PKalinosky (talk | contribs) |
|||
Line 11: | Line 11: | ||
:*Mitigation provisions if TSS and TP cannot be managed onsite. | :*Mitigation provisions if TSS and TP cannot be managed onsite. | ||
:*A [[#Model language|long term maintenance agreement]] for private structural stormwater BMPs. | :*A [[#Model language|long term maintenance agreement]] for private structural stormwater BMPs. | ||
− | :*[https://stormwater.pca.state.mn.us/index.php?title=Site_plan_review_procedure Site plan review procedures] to ensure the post-construction stormwater management is in accordance with the regulatory mechanism | + | :*[https://stormwater.pca.state.mn.us/index.php?title=Site_plan_review_procedure Site plan review procedures] to ensure the post-construction stormwater management is in accordance with the regulatory mechanism. |
− | |||
==Resources== | ==Resources== |
Paved surfaces exacerbate the negative impacts to stormwater, including increasing the stormwater discharge volume and pollutants in stormwater. Managing stormwater onsite post-construction is the more effective way to mitigate these impacts. Minimum Control Measure (MCM) 5 of the municipal separate storm sewer system (MS4) General Permit requires permittees to have and enforce a post-construction stormwater management program that prevents or reduces stormwater pollution in new- and re- development projects.
The post-construction stormwater management program should include:
Click on the blue links above in the "MS4 General Permit requirements" section to jump to the referenced section or page. Links to specific resources related to MCM 5 are listed below.
Fact sheets and guidance documents should provide background information and tips to inform your approach to implementing MCM 5 - Post-Construction Stormwater Management.
Fill in the blanks and adopt ordinance or long-term maintenance agreement language that meets the regulatory mechanism requirements for MCM 5 - Post-Construction Stormwater Management.
Documentation and tracking templates are examples that local stormwater staff are currently using to meet the MS4 General Permit requirements for MCM 5 - Post-Construction Stormwater Management.
Below are methods that local stormwater staff are currently using to meet the site plan review documentation Post-Construction Stormwater Management requirements in the MS4 General Permit for MCM 5 - Post-Construction Stormwater Management.
Example procedures are those that local stormwater staff are currently using to meet the MS4 PART III.STORMWATER POLLUTION PREVENTION PROGRAM (SWPPP)#5. Post-Construction Stormwater Management| MS4 General Permit requirements for MCM 5 - Post-Construction Stormwater Management.
The information in this section provides MS4 permittees with tools they can use to meet MCM 5, which addresses post-construction stormwater management.
This page was last edited on 31 October 2024, at 15:34.