m |
m |
||
(3 intermediate revisions by the same user not shown) | |||
Line 7: | Line 7: | ||
*[[Information on pollutant removal by BMPs]] | *[[Information on pollutant removal by BMPs]] | ||
*[[Overview of stormwater credits]] | *[[Overview of stormwater credits]] | ||
− | |||
*Credits for individual BMPs | *Credits for individual BMPs | ||
**[[Calculating credits for bioretention]] | **[[Calculating credits for bioretention]] | ||
Line 24: | Line 23: | ||
<noinclude> | <noinclude> | ||
− | [[Category: | + | [[Category:Level 3 - Best management practices/Guidance and information/Pollutant removal and credits]] |
− | |||
</noinclude> | </noinclude> |
Credit refers to the stormwater runoff volume or pollutant reduction achieved toward meeting a runoff volume or water quality goal. Examples of goals include meeting the 1 inch volume reduction requirement in the Construction Stormwater General Permit and meeting TMDL pollutant reduction requirements. Credits can be achieved either by an individual BMP or cumulatively with multiple BMPs.
The following pages provide information on stormwater volume and pollutant credits, pollutant removal achieved by individual BMPs, methods for calculating volume and pollutant reductions (credits), and example calculations.
This page was last edited on 13 December 2022, at 18:40.