m
 
(8 intermediate revisions by the same user not shown)
Line 1: Line 1:
= =
+
==January 19 webinar: Pretreatment - how can we do better?==
 +
'''Title'''. Pretreatment: how can we do better?
 +
 
 +
'''When'''. January 19, 1:00-2:30 PM Central Standard Time
 +
 
 +
'''Speakers'''
 +
*Dr. John Chapman, University of Minnesota - discussion of pretreatment and solids
 +
*Mike Isensee, Adminstrator of Carnelian Marine St. Croix Watershed District, and Noah Czech, Stormwater Compliance Specialist, City of St. Cloud, MN - pretreatment practices and approaches in the field
 +
*Chris French, National Regulatory Manager for BioClean - Observations (the good, bad, and ugly)
 +
 
 +
'''Abstract''': The Minnesota Construction Stormwater Permit requires pretreatment for filtration and infiltration practices. Forebays or other pretreatment practices are highly recommended for constructed stormwater ponds. The permit, however, does not specify the type of or sizing for pretreatment practices. We are discovering that many stormwater best management practices (bmps, also often called stormwater control measures or scms) are not performing as designed, often due to heavy sediment loads to the bmp and to poor design.
 +
 
 +
In this webinar, speakers will discuss solids in stormwater runoff and the role of pretreatment, some preferred approaches to implementing pretreatment practices, and some observations of pretreatment implementation. We’ll also briefly go through pretreatment information in the Minnesota Stormwater Manual.
 +
 
 +
For more information on pretreatment, see the following pages in the Minnesota Stormwater Manual
 +
*[https://stormwater.pca.state.mn.us/index.php?title=Pretreatment Pretreatment]
 +
*[https://stormwater.pca.state.mn.us/index.php?title=Minnesota_Stormwater_Manual_email_Updates#Featured_article_-_Pretreatment_.28June_2021.29 Featured article, June, 2021]
  
 
==MPCA Simple Estimator Training Level 1==
 
==MPCA Simple Estimator Training Level 1==
Line 26: Line 42:
 
**Basic components and functionality of the Calculator
 
**Basic components and functionality of the Calculator
 
*Relevant link(s)
 
*Relevant link(s)
**PowerPoint used for training [[File:MIDS Intro training.pptx}]
+
**PowerPoint used for training [[File:MIDS Intro training April 1.pptx]]
 
**[[MIDS calculator]]
 
**[[MIDS calculator]]
 
**[https://stormwater.pca.state.mn.us/index.php?title=MIDS_calculator#Related_pages Other links for the MIDS Calculator]
 
**[https://stormwater.pca.state.mn.us/index.php?title=MIDS_calculator#Related_pages Other links for the MIDS Calculator]
 +
 +
==MIDS Calculator - Intermediate==
 +
*Goal: Participants will work on more advanced problems using the Minimal Impact Design Standards (MIDS) Calculator
 +
*Prerequisite
 +
**Have the MIDS Calculator downloaded on your computer [https://stormwater.pca.state.mn.us/index.php?title=MIDS_calculator link to download]
 +
**Have taken the Introduction course or be familiar with the learning goals described above for the Introductory training
 +
*Format: Participants work on problems using the MIDS Calculator. Hands-on interactive format. Participants report out after working on problems. Class size limited.
 +
*Learning goals
 +
**Become familiar with individuals bmps
 +
**Model a site with multiple bmps
 +
**Model sites where specific performance goals are difficult to meet
 +
**Learn ways to incorporate non-standard practices (e.g. street sweeping) or site characteristics (variable emcs) into the calculator
  
 
==MIDS Calculator updates - Version 4==
 
==MIDS Calculator updates - Version 4==
 
The Minimal Impact Design Standards (MIDS) Calculator has been updated to Version 4. This one hour webinar will provide a summary of the changes from Version 3 of the calculator.
 
The Minimal Impact Design Standards (MIDS) Calculator has been updated to Version 4. This one hour webinar will provide a summary of the changes from Version 3 of the calculator.
 +
 +
[[Category:Level 3 - General information, reference, tables, images, and archives/Reference/Training, webinars, and workshops]]

Latest revision as of 14:29, 6 December 2022

January 19 webinar: Pretreatment - how can we do better?

Title. Pretreatment: how can we do better?

When. January 19, 1:00-2:30 PM Central Standard Time

Speakers

  • Dr. John Chapman, University of Minnesota - discussion of pretreatment and solids
  • Mike Isensee, Adminstrator of Carnelian Marine St. Croix Watershed District, and Noah Czech, Stormwater Compliance Specialist, City of St. Cloud, MN - pretreatment practices and approaches in the field
  • Chris French, National Regulatory Manager for BioClean - Observations (the good, bad, and ugly)

Abstract: The Minnesota Construction Stormwater Permit requires pretreatment for filtration and infiltration practices. Forebays or other pretreatment practices are highly recommended for constructed stormwater ponds. The permit, however, does not specify the type of or sizing for pretreatment practices. We are discovering that many stormwater best management practices (bmps, also often called stormwater control measures or scms) are not performing as designed, often due to heavy sediment loads to the bmp and to poor design.

In this webinar, speakers will discuss solids in stormwater runoff and the role of pretreatment, some preferred approaches to implementing pretreatment practices, and some observations of pretreatment implementation. We’ll also briefly go through pretreatment information in the Minnesota Stormwater Manual.

For more information on pretreatment, see the following pages in the Minnesota Stormwater Manual

MPCA Simple Estimator Training Level 1

  • Goal: Participants will learn how to use the Estimator to estimate pollutant loading with and without best management practices.
  • Prerequisite
  • Format: Participants work on problems using the Estimator. Hands-on interactive format. Participants report out after working on problems. Class size limited.
  • Learning goals
    • Calculating pollutant loads with and without best management practices
    • Interpreting results and assessing your modeled system
  • Relevant link(s)

MIDS Calculator - Introduction

  • Goal: Participants will learn how to use the Minimal Impact Design Standards (MIDS) Calculator to estimate runoff volume reduction and pollutant loading with and without best management practices.
  • Prerequisite
  • Format: Participants work on problems using the MIDS Calculator. Hands-on interactive format. Participants report out after working on problems. Class size limited.
  • Learning goals
    • Create files in the MIDS Calculator
    • Set up a site
    • Learn how to incorporate best management practices into your site(s)
    • Basic components and functionality of the Calculator
  • Relevant link(s)

MIDS Calculator - Intermediate

  • Goal: Participants will work on more advanced problems using the Minimal Impact Design Standards (MIDS) Calculator
  • Prerequisite
    • Have the MIDS Calculator downloaded on your computer link to download
    • Have taken the Introduction course or be familiar with the learning goals described above for the Introductory training
  • Format: Participants work on problems using the MIDS Calculator. Hands-on interactive format. Participants report out after working on problems. Class size limited.
  • Learning goals
    • Become familiar with individuals bmps
    • Model a site with multiple bmps
    • Model sites where specific performance goals are difficult to meet
    • Learn ways to incorporate non-standard practices (e.g. street sweeping) or site characteristics (variable emcs) into the calculator

MIDS Calculator updates - Version 4

The Minimal Impact Design Standards (MIDS) Calculator has been updated to Version 4. This one hour webinar will provide a summary of the changes from Version 3 of the calculator.

This page was last edited on 6 December 2022, at 14:29.