==Appendix B. Schedules== | ==Appendix B. Schedules== | ||
− | |||
===<span style="color: black">'''Table 2:<br/>Existing Permittees - Schedule of permit requirements'''=== | ===<span style="color: black">'''Table 2:<br/>Existing Permittees - Schedule of permit requirements'''=== | ||
− | |||
{| class="wikitable" style = "background: transparent;" | {| class="wikitable" style = "background: transparent;" | ||
|- | |- | ||
− | ! style="text-align: left; background: transparent;"|'''<i>Permit requirement</i> | + | !style="text-align: left; background: transparent;"|'''<i>Permit requirement</i> !!style="text-align: left; background: transparent;"|'''<i>Schedule</i> |
|- | |- | ||
− | | '''Section 12. Stormwater Pollution Prevention Program (SWPPP)<br/>Document''' | + | | '''Section 12. Stormwater Pollution Prevention Program (SWPPP)<br/>Document.''' |
− | *<i>Submit the SWPPP Document completed in accordance | + | *<i>Submit the SWPPP Document completed in accordance with<br/>Section 12 |
− | | | + | | |
*Within 150 days after General Permit issuance<br/>date. | *Within 150 days after General Permit issuance<br/>date. | ||
|- | |- | ||
− | | '''Section 13. Stormwater Pollution Prevention Program (SWPPP)''' | + | |'''Section 13. Stormwater Pollution Prevention Program (SWPPP)''' |
− | *<i>Complete revisions to incorporate the new requirements of<br/>Sections 14 - 23 into current SWPPP. | + | *<i>Complete revisions to incorporate the new requirements of<br/>Sections 14 - 23 into current SWPPP. |
| | | | ||
*Within 12 months of the date General Permit<br/>coverage is extended, unless other timelines have<br/>been specifically established in the General Permit<br/>and identified below. | *Within 12 months of the date General Permit<br/>coverage is extended, unless other timelines have<br/>been specifically established in the General Permit<br/>and identified below. | ||
|- | |- | ||
− | |'''Section 19. Construction Site Stormwater Runoff Control''' | + | |'''Section 19. Construction Site Stormwater Runoff Control''' |
− | *<i>Complete revisions to Construction Site Stormwater Runoff<br/>Control program, including revisions to regulatory mechanism(s),<br/>if necessary | + | *<i>Complete revisions to Construction Site Stormwater Runoff<br/>Control program, including revisions to regulatory mechanism(s),<br/>if necessary. |
− | *When the CSW Permit is reissued, revise regulatory<br/>mechanism(s), if necessary, to be at least as stringent as the<br/>requirements for erosion, sediment, and waste controls described<br/>in the CSW Permit. | + | *<i>When the CSW Permit is reissued, revise regulatory<br/>mechanism(s), if necessary, to be at least as stringent as the<br/>requirements for erosion, sediment, and waste controls described<br/>in the CSW Permit. |
| | | | ||
− | *Within 12 months of the date General Permit<br/>coverage is extended | + | *Within 12 months of the date General Permit<br/>coverage is extended. |
*Within 12 months of the issuance date of the CSW<br/>Permit (expected issuance date of the CSW Permit<br/>is August 1, 2023). | *Within 12 months of the issuance date of the CSW<br/>Permit (expected issuance date of the CSW Permit<br/>is August 1, 2023). | ||
|- | |- | ||
− | |'''Section 21. Pollution Prevention/Good Housekeeping for<br/>Municipal Operations''' | + | |'''Section 21. Pollution Prevention/Good Housekeeping for<br/>Municipal Operations''' |
*<i>Conduct structural stormwater best management practice (BMP)<br/>inspections. | *<i>Conduct structural stormwater best management practice (BMP)<br/>inspections. | ||
− | *Conduct pond and outfall inspections | + | *<i>Conduct pond and outfall inspections |
| | | | ||
*Each calendar year. | *Each calendar year. | ||
*Prior to the expiration date of the General Permit. | *Prior to the expiration date of the General Permit. | ||
|- | |- | ||
− | | '''Section 22. Discharges to Impaired Waters with a USEPA-<br/>Approved TMDL that includes an Applicable WLA''' | + | |'''Section 22. Discharges to Impaired Waters with a USEPA-<br/>Approved TMDL that includes an Applicable WLA''' |
*<i>Submit all information required in item 22.2. | *<i>Submit all information required in item 22.2. | ||
− | *Meet requirements for applicable WLAs for bacteria, chloride,<br/>and temperature in Section 22. | + | *<i>Meet requirements for applicable WLAs for bacteria, chloride,<br/>and temperature in Section 22. |
| | | | ||
*With each annual report. | *With each annual report. | ||
*Within 12 months of the date General Permit<br/>coverage is extended. | *Within 12 months of the date General Permit<br/>coverage is extended. | ||
|- | |- | ||
− | |'''Section 25. Annual Assessment, Annual Reporting, and<br/>Recordkeeping''' | + | |'''Section 25. Annual Assessment, Annual Reporting, and<br/>Recordkeeping''' |
*<i>Conduct assessment of the SWPPP. | *<i>Conduct assessment of the SWPPP. | ||
− | *On a form provided by the Agency, submit an annual report | + | *<i>On a form provided by the Agency, submit an annual report. |
| | | | ||
*Prior to completion of each annual report. | *Prior to completion of each annual report. | ||
− | *By June | + | *By June 30th of each calendar year. |
|} | |} | ||
Line 49: | Line 47: | ||
{| class="wikitable" style = "background: transparent;" | {| class="wikitable" style = "background: transparent;" | ||
|- | |- | ||
− | ! style="text-align: left; background: transparent;"|'''<i>Permit requirement</i> | + | !style="text-align: left; background: transparent;"|'''<i>Permit requirement</i> !!style="text-align: left; background: transparent;"|'''<i>Schedule</i> |
|- | |- | ||
− | |'''Section 10. New Permittee Applicants''' | + | | '''Section 10. New Permittee Applicants''' |
− | *<i>Submit Part 1, and Part 2 of the permit application as required<br/>by Section 12 | + | *<i>Submit Part 1, and Part 2 of the permit application as required<br/>by Section 12. |
− | | | + | | |
*Within 18 months of written notification from the<br/>Commissioner that the MS4 meets the criteria in Minn.<br/>R. 7090.1010, subp. 1.A. or B. and General Permit coverage is<br/>required. | *Within 18 months of written notification from the<br/>Commissioner that the MS4 meets the criteria in Minn.<br/>R. 7090.1010, subp. 1.A. or B. and General Permit coverage is<br/>required. | ||
|- | |- | ||
− | |'''Section 13. Stormwater Pollution Prevention Program (SWPPP)''' | + | |'''Section 13. Stormwater Pollution Prevention Program (SWPPP)''' |
− | *<i>Complete all requirements of Sections 14 - 23. | + | *<i>Complete all requirements of Sections 14 - 23. |
| | | | ||
*Within 36 months of the date General Permit coverage is<br/>extended, unless other timelines have been specifically<br/>established in the General Permit and identified below; or | *Within 36 months of the date General Permit coverage is<br/>extended, unless other timelines have been specifically<br/>established in the General Permit and identified below; or | ||
− | *Within timelines established by the Commissioner in item 8.3 | + | *Within timelines established by the Commissioner in item 8.3 |
|- | |- | ||
− | |'''Section 14. Mapping''' | + | |'''Section 14. Mapping''' |
− | *<i>Develop a storm sewer system map. | + | *<i>Develop a storm sewer system map. |
| | | | ||
− | *Within 24 months of the date General Permit<br/> | + | *Within 24 months of the date General Permit coverage is<br/>extended. |
|- | |- | ||
− | |'''Section 18. Illicit Discharge Detection and Elimination''' | + | |'''Section 18. Illicit Discharge Detection and Elimination''' |
− | *<i>Develop, implement, and enforce an Illicit Discharge Detection<br/>and Elimination Program. | + | *<i>Develop, implement, and enforce an Illicit Discharge Detection<br/>and Elimination Program. |
| | | | ||
− | *Within 12 months of the date General Permit<br/> | + | *Within 12 months of the date General Permit coverage is<br/>extended. |
|- | |- | ||
− | |'''Section 19. Construction Site Stormwater Runoff Control''' | + | |'''Section 19. Construction Site Stormwater Runoff Control''' |
*<i>Develop, implement, and enforce a Construction Site<br/>Stormwater Runoff Control Program. | *<i>Develop, implement, and enforce a Construction Site<br/>Stormwater Runoff Control Program. | ||
− | *When the CSW Permit is reissued, revise regulatory<br/>mechanism(s), if necessary, to be at least as stringent as the<br/>requirements for erosion, sediment, and waste controls<br/> | + | *<i>When the CSW Permit is reissued, revise regulatory<br/>mechanism(s), if necessary, to be at least as stringent as the<br/>requirements for erosion, sediment, and waste controls described<br/>in the CSW Permit. |
| | | | ||
− | *Within 12 months of the date General Permit<br/> | + | *Within 12 months of the date General Permit coverage is<br/>extended. |
*Within 12 months of the issuance date of the CSW Permit<br/>(expected issuance date of the CSW Permit is August 1, 2023). | *Within 12 months of the issuance date of the CSW Permit<br/>(expected issuance date of the CSW Permit is August 1, 2023). | ||
|- | |- | ||
− | |'''Section 20. Post-Construction Stormwater Management''' | + | |'''Section 20. Post-Construction Stormwater Management''' |
− | *<i>Develop, implement, and enforce a Post-Construction<br/>Stormwater Management program. | + | *<i>Develop, implement, and enforce a Post-Construction <br/>Stormwater Management program. |
| | | | ||
*Within 24 months of the date General Permit<br/>coverage is extended. | *Within 24 months of the date General Permit<br/>coverage is extended. | ||
− | |- | + | |- |
− | |'''Section 21. Pollution Prevention/Good Housekeeping for<br/>Municipal Operations''' | + | |'''Section 21. Pollution Prevention/Good Housekeeping for<br/>Municipal Operations''' |
*<i>Conduct structural stormwater BMP inspections. | *<i>Conduct structural stormwater BMP inspections. | ||
− | *Conduct pond and outfall inspections. | + | *<i>Conduct pond and outfall inspections. |
| | | | ||
− | *Each calendar year | + | *Each calendar year |
*Prior to the expiration date of the General Permit. | *Prior to the expiration date of the General Permit. | ||
|- | |- | ||
− | |'''Section 22. Discharges to Impaired Waters with a USEPA-<br/>Approved TMDL that includes an Applicable WLA''' | + | |'''Section 22. Discharges to Impaired Waters with a USEPA-<br/>Approved TMDL that includes an Applicable WLA''' |
*<i>Submit all information required in item 22.2. | *<i>Submit all information required in item 22.2. | ||
− | *Meet requirements for applicable WLAs for bacteria, chloride,<br/>and temperature in Section 22. | + | *<i>Meet requirements for applicable WLAs for bacteria, chloride,<br/>and temperature in Section 22. |
| | | | ||
*With each annual report. | *With each annual report. | ||
− | *Within 12 months of the date General Permit<br/> | + | *Within 12 months of the date General Permit coverage is<br/>extended. |
|- | |- | ||
− | |'''Section 23. Alum or Ferric Chloride Phosphorus Treatment<br/>Systems (if applicable)''' | + | |'''Section 23. Alum or Ferric Chloride Phosphorus Treatment<br/>Systems (if applicable)''' |
− | *<i>Meet requirements for treatment systems in Section 23 | + | *<i>Meet requirements for treatment systems in Section 23 |
| | | | ||
− | *Within 12 months of the date General Permit<br/> | + | *Within 12 months of the date General Permit coverage is<br/>extended. |
|- | |- | ||
− | |'''Section 25. Annual | + | |'''Section 25. Annual Assessment, Annual Reporting, and<br/>Recordkeeping''' |
− | *<i>Conduct assessment of the SWPPP.<i | + | *<i>Conduct assessment of the SWPPP. |
− | + | *<i>On a form provided by the Agency, submit an annual report. | |
| | | | ||
*Prior to completion of each annual report. | *Prior to completion of each annual report. | ||
*By June 30<sup>th</sup> of each calendar year. | *By June 30<sup>th</sup> of each calendar year. | ||
|} | |} | ||
+ | |||
+ | <noinclude> | ||
+ | [[Category:Level 2 - Regulatory/Municipal (MS4)]] | ||
+ | </noinclude> |
Permit requirement | Schedule |
---|---|
Section 12. Stormwater Pollution Prevention Program (SWPPP) Document.
|
|
Section 13. Stormwater Pollution Prevention Program (SWPPP)
|
|
Section 19. Construction Site Stormwater Runoff Control
|
|
Section 21. Pollution Prevention/Good Housekeeping for Municipal Operations
|
|
Section 22. Discharges to Impaired Waters with a USEPA- Approved TMDL that includes an Applicable WLA
|
|
Section 25. Annual Assessment, Annual Reporting, and Recordkeeping
|
|
Permit requirement | Schedule |
---|---|
Section 10. New Permittee Applicants
|
|
Section 13. Stormwater Pollution Prevention Program (SWPPP)
|
|
Section 14. Mapping
|
|
Section 18. Illicit Discharge Detection and Elimination
|
|
Section 19. Construction Site Stormwater Runoff Control
|
|
Section 20. Post-Construction Stormwater Management
|
|
Section 21. Pollution Prevention/Good Housekeeping for Municipal Operations
|
|
Section 22. Discharges to Impaired Waters with a USEPA- Approved TMDL that includes an Applicable WLA
|
|
Section 23. Alum or Ferric Chloride Phosphorus Treatment Systems (if applicable)
|
|
Section 25. Annual Assessment, Annual Reporting, and Recordkeeping
|
|