(Created page with "This page contains links to Microsoft Word documents that contain an example for the Minimal Impact Design Standards calculator. These files were largely developed for Version...")
 
m
 
Line 23: Line 23:
 
*[[File:2 - Bioretention Basin with underdrain.docx]]
 
*[[File:2 - Bioretention Basin with underdrain.docx]]
 
*[[File:2 - MIDS Calculator Overview.docx]]
 
*[[File:2 - MIDS Calculator Overview.docx]]
 +
*[[File:3 - Biofiltration Basin underdrain at bottom.docx]]
 +
*[[File:3 - Infiltration basin.docx]]
 +
*[[File:4 - Green Roof Example.docx]]
 +
*[[File:4 - Green Roof.docx]]
 +
*[[File:5 - Infiltration Basin example.docx]]
 +
*[[File:5 - Permeable pavement.docx]]
 +
*[[File:6 - Tree trench system-box.docx]]
 +
*[[File:7 - Tree trench system-box with underdrain.docx]]
 +
*[[File:7- Tree Trench Systme - Box (with out an underdrain).docx]]
 +
*[[File:8 - Swale Side Slope.docx]]
 +
*[[File:8 - Tree Trench System - Box (with underdrain).docx]]
 +
*[[File:9 - Swale Main Channel.docx]]
 +
*[[File:9 - Swale Side Slope and Main Channel Example.docx]]
 +
  
 
[[Category:Level 3 - Models and modeling/Specific models/MIDS Calculator]]
 
[[Category:Level 3 - Models and modeling/Specific models/MIDS Calculator]]

Latest revision as of 01:59, 3 April 2023

This page contains links to Microsoft Word documents that contain an example for the Minimal Impact Design Standards calculator. These files were largely developed for Version 2 of the calculator and therefore may be somewhat dated, but the basic approaches are still applicable.

This page was last edited on 3 April 2023, at 01:59.