(Created page with "Prior to using the flow chart, gather the following preliminary information. *Conduct site review *Define performance goal ==Conduct site review== *Aerial photos and topogra...") |
|||
Line 24: | Line 24: | ||
*New and redevelopment projects: Retain on site a volume of 1.1 inches from impervious surfaces | *New and redevelopment projects: Retain on site a volume of 1.1 inches from impervious surfaces | ||
*Linear projects: Retain on site the larger of 1.1 inches from all new impervious surfaces or 0.55 inches from all new and fully reconstructed impervious surfaces | *Linear projects: Retain on site the larger of 1.1 inches from all new impervious surfaces or 0.55 inches from all new and fully reconstructed impervious surfaces | ||
+ | |||
+ | [[Category:Level 2 - Management/MIDS]] |
Prior to using the flow chart, gather the following preliminary information.
This page was last edited on 8 December 2022, at 17:25.