<font size=3>'''Stormwater reuse project data.</font size><br>
 
<font size=3>'''Stormwater reuse project data.</font size><br>
 
Link to this [[Stormwater reuse project data|table]]
 
Link to this [[Stormwater reuse project data|table]]
Line 218: Line 217:
 
<td>St. Paul</td>
 
<td>St. Paul</td>
 
<td>Rainwater - roof only</td>
 
<td>Rainwater - roof only</td>
<<td>Currently used for exterior landscaping only, designed and constructed for indoor use by future developments. </td>
+
<td>Currently used for exterior landscaping only, designed and constructed for indoor use by future developments. </td>
 
<td>CDS Swirl Separator pretreatment, 25 micron pre-filter, 5 micron bag filter, 5 micron carbon filter, UV disinfection, Ozone injection recirculation in storage tank</td>
 
<td>CDS Swirl Separator pretreatment, 25 micron pre-filter, 5 micron bag filter, 5 micron carbon filter, UV disinfection, Ozone injection recirculation in storage tank</td>
 
<td>2019</td>
 
<td>2019</td>
 
<td>Currently 3.83 acres of stadium roof, designed for additional future development rooftop area of 7.7 acres</td>
 
<td>Currently 3.83 acres of stadium roof, designed for additional future development rooftop area of 7.7 acres</td>
<td>58,000 ft3 below overflow of 10-foot SRPE pipe gallery</td>
+
<td>58,000 ft<sup>3</sup> below overflow of 10-foot SRPE pipe gallery</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 482: Line 481:
 
<td>2015 to 2021</td>
 
<td>2015 to 2021</td>
 
<td></td>
 
<td></td>
<td> Large ponds used to capture runoff and a lake with appropriation permit </td>
+
<td> Large ponds used to capture runoff and a lake with appropriation permit</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 545: Line 544:
 
</tr>
 
</tr>
 
</table>
 
</table>
 +
 +
<noinclude>
 +
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Harvest and reuse]]
 +
</noinclude>

Latest revision as of 19:38, 4 August 2022

Stormwater reuse project data.
Link to this table

Project name City Source water type End use of water Treatment process Startup date Collection area Size of storage tank
City Place of Woodbury Woodbury Constructed stormwater pond Irrigation-commercial center Filter, no other treatment 2016
Legends of Woodbury Woodbury Constructed stormwater pond Irrigation-high density residential Filter, no other treatment 2019
Sundance Woodbury Constructed stormwater pond Irrigation-high density residential Filter, no other treatment under construction
Beyond Apartments Woodbury Constructed stormwater pond Irrigation-high density residential Filter, no other treatment under construction
North Bluffs Woodbury Constructed stormwater pond Irrigation-high density residential Filter, no other treatment under construction
Launch/Tamarack Woodbury Constructed stormwater pond Irrigation-commercial center Filter, no other treatment under construction
Bielenberg Gardens Woodbury Constructed stormwater pond Irrigation-commercial center Filter, no other treatment 2017
Saint Therese Senior Services Woodbury Constructed stormwater pond Irrigation-high density residential Filter, no other treatment 2017
Harvest Commons Woodbury Constructed stormwater pond Irrigation-high density residential Filter, no other treatment 2018
Oak Hill Woodbury Constructed stormwater pond Irrigation-high density residential Filter, no other treatment 2019
Ascend at Woodbury Woodbury Constructed stormwater pond Irrigation-high density residential Filter, no other treatment 2018
Heartland Dental/Kindercare Woodbury Constructed stormwater pond Irrigation-commercial center Filter, no other treatment under construction
Summerhill at Woodbury Woodbury Constructed stormwater pond Irrigation-high density residential Filter, no other treatment 2018
Health East Sports Complex Woodbury Constructed stormwater pond, irrigation well adds water to the same pond Irrigation-ball fields Filter, no other treatment see DNR water conservation report for more info
Eagle Valley Golf Course Woodbury Constructed stormwater pond, irrigation well adds water to the same pond Irrigation-golf course Filter, no other treatment see DNR water conservation report for more info
Prestwick Golf Course Woodbury Constructed stormwater pond, irrigation well adds water to the same pond Irrigation-golf course Filter, no other treatment see DNR water conservation report for more info
Summit Pointe Park Woodbury Natural wetland Irrigation-ball fields Filter, no other treatment see DNR water conservation report for more info
Windwood Passage Park Woodbury Natural wetland Irrigation-public building Filter, no other treatment see DNR water conservation report for more info
County Road 19 Expansion Woodbury Stormwater Irrigation-golf course Pond settling 2014 Roughly 60 acres 3 acre pond
Capitol Region Watershed District Office St. Paul Rainwater - roof only Toilet Flushing, Interactive Water Feature, Pocket Park Pond, Exterior Hose Spigots, Bottle Washing Machine Wisy Pre=treatment, 50 micron pre-filter, 5 micron bag filter, 5 micron carbon filter, UV disinfection 2019 15,000 square feet of rooftop 3000 gallons
Allianz Field St. Paul Rainwater - roof only Currently used for exterior landscaping only, designed and constructed for indoor use by future developments. CDS Swirl Separator pretreatment, 25 micron pre-filter, 5 micron bag filter, 5 micron carbon filter, UV disinfection, Ozone injection recirculation in storage tank 2019 Currently 3.83 acres of stadium roof, designed for additional future development rooftop area of 7.7 acres 58,000 ft3 below overflow of 10-foot SRPE pipe gallery
CHS Field St. Paul Rainwater - roof only Irrigation - ballfield and toilet flushing WISY Filter 380 microns – 50 micron back flushing orival filter – 1 micron absolute sediment filter – carbon filter – high flow 140GPM UV disinfection 2015 33,770 ft2 27,000 gallons
Great River School St. Paul Rainwater - roof only Irrigation Vortex-150 Filter 2015 8,276 ft2 4,500 gallons
Springbox Office St. Paul Rainwater - roof only Irrigation WISY, WFF 300, 100 micron filter Planned for 2021 3,296 ft2 3,400 gallons
Greensboro Square Cistern St. Louis Park Rainwater - roof only Irrigation Coarse filter at top of pump; UV disinfection is used when in operation for irrigation. City required UV disinfection at installation. September 25, 2017 Collects gutter runoff from sections of two large condo buildings (approx. 5100 ft2) and used to irrigate planting areas of about a 1/2 acre using multiple zones 3500 gallons
Rice Creek Fields Water Reuse Project Shoreview Stormwater Irrigation - ballfield UV disinfection 2019 No storage tank
St. Anthony Reuse St. Anthony Village Stormwater, process water Irrigation Self cleaning disc filter 2008 500,000 gallons
Minnesota Nursery & Landscape Association Roseville Stormwater - roof only Irrigation Conservation Technology pot filler with perforated filter insert filled with gravel and filter pad, WFF 150 vortex filter 2019 3,696 ft2 6000 gallons
Upper Villa Park Stormwater Reuse and Infiltration Project Roseville Stormwater Irrigation for one softball field Stainless steel filter for particles 2016 250 acres of residential land 13,000 cubic feet
Ramsey County Stormwater Reuse Project Ramsey County Stormwater Irrigation TBD 2021 TBD TBD
Mystic Lake Water Reuse System Prior Lake Water reclamation plant discharge, rainwater Irrigation of commercial property around the community. Filtration 2013 NA NA
Lions Park Water Reuse New Brighton Stormwater and unused irrigation water Irrigation UV disinfection 2019 14 acres No storage tanks
Water Treatment Plant #16 Minnetonka Groundwater Water treatment filter backwash water is reclaimed and treated for drinking water Filtration and chemical treatment. 2004 NA 350,000 gallons
MWMO Stormwater Park and Learning Center Minneapolis Rainwater - roof only Irrigation Filter screen 2012 4000 gallons
Westminster Church Minneapolis Rainwater - roof only Toilet flushing / fountain UV disinfection 2016 24,210 gallons
Water works Minneapolis Rainwater - roof only Irrigation / toilet flushing UV disinfection 2021 100,000 gallons
Jax Apartments Blue-Green Roof Minneapolis Rainwater - roof only Irrigation 2020 4000 gallons
Edison High School Minneapolis Roof and parking lot Irrigation UV disinfection 2014 142,000 gallons
The Interchange (Target Field) Minneapolis Stormwater - plaza Industrial processes Sand filter 2014 40,000 gallons
Cemstone Minneapolis Stormwater - roof and parking lot Making concrete Series of concrete washout bays 2018 169,769 gallons
Hiawatha Collegiate Reuse Minneapolis Stormwater - roof and parking lot Irrigation 2018 97,700 gallons
Towerside Minneapolis Stormwater - roof and parking lot Irrigation UV disinfection 2020 206,500 gallons
Minneapolis Sculpture Garden Minneapolis Stormwater from vegetated ground, overflow from sculpture Irrigation 2020 80,000 gallons
Maplewood Mall Retrofit - Cistern Maplewood Rainwater - roof only Turn water wheels and activate chimes as part of an interactive public education piece. None 2012 Roughly about 1% of the Maplewood Mall Roof 5700 gallons
Aronson Park Water Reuse Lakeville Stormwater Irrigation of ball and soccer fields at Aronson park Water is pumped from the wet well and through a self flushing 300 micron suction scanner filter and out to an irrigation system 2019 ~10 acres of roadway and park area, ~3 acres of development draining to stormwater pond providing irrigation to 5.3 acres of soccer field and 6.59 acres of ball field Two previous stormwater treatment basins were combined to create one large wet sedimentation basin to provide 3.81 million gallons of annual volume reduction.
King Park Irrigation Reuse Lakeville Stormwater from two stormwater ponds Irrigation of adjacent park ball fields (4.5 ac of turfgrass) Pump system draws water from stormwater ponds, does not provide additional treatment 2011 initiation, added a second stormwater pond to expand treatment and reuse volume in 2016 5 acres of pavement from Dodd Road and the parking lot for King Park, also runoff from 20,000 ft2 rubberized and asphalt baseball field (The Miracle League) Volume reduction to Middle Creek from pond 2 is 415,562 ft3/year. Combined usage reduction is 3.1 million gallons/year of municipal water.
Tom Kaldunski Inver Grove Heights Rainwater - roof only Irrigation Treatment train with combination of SAFL baffles, rain garden infiltration basins and pumps with irrigation systems to spray yards or forested outlets 2015 to 2021 Large ponds used to capture runoff and a lake with appropriation permit
Honeywell Pond Golden Valley Stormwater Irrigation Filter 2017 278147.5 ft3
Shields Lake Stormwater Harvest & Irrigation Reuse Project Forest Lake Stormwater irrigation water for the Forest Hills Golf Club Settling 2019 294 acres of agriculture and mixed residential 40,000 ft3 pond
Fire Station #2 Water Reuse System Eden Prairie Rainwater - roof only Irrigation - drip, for one system. Vehicle washing for second system. Filter only for drip irrigation system. Three stage filter and UV disinfection for vehicle washing system. 2018 8,900 square foot roof Drip irrigation system consists of one 150 gallon tank and a 800 gallon tank. Vehicle washing system consists of a 6,500 gallon tank. Total combined tanks are 7,450
Becker Park Storm Water Infiltration System Crystal Rainwater, splashpad runoff Infiltration Sump, trash skimmer 2019 142 acres mostly commercial and some residential Approximately 2.3 million gallons
Fireman's Park Chaska Rain water, off of roofs, streets and parking lots Irrigation water for the park and the landscaping in the median on county road 61 Filtering system to protect the pump station and heads 2016 4 acres 155,000 gallons
Lake Susan Park Pond Watershed Treatment and Stormwater Reuse Project Chanhassen Stormwater Irrigation - ballfield UV disinfection 2019 2553 acres No tank; stormwater pond