m |
m |
||
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | <font size=3>'''BMP design considerations for | + | <font size=3>'''BMP design considerations for groundwater aquifer protection</font size>'''<br> |
Link to this [[BMP design considerations for ground water aquifer protection|table]] | Link to this [[BMP design considerations for ground water aquifer protection|table]] | ||
<table class="sortable"> | <table class="sortable"> | ||
Line 26: | Line 26: | ||
<td>Stormwater Ponds</td> | <td>Stormwater Ponds</td> | ||
<td> | <td> | ||
− | * | + | *May need liner if A soils or active karst are present. The CSW permit requires a liner in areas of active karst. |
*Pre-treat PSH runoff | *Pre-treat PSH runoff | ||
*Provide a separation distance from well or water table to BMP</td> | *Provide a separation distance from well or water table to BMP</td> | ||
Line 33: | Line 33: | ||
<td>Constructed Stormwater Wetlands</td> | <td>Constructed Stormwater Wetlands</td> | ||
<td> | <td> | ||
− | *May | + | *May need liner if A soils or active karst are present. The CSW permit requires a liner in areas of active karst. |
*Pre-treat PSH runoff | *Pre-treat PSH runoff | ||
*Provide a separation distance from well or water table to BMP</td> | *Provide a separation distance from well or water table to BMP</td> | ||
</table> | </table> | ||
− | [[Category: | + | <noinclude> |
+ | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/General bmp information]] | ||
+ | </noinclude> |
BMP design considerations for groundwater aquifer protection
Link to this table
BMP Group | Design Consideration |
---|---|
Bioretention |
|
Filtration |
|
Infiltration |
|
Stormwater Ponds |
|
Constructed Stormwater Wetlands |
|
This page was last edited on 4 August 2022, at 20:03.