m
m
 
(3 intermediate revisions by the same user not shown)
Line 23: Line 23:
 
<td colspan=4> </td>
 
<td colspan=4> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<th>Description</th>
 
<th>Description</th>
Line 31: Line 30:
 
<th>Total Estimated Price</th>
 
<th>Total Estimated Price</th>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<th colspan=5>'''Site Preparation'''</th>
 
<th colspan=5>'''Site Preparation'''</th>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Tree removal - up to 12" diameter</td>
 
<td>Tree removal - up to 12" diameter</td>
Line 64: Line 61:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 
 
 
<tr>
 
<tr>
 
<th colspan=5>'''Site Formation'''</th>
 
<th colspan=5>'''Site Formation'''</th>
Line 100: Line 95:
 
<th colspan=5>'''Structural Components'''</th>
 
<th colspan=5>'''Structural Components'''</th>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Inlet structure</td>
 
<td>Inlet structure</td>
Line 115: Line 109:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<th colspan=5>'''Site Restoration'''</th>
 
<th colspan=5>'''Site Restoration'''</th>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Sod - above vegetative bench</td>
 
<td>Sod - above vegetative bench</td>
Line 127: Line 119:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Soil preparation</td>
 
<td>Soil preparation</td>
Line 149: Line 140:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td colspan=4>Subtotal</td>
 
<td colspan=4>Subtotal</td>
Line 166: Line 156:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td colspan=4>TAL CONSTRUCTION COST</td>
 
<td colspan=4>TAL CONSTRUCTION COST</td>
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<th colspan=5>Annual Operation and Maintenance</th>
 
<th colspan=5>Annual Operation and Maintenance</th>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Debris removal</td>
 
<td>Debris removal</td>
Line 197: Line 184:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Repair erosion</td>
 
<td>Repair erosion</td>
Line 205: Line 191:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Sediment removal and disposal</td>
 
<td>Sediment removal and disposal</td>
Line 213: Line 198:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Mow</td>
 
<td>Mow</td>
Line 221: Line 205:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Gate / valve operation</td>
 
<td>Gate / valve operation</td>
Line 229: Line 212:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Inspection</td>
 
<td>Inspection</td>
Line 237: Line 219:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td colspan=4>Subtotal</td>
 
<td colspan=4>Subtotal</td>
Line 246: Line 227:
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td colspan=4>TOTAL ANNUAL O&M COST</td>
 
<td colspan=4>TOTAL ANNUAL O&M COST</td>
 
<td>$0.00</td>
 
<td>$0.00</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td colspan=5>'''Minnesota Location Factors'''</td>
 
<td colspan=5>'''Minnesota Location Factors'''</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td colspan=2>Bemidji</td>
 
<td colspan=2>Bemidji</td>
 
<td colspan=3>0.963</td>
 
<td colspan=3>0.963</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td colspan=2>Brainerd</td>
 
<td colspan=2>Brainerd</td>
 
<td colspan=3>1.003</td>
 
<td colspan=3>1.003</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td colspan=2>Detroit Lakes</td>
 
<td colspan=2>Detroit Lakes</td>
 
<td colspan=3>0.962</td>
 
<td colspan=3>0.962</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td colspan=2>Duluth</td>
 
<td colspan=2>Duluth</td>
 
<td colspan=3>0.991</td>
 
<td colspan=3>0.991</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td colspan=2>Mankato</td>
 
<td colspan=2>Mankato</td>
 
<td colspan=3>0.990</td>
 
<td colspan=3>0.990</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td colspan=2>Bemidji</td>
 
<td colspan=2>Bemidji</td>
 
<td colspan=3>0.963</td>
 
<td colspan=3>0.963</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td colspan=2>Minneapolis</td>
 
<td colspan=2>Minneapolis</td>
 
<td colspan=3>1.035</td>
 
<td colspan=3>1.035</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td colspan=2>Rochester</td>
 
<td colspan=2>Rochester</td>
 
<td colspan=3>0.983</td>
 
<td colspan=3>0.983</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td colspan=2>St. Paul</td>
 
<td colspan=2>St. Paul</td>
 
<td colspan=3>1.000</td>
 
<td colspan=3>1.000</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td colspan=2>St. Cloud</td>
 
<td colspan=2>St. Cloud</td>
 
<td colspan=3>1.002</td>
 
<td colspan=3>1.002</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td colspan=2>Thief River Falls</td>
 
<td colspan=2>Thief River Falls</td>
 
<td colspan=3>1.042</td>
 
<td colspan=3>1.042</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td colspan=2>Willmar</td>
 
<td colspan=2>Willmar</td>
 
<td colspan=3>0.961</td>
 
<td colspan=3>0.961</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td colspan=2>Windom</td>
 
<td colspan=2>Windom</td>
 
<td colspan=3>0.935</td>
 
<td colspan=3>0.935</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
</tr>
 
</tr>
 
</table>
 
</table>
 +
<font size=1p>Note: Suggested unit costs are based on RS Means prices for Spring, 2005, then factored into an area basis based on typical design features for Constructed Wetlands BMPs. To be used for preliminary cost estimation</font size>
  
<p>Note: Suggested unit costs are based on RS Means prices for Spring, 2005, then factored into an area basis based on typical design features for Constructed Wetlands BMPs. To be used for preliminary cost estimation</p>
+
<noinclude>
 
+
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Costs, benefits]]
[[category:table]]
+
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Ponds and wetlands (constructed)‏‎]]
 +
</noinclude>

Latest revision as of 20:44, 3 August 2022

Stormwater wetland cost estimate worksheet.
Link to this table

Project Title
Owner
Location
Project Number
Date
Description Units Quantity Unit Cost Total Estimated Price
Site Preparation
Tree removal - up to 12" diameter each $350.00 $0.00
Clear and grub brush square yard $1.50 $0.00
Tree protection - temp. fence lineal foot $3.00 $0.00
Topsoil - 6" depth, salvage on site square yard $4.50 $0.00
Site Formation
Excavation - deepwater zone - 4' average depth square yard $5.00 $0.00
Excavation - marsh zone - 1' average depth square yard $1.00 $0.00
Grading square yard $1.50 $0.00
Hauling off-site - 5' depth square yard $5.00 $0.00
Structural Components
Inlet structure each $2,000.00 $0.00
Outlet structure each $3,500.00 $0.00
Site Restoration
Sod - above vegetative bench square yard $4.50 $0.00
Soil preparation square yard $25.00 $0.00
Seeding - vegetative bench square yard $0.50 $0.00
Planting square yard $30.00 $0.00
Subtotal $0.00
10% Contingencies $0.00
Subtotal $0.00
Apply MN Location Factor $0.00
TAL CONSTRUCTION COST $0.00
Annual Operation and Maintenance
Debris removal per visit $100.00 $0.00
Remove invasive plants per visit $500.00 $0.00
Replant wetland vegetation per plant $10.00 $0.00
Repair erosion square yard $75.00 $0.00
Sediment removal and disposal cubic yard $10.00 $0.00
Mow per visit $150.00 $0.00
Gate / valve operation per visit $125.00 $0.00
Inspection per visit $125.00 $0.00
Subtotal $0.00
Apply MN Location Factor $0.00
TOTAL ANNUAL O&M COST $0.00
Minnesota Location Factors
Bemidji 0.963
Brainerd 1.003
Detroit Lakes 0.962
Duluth 0.991
Mankato 0.990
Bemidji 0.963
Minneapolis 1.035
Rochester 0.983
St. Paul 1.000
St. Cloud 1.002
Thief River Falls 1.042
Willmar 0.961
Windom 0.935

Note: Suggested unit costs are based on RS Means prices for Spring, 2005, then factored into an area basis based on typical design features for Constructed Wetlands BMPs. To be used for preliminary cost estimation

This page was last edited on 3 August 2022, at 20:44.