GENERAL PERMIT
+
The [https://stormwater.pca.state.mn.us/index.php?title=2023_Minnesota_Construction_Stormwater_Permit Construction Stormwater permit] was reissued August 1, 2023.
AUTHORIZATION TO DISCHARGE STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM PROGRAM
 
  
[[Authorization page]]
+
You may access the 2018 Construction Stormwater Permit at [[File:Wq-strm2-80a.pdf|this link]] and the 2013 permit at [[File:Wq-strm2-68a.pdf|this link]]
  
<p>TABLE OF CONTENTS</p>
+
<noinclude>
 
+
[[Category:Level 2 - Regulatory/Construction (CSW)]]
[[I.  PERMIT COVERAGE AND LIMITATIONS]]
+
</noinclude>
::<p>[[I. PERMIT COVERAGE AND LIMITATIONS#I.A. PERMIT COVERAGE|A. Permit Coverage]]</p>
 
::<p>[[I. PERMIT COVERAGE AND LIMITATIONS#I.B. LIMITATIONS OF COVERAGEB. Limitations of Coverage]]</p>
 
[[II.  SUBMITTING THE APPLICATION]]
 
::<p>A. Prerequisite for Submitting a Permit Application</p>
 
::<p>B. Application and Duration of Coverage</p>
 
::<p>C. Termination of Coverage</p>
 
[[III.  STORMWATER DISCHARGE DESIGN REQUIREMENTS]]
 
::<p>A. Stormwater Pollution Prevention Plan Content</p>
 
::<p>B. SWPPP Amendments</p>
 
::<p>C. Temporary Sediment Basins</p>
 
::<p>D. Permanent Stormwater Management System</p>
 
::<p>E. Record Retention</p>
 
::<p>F. Training Requirements</p>
 
[[IV.  CONSTRUCTION ACTIVITY REQUIREMENTS]]
 
::<p>A. Stormwater Pollution Prevention Plan</p>
 
::<p>B. Erosion Prevention Practices</p>
 
::<p>C. Sediment Control Practices</p>
 
::<p>D. Dewatering and Basin Draining</p>
 
::<p>E. Inspections and Maintenance</p>
 
::<p>F. Pollution Prevention Management Measures</p>
 
::<p>G. Final Stabilization</p>
 
[[V.  GENERAL PROVISIONS]]
 
::<p>A. Applicability Criteria</p>
 
::<p>B. Record Availability</p>
 
::<p>C. Prohibitions</p>
 
::<p>D. Transfer of Ownership or Control</p>
 
::<p>E. Civil and Criminal Liability</p>
 
::<p>F. Severability</p>
 
::<p>G. NPDES/SDS Rule Standard General -Conditions</p>
 
::<p>H. Inspection and Entry</p>
 
[[APPENDIX A]]
 
 
 
[[APPENDIX B - DEFINITIONS]]
 

Latest revision as of 19:34, 2 August 2023

The Construction Stormwater permit was reissued August 1, 2023.