Line 23: | Line 23: | ||
<td colspan=4> </td> | <td colspan=4> </td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<th>Description</th> | <th>Description</th> | ||
Line 31: | Line 30: | ||
<th>Total Estimated Price</th> | <th>Total Estimated Price</th> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<th colspan=5>'''Site Preparation'''</th> | <th colspan=5>'''Site Preparation'''</th> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>Tree removal - up to 12" diameter</td> | <td>Tree removal - up to 12" diameter</td> | ||
Line 64: | Line 61: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<th colspan=5>'''Site Formation'''</th> | <th colspan=5>'''Site Formation'''</th> | ||
Line 100: | Line 95: | ||
<th colspan=5>'''Structural Components'''</th> | <th colspan=5>'''Structural Components'''</th> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>Inlet structure</td> | <td>Inlet structure</td> | ||
Line 115: | Line 109: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<th colspan=5>'''Site Restoration'''</th> | <th colspan=5>'''Site Restoration'''</th> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>Sod - above vegetative bench</td> | <td>Sod - above vegetative bench</td> | ||
Line 127: | Line 119: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>Soil preparation</td> | <td>Soil preparation</td> | ||
Line 149: | Line 140: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=4>Subtotal</td> | <td colspan=4>Subtotal</td> | ||
Line 166: | Line 156: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=4>TAL CONSTRUCTION COST</td> | <td colspan=4>TAL CONSTRUCTION COST</td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<th colspan=5>Annual Operation and Maintenance</th> | <th colspan=5>Annual Operation and Maintenance</th> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>Debris removal</td> | <td>Debris removal</td> | ||
Line 197: | Line 184: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>Repair erosion</td> | <td>Repair erosion</td> | ||
Line 205: | Line 191: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>Sediment removal and disposal</td> | <td>Sediment removal and disposal</td> | ||
Line 213: | Line 198: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>Mow</td> | <td>Mow</td> | ||
Line 221: | Line 205: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>Gate / valve operation</td> | <td>Gate / valve operation</td> | ||
Line 229: | Line 212: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>Inspection</td> | <td>Inspection</td> | ||
Line 237: | Line 219: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=4>Subtotal</td> | <td colspan=4>Subtotal</td> | ||
Line 246: | Line 227: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=4>TOTAL ANNUAL O&M COST</td> | <td colspan=4>TOTAL ANNUAL O&M COST</td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=5>'''Minnesota Location Factors'''</td> | <td colspan=5>'''Minnesota Location Factors'''</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=2>Bemidji</td> | <td colspan=2>Bemidji</td> | ||
<td colspan=3>0.963</td> | <td colspan=3>0.963</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=2>Brainerd</td> | <td colspan=2>Brainerd</td> | ||
<td colspan=3>1.003</td> | <td colspan=3>1.003</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=2>Detroit Lakes</td> | <td colspan=2>Detroit Lakes</td> | ||
<td colspan=3>0.962</td> | <td colspan=3>0.962</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=2>Duluth</td> | <td colspan=2>Duluth</td> | ||
<td colspan=3>0.991</td> | <td colspan=3>0.991</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=2>Mankato</td> | <td colspan=2>Mankato</td> | ||
<td colspan=3>0.990</td> | <td colspan=3>0.990</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=2>Bemidji</td> | <td colspan=2>Bemidji</td> | ||
<td colspan=3>0.963</td> | <td colspan=3>0.963</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=2>Minneapolis</td> | <td colspan=2>Minneapolis</td> | ||
<td colspan=3>1.035</td> | <td colspan=3>1.035</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=2>Rochester</td> | <td colspan=2>Rochester</td> | ||
<td colspan=3>0.983</td> | <td colspan=3>0.983</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=2>St. Paul</td> | <td colspan=2>St. Paul</td> | ||
<td colspan=3>1.000</td> | <td colspan=3>1.000</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=2>St. Cloud</td> | <td colspan=2>St. Cloud</td> | ||
<td colspan=3>1.002</td> | <td colspan=3>1.002</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=2>Thief River Falls</td> | <td colspan=2>Thief River Falls</td> | ||
<td colspan=3>1.042</td> | <td colspan=3>1.042</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=2>Willmar</td> | <td colspan=2>Willmar</td> | ||
<td colspan=3>0.961</td> | <td colspan=3>0.961</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=2>Windom</td> | <td colspan=2>Windom</td> | ||
<td colspan=3>0.935</td> | <td colspan=3>0.935</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
</tr> | </tr> | ||
Line 329: | Line 293: | ||
<font size=1p>Note: Suggested unit costs are based on RS Means prices for Spring, 2005, then factored into an area basis based on typical design features for Constructed Wetlands BMPs. To be used for preliminary cost estimation</font size> | <font size=1p>Note: Suggested unit costs are based on RS Means prices for Spring, 2005, then factored into an area basis based on typical design features for Constructed Wetlands BMPs. To be used for preliminary cost estimation</font size> | ||
− | <noinclude>[[ | + | <noinclude> |
+ | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Costs, benefits]] | ||
+ | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Ponds and wetlands (constructed)]] | ||
+ | </noinclude> |
Stormwater wetland cost estimate worksheet.
Link to this table
Project Title | ||||
Owner | ||||
Location | ||||
Project Number | ||||
Date | ||||
Description | Units | Quantity | Unit Cost | Total Estimated Price |
---|---|---|---|---|
Site Preparation | ||||
Tree removal - up to 12" diameter | each | $350.00 | $0.00 | |
Clear and grub brush | square yard | $1.50 | $0.00 | |
Tree protection - temp. fence | lineal foot | $3.00 | $0.00 | |
Topsoil - 6" depth, salvage on site | square yard | $4.50 | $0.00 | |
Site Formation | ||||
Excavation - deepwater zone - 4' average depth | square yard | $5.00 | $0.00 | |
Excavation - marsh zone - 1' average depth | square yard | $1.00 | $0.00 | |
Grading | square yard | $1.50 | $0.00 | |
Hauling off-site - 5' depth | square yard | $5.00 | $0.00 | |
Structural Components | ||||
Inlet structure | each | $2,000.00 | $0.00 | |
Outlet structure | each | $3,500.00 | $0.00 | |
Site Restoration | ||||
Sod - above vegetative bench | square yard | $4.50 | $0.00 | |
Soil preparation | square yard | $25.00 | $0.00 | |
Seeding - vegetative bench | square yard | $0.50 | $0.00 | |
Planting | square yard | $30.00 | $0.00 | |
Subtotal | $0.00 | |||
10% Contingencies | $0.00 | |||
Subtotal | $0.00 | |||
Apply MN Location Factor | $0.00 | |||
TAL CONSTRUCTION COST | $0.00 | |||
Annual Operation and Maintenance | ||||
Debris removal | per visit | $100.00 | $0.00 | |
Remove invasive plants | per visit | $500.00 | $0.00 | |
Replant wetland vegetation | per plant | $10.00 | $0.00 | |
Repair erosion | square yard | $75.00 | $0.00 | |
Sediment removal and disposal | cubic yard | $10.00 | $0.00 | |
Mow | per visit | $150.00 | $0.00 | |
Gate / valve operation | per visit | $125.00 | $0.00 | |
Inspection | per visit | $125.00 | $0.00 | |
Subtotal | $0.00 | |||
Apply MN Location Factor | $0.00 | |||
TOTAL ANNUAL O&M COST | $0.00 | |||
Minnesota Location Factors | ||||
Bemidji | 0.963 | |||
Brainerd | 1.003 | |||
Detroit Lakes | 0.962 | |||
Duluth | 0.991 | |||
Mankato | 0.990 | |||
Bemidji | 0.963 | |||
Minneapolis | 1.035 | |||
Rochester | 0.983 | |||
St. Paul | 1.000 | |||
St. Cloud | 1.002 | |||
Thief River Falls | 1.042 | |||
Willmar | 0.961 | |||
Windom | 0.935 | |||
Note: Suggested unit costs are based on RS Means prices for Spring, 2005, then factored into an area basis based on typical design features for Constructed Wetlands BMPs. To be used for preliminary cost estimation
This page was last edited on 3 August 2022, at 20:44.