, benefits]]
[[category:table]]
+
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Ponds and wetlands (constructed)]]
 +
</noinclude>

Latest revision as of 20:35, 3 August 2022

This table shows Cost components for stormwater ponds
(Link to this table)

Implementation Stage Primary Cost Components Basic Cost Estimate Other Considerations
Site Preparation Tree & plant protection Protection Cost ($/acre) x Affected Area (acre) Removal of existing structures, topsoil removal and stockpiling
Topsoil salvage Salvage cost ($/acre) x Affected Area (acre)
Clearing & grubbing Clearing Cost ($/acre) x Affected Area (acre)
Site Formation Excavation / grading 8-ft Depth Excavation Cost ($/acre) x Area (acre) Soil & rock fill material, tunneling
Hauling material offsite Excavation Cost x (% of Material to be hauled away)
Structural Components Inlet structure ($/structure) Pipes, catchbasins, manholes, valves
Outlet structure ($/structure)
Site Restoration Seeding or sodding Seeding Cost ($/acre) x Seeded Area (acre) Tree protection, soil amendments, seed bed preparation, trails
Planting / transplanting Planting Cost ($/acre) x Planted Area (acre)
Annual Operation, Maintenance, and Inspection Debris removal Removal Cost ($/acre) x Area (acre) x Frequency (2 / 1yr) Vegetation maintenance, cleaning of structures
Sediment removal Removal Cost ($/acre) x Area (acre) x Frequency (1 / 5yr)
Gate / valve operation Operation Cost ($) x Operation Frequency (2 / 1 yr)
Inspection Inspection Cost ($) x Inspection Frequency (2 / 1 yr)
Mowing Mowing Cost ($) x Mowing Frequency (4 / 1 yr)

This page was last edited on 3 August 2022, at 20:35.