(Created page with "<font size=3>'''MIDS Calculator BMP summary'''</font size><br> Link to this table <table class="sortable"> <tr> <th>BMP type<sup>1</sup></th>...") |
m |
||
(One intermediate revision by the same user not shown) | |||
Line 110: | Line 110: | ||
<td>Harvest and Re-Use Cistern</td> | <td>Harvest and Re-Use Cistern</td> | ||
<td>Yes</td> | <td>Yes</td> | ||
− | <td>Calculated</td> | + | <td>Calculated<sup>3</sup></td> |
<td></td> | <td></td> | ||
<td></td> | <td></td> | ||
Line 181: | Line 181: | ||
<sup>3</sup> “Calculated" indicates volume reduction is calculated based on user inputs for cistern reuse / irrigation scheduling.<br> | <sup>3</sup> “Calculated" indicates volume reduction is calculated based on user inputs for cistern reuse / irrigation scheduling.<br> | ||
<sup>4</sup> TPP and TPD reduction variable based on design input parameters.</font size> | <sup>4</sup> TPP and TPD reduction variable based on design input parameters.</font size> | ||
+ | |||
+ | <noinclude> | ||
+ | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Models, modeling, model applications and examples]] | ||
+ | </noinclude> |
MIDS Calculator BMP summary
Link to this table
BMP type1 | Requires input dimensions? | Volume reduction (%) | TSS reduction (%) | Total particulate phosphorus (TPP) reduction (%) | Total dissolved phosphorus (TDP) reduction |
---|---|---|---|---|---|
Green roof | Yes | 45 | 96 | 0 | 0 |
Bioretention Basin (w/o underdrain) | Yes | Lookup table2 | |||
Bioretention Basin (w/ underdrain) | Yes | Lookup table2 | 60 | 0-804 | 0-604 |
Infiltration basin/ Infiltration Trench | Yes | Lookup table2 | |||
Underground Infiltration | Yes | Lookup table2 | |||
Permeable pavement | Yes | Lookup table2 | 74 | 82 | 0 |
Tree Trench (w/o underdrain) | Yes | Lookup table2 | |||
Tree Trench (w/ underdrain) | Yes | Lookup table2 | 68 | 0-804 | 0-604 |
Swale Side Slope | Yes | Lookup table2 | |||
Swale Main Channel (w/o underdrain) | Yes | Lookup table2 | 68 | 73 | 0 |
Swale Main Channel (w/underdrain) | Yes | Lookup table2 | |||
Wet swale | No | 68 | 0-454 | 0-604 | |
Harvest and Re-Use Cistern | Yes | Calculated3 | |||
Imperviousness Disconnection | Yes | Lookup table2 | 68 | 0 | 0 |
Sand Filter (Not-Enhanced) | No | 85 | 85 | 0 | |
Sand Filter (Enhanced) | No | 85 | 85 | 40 | |
Constructed Wetland | No | 68 | 55 | 0 | |
Stormwater Pond (Level 1) | No | 60 | 62 | 0 | |
Stormwater Pond (Level 2) | No | 84 | 84 | 8 | |
Stormwater Pond (Level 3) | No | 90 | 90 | 23 | |
Other | No | User-defined |
1Based on Version 3.0 of the MIDS Calculator
2 "Lookup Table" indicates removal calculated from MIDS P8 modeling lookup tables.
3 “Calculated" indicates volume reduction is calculated based on user inputs for cistern reuse / irrigation scheduling.
4 TPP and TPD reduction variable based on design input parameters.
This page was last edited on 4 August 2022, at 14:43.