(Created page with " <center><font size=3>'''Overview of unified stormwater sizing criteria'''</font size><br> Link to this Overview of unified stormwater sizing criteria</center> <table cla...")
 
m
 
(6 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
+
<font size=3>'''Overview of unified stormwater sizing criteria'''</font size><br>
<center><font size=3>'''Overview of unified stormwater sizing criteria'''</font size><br>
+
Link to this [[Overview of unified stormwater sizing criteria|table]]
Link to this [[Overview of unified stormwater sizing criteria]]</center>
 
  
 
<table class="sortable">
 
<table class="sortable">
Line 12: Line 11:
 
<td>
 
<td>
 
'''Regular Waters:''' None required, although recharge and infiltration are strongly encouraged through better site design and stormwater credits.
 
'''Regular Waters:''' None required, although recharge and infiltration are strongly encouraged through better site design and stormwater credits.
 +
 
'''CGP Special Waters:''' Full infiltration of the excess runoff volume from the two year-24 hour storm event is one option contained in the CGP to meet the requirement for temperature control for trout streams.
 
'''CGP Special Waters:''' Full infiltration of the excess runoff volume from the two year-24 hour storm event is one option contained in the CGP to meet the requirement for temperature control for trout streams.
'''Other Sensitive Receiving Waters:'' Recharge recommended as a local option.
+
 
 +
'''Other Sensitive Receiving Waters:''' Recharge recommended as a local option.
 
Recharge may be restricted or prohibited in certain settings, as outlined in the Recharge and Infiltration Criterion below.</td>
 
Recharge may be restricted or prohibited in certain settings, as outlined in the Recharge and Infiltration Criterion below.</td>
 
</tr>
 
</tr>
Line 21: Line 22:
 
<td>
 
<td>
 
'''Regular Waters:''' Apply MPCA Sizing Rule 1 or 3 in 2003 GCP, depending on BMP used.
 
'''Regular Waters:''' Apply MPCA Sizing Rule 1 or 3 in 2003 GCP, depending on BMP used.
 +
 
'''CGP Special Waters:''' Apply MPCA Sizing Rule 2 or 4 in 2003 GCP, depending on BMP used. Additional BMPs required under CGP Appendix A (B) for special waters.
 
'''CGP Special Waters:''' Apply MPCA Sizing Rule 2 or 4 in 2003 GCP, depending on BMP used. Additional BMPs required under CGP Appendix A (B) for special waters.
 +
 
'''Other Sensitive Receiving Waters:''' Recommend expanded sizing criteria for most-sensitive lakes, trout streams (in CGP), susceptible wetlands and impaired waters, as described later in this section.</td>
 
'''Other Sensitive Receiving Waters:''' Recommend expanded sizing criteria for most-sensitive lakes, trout streams (in CGP), susceptible wetlands and impaired waters, as described later in this section.</td>
 
</tr>
 
</tr>
Line 28: Line 31:
 
<td>
 
<td>
 
'''Regular Waters:''' No current state requirement. It is recommended that communities adopt a criterion for either 24-hour extended detention of the 1-year, 24-hour design storm or one-half of the 2-yr, 24-hr pre-development peak flow when revising or adopting local stormwater ordinances for peak flow control (and eliminate two-year peak discharge requirements).
 
'''Regular Waters:''' No current state requirement. It is recommended that communities adopt a criterion for either 24-hour extended detention of the 1-year, 24-hour design storm or one-half of the 2-yr, 24-hr pre-development peak flow when revising or adopting local stormwater ordinances for peak flow control (and eliminate two-year peak discharge requirements).
 +
 
'''CGP Special Waters:''' One- and two-year design storm peak discharge and volume control required in four special water categories (wilderness, trout lakes, lake trout lakes, and scientific and natural areas).
 
'''CGP Special Waters:''' One- and two-year design storm peak discharge and volume control required in four special water categories (wilderness, trout lakes, lake trout lakes, and scientific and natural areas).
 +
 
'''Other Sensitive Receiving Waters:''' 12-hour detention of water is recommended as the most for discharge to trout streams (to prevent heating), while other sensitive receiving waters should maintain the 24-hour minimum.</td>
 
'''Other Sensitive Receiving Waters:''' 12-hour detention of water is recommended as the most for discharge to trout streams (to prevent heating), while other sensitive receiving waters should maintain the 24-hour minimum.</td>
 
</tr>
 
</tr>
Line 36: Line 41:
 
<td>
 
<td>
 
'''Current Local Requirement:''' Varies, but typically involves either 10-year design storm peak discharge control, or a combination of 10- and 25-year design storm peak discharge control.
 
'''Current Local Requirement:''' Varies, but typically involves either 10-year design storm peak discharge control, or a combination of 10- and 25-year design storm peak discharge control.
 +
 
'''CGP Special Waters and Other Sensitive Receiving Waters:''' No additional requirements.</td>
 
'''CGP Special Waters and Other Sensitive Receiving Waters:''' No additional requirements.</td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
<td>Extreme Storm <sub>(Vp100)</sub></td>
+
<td>Extreme Storm (V<sub>p100</sub>)</td>
 
<td>
 
<td>
'''Current Local Requirement:''' Varies, but frequently involves 100-year design storm peak discharge control. In other cases, peak discharge control is waived if development is excluded from ultimate 100-year floodplain, or an acceptable downstream hydrologic analysis indicates it is not needed. Stormwater BMPs must be designed to provide safe overflow of the 100 year-peak discharge even if extreme storm control is not required at the site.
+
'''Current Local Requirement:''' Varies, but frequently involves 100-year design storm peak discharge control. In other cases, peak discharge control is waived if development is excluded from ultimate 100-year floodplain, or an acceptable downstream hydrologic analysis indicates it is not needed. Stormwater BMPs must be designed to provide safe overflow of the 100 year-peak discharge even if extreme storm control is not required at the site.
 +
 
 
'''CGP Special Waters and Other Sensitive Receiving Waters:''' No additional requirements.</td>
 
'''CGP Special Waters and Other Sensitive Receiving Waters:''' No additional requirements.</td>
 
</tr>
 
</tr>
Line 48: Line 55:
 
</table>
 
</table>
  
[[category:Table]]
+
<noinclude>
 +
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Unified sizing criteria]]
 +
</noinclude>

Latest revision as of 12:13, 7 August 2022

Overview of unified stormwater sizing criteria
Link to this table

Target Current State or Local Sizing Criteria
Recharge (Vre) or Infiltration

Regular Waters: None required, although recharge and infiltration are strongly encouraged through better site design and stormwater credits.

CGP Special Waters: Full infiltration of the excess runoff volume from the two year-24 hour storm event is one option contained in the CGP to meet the requirement for temperature control for trout streams.

Other Sensitive Receiving Waters: Recharge recommended as a local option.

Recharge may be restricted or prohibited in certain settings, as outlined in the Recharge and Infiltration Criterion below.
Water Quality (Vwq)

Regular Waters: Apply MPCA Sizing Rule 1 or 3 in 2003 GCP, depending on BMP used.

CGP Special Waters: Apply MPCA Sizing Rule 2 or 4 in 2003 GCP, depending on BMP used. Additional BMPs required under CGP Appendix A (B) for special waters.

Other Sensitive Receiving Waters: Recommend expanded sizing criteria for most-sensitive lakes, trout streams (in CGP), susceptible wetlands and impaired waters, as described later in this section.
Channel Protection (Vcp)

Regular Waters: No current state requirement. It is recommended that communities adopt a criterion for either 24-hour extended detention of the 1-year, 24-hour design storm or one-half of the 2-yr, 24-hr pre-development peak flow when revising or adopting local stormwater ordinances for peak flow control (and eliminate two-year peak discharge requirements).

CGP Special Waters: One- and two-year design storm peak discharge and volume control required in four special water categories (wilderness, trout lakes, lake trout lakes, and scientific and natural areas).

Other Sensitive Receiving Waters: 12-hour detention of water is recommended as the most for discharge to trout streams (to prevent heating), while other sensitive receiving waters should maintain the 24-hour minimum.
Overbank Flood (Vp10)

Current Local Requirement: Varies, but typically involves either 10-year design storm peak discharge control, or a combination of 10- and 25-year design storm peak discharge control.

CGP Special Waters and Other Sensitive Receiving Waters: No additional requirements.
Extreme Storm (Vp100)

Current Local Requirement: Varies, but frequently involves 100-year design storm peak discharge control. In other cases, peak discharge control is waived if development is excluded from ultimate 100-year floodplain, or an acceptable downstream hydrologic analysis indicates it is not needed. Stormwater BMPs must be designed to provide safe overflow of the 100 year-peak discharge even if extreme storm control is not required at the site.