m
m
Line 1: Line 1:
 
The following documents were produced by Barr Engineering as part of the Minimal Impacts Design Standards project.
 
The following documents were produced by Barr Engineering as part of the Minimal Impacts Design Standards project.
*[[File:Final Iron Document.docx]]
+
*Documents for individual BMPs
*[[File:MIDS Pretreatment FINAL.pdf]]
+
**[[File:Final Iron Document.docx]]
*[[File:MIDS Reuse Final.pdf]]
+
**[[File:MIDS Pretreatment FINAL.pdf]]
*[[File:MIDS Turf Memo FInal.pdf]]
+
**[[File:MIDS Reuse Final.pdf]]
 +
**[[File:MIDS Turf Memo FInal.pdf]]
 +
*Information for using the MIDS calculator for individual BMPs, BMPs in series, and lumping BMPs
 +
**[[File:1 - Bioretention Basin without underdrain.docx]]
 +
**[[File:2 - Bioretention Basin with underdrain.docx]]
 +
**[[File:3 - Infiltration basin.docx]]
 +
**[[File:4 - Green Roof.docx]]
 +
**[[File:5 - Permeable pavement.docx]]
 +
**[[File:6 - Tree trench system-box.docx]]
 +
**[[File:7 - Tree trench system-box with underdrain.docx]]
 +
**[[File:8 - Swale Side Slope(1).docx]]
 +
**[[File:8 - Swale Side Slope.docx]]
 +
**[[File:9 - Swale Main Channel.docx]]
 +
**[[File:10 - Swale Main Channel with underdrain.docx]]
 +
**[[File:11 - Wet Swale.docx]]
 +
**[[File:12 - Sand Filter.docx]]
 +
**[[File:13 - Wetland.docx]]
 +
**[[File:14 - Stormwater Pond.docx]]
 +
**[[File:15 - Harvest and reuse.docx]]
 +
**[[File:16 - Other.docx]]
 +
*Example applications for the MIDS calculator
 +
**[[File:1 - Bioretention Basin Example.docx]]
 +
**[[File:2 - Bioretention Basin with an elevated Underdrain Example.docx]]
 +
**[[File:3 - Biofiltration Basin underdrain at bottom.docx]]
 +
**[[File:4 - Green Roof Example.docx]]
 +
**[[File:5 - Infiltration Basin example.docx]]
 +
**[[File:6 - Permeable Pavement example.docx]]
 +
**[[File:7- Tree Trench Systme - Box (with out an underdrain).docx]]
 +
**[[File:8 - Tree Trench System - Box (with underdrain).docx]]
 +
**[[File:9 - Swale Side Slope and Main Channel Example.docx]]
 +
**[[File:10 - Swale Side Slope and Wet Swale Example.docx]]
 +
**[[File:11 - Sand Filter example.docx]]
 +
**[[File:12 - Stormwater Pond.docx]]
 +
**[[File:13 - Wetland example.docx]]
 +
**[[File:14 - Harvest and reuse - Cistern.docx]]
 +
**[[File:15 - Other example.docx]]
 +
**[[File:16 - Individual vs Clumping example.docx]]
 +
**[[File:17 - BMPs in Series Example.docx]]
  
 
<noinclude>
 
<noinclude>

Revision as of 15:34, 3 September 2014

The following documents were produced by Barr Engineering as part of the Minimal Impacts Design Standards project.


Related pages

  1. Overview of Minimal Impact Design Standards (MIDS)
  2. Performance goals for new development, re-development and linear projects
  3. Design Sequence Flowchart-Flexible treatment options
  4. Community Assistance Package
  5. MIDS calculator
  6. Training and workshop materials and modules
  7. Technical documents