m
m
Line 1: Line 1:
 
The following documents were produced by Barr Engineering as part of the Minimal Impacts Design Standards project.
 
The following documents were produced by Barr Engineering as part of the Minimal Impacts Design Standards project.
*Documents for individual BMPs
+
==Documents for individual BMPs==
**[[File:Final Iron Document.docx]]
+
*[[File:Final Iron Document.docx]]
**[[File:MIDS Pretreatment FINAL.pdf]]
+
*[[File:MIDS Pretreatment FINAL.pdf]]
**[[File:MIDS Reuse Final.pdf]]
+
*[[File:MIDS Reuse Final.pdf]]
**[[File:MIDS Turf Memo FInal.pdf]]
+
*[[File:MIDS Turf Memo FInal.pdf]]
*Information for using the MIDS calculator for individual BMPs, BMPs in series, and lumping BMPs
+
==Information for using the MIDS calculator for individual BMPs, BMPs in series, and lumping BMPs==
**[[File:1 - Bioretention Basin without underdrain.docx]]
+
*[[File:1 - Bioretention Basin without underdrain.docx]]
**[[File:2 - Bioretention Basin with underdrain.docx]]
+
*[[File:2 - Bioretention Basin with underdrain.docx]]
**[[File:3 - Infiltration basin.docx]]
+
*[[File:3 - Infiltration basin.docx]]
**[[File:4 - Green Roof.docx]]
+
*[[File:4 - Green Roof.docx]]
**[[File:5 - Permeable pavement.docx]]
+
*[[File:5 - Permeable pavement.docx]]
**[[File:6 - Tree trench system-box.docx]]
+
*[[File:6 - Tree trench system-box.docx]]
**[[File:7 - Tree trench system-box with underdrain.docx]]
+
*[[File:7 - Tree trench system-box with underdrain.docx]]
**[[File:8 - Swale Side Slope.docx]]
+
*[[File:8 - Swale Side Slope.docx]]
**[[File:9 - Swale Main Channel.docx]]
+
*[[File:9 - Swale Main Channel.docx]]
**[[File:10 - Swale Main Channel with underdrain.docx]]
+
*[[File:10 - Swale Main Channel with underdrain.docx]]
**[[File:11 - Wet Swale.docx]]
+
*[[File:11 - Wet Swale.docx]]
**[[File:12 - Sand Filter.docx]]
+
*[[File:12 - Sand Filter.docx]]
**[[File:13 - Wetland.docx]]
+
*[[File:13 - Wetland.docx]]
**[[File:14 - Stormwater Pond.docx]]
+
*[[File:14 - Stormwater Pond.docx]]
**[[File:15 - Harvest and reuse.docx]]
+
*[[File:15 - Harvest and reuse.docx]]
**[[File:16 - Other.docx]]
+
*[[File:16 - Other.docx]]
*Example applications for the MIDS calculator
+
==Example applications for the MIDS calculator==
**[[File:1 - Bioretention Basin Example.docx]]
+
*[[File:1 - Bioretention Basin Example.docx]]
**[[File:2 - Bioretention Basin with an elevated Underdrain Example.docx]]
+
*[[File:2 - Bioretention Basin with an elevated Underdrain Example.docx]]
**[[File:3 - Biofiltration Basin underdrain at bottom.docx]]
+
*[[File:3 - Biofiltration Basin underdrain at bottom.docx]]
**[[File:4 - Green Roof Example.docx]]
+
*[[File:4 - Green Roof Example.docx]]
**[[File:5 - Infiltration Basin example.docx]]
+
*[[File:5 - Infiltration Basin example.docx]]
**[[File:6 - Permeable Pavement example.docx]]
+
*[[File:6 - Permeable Pavement example.docx]]
**[[File:7- Tree Trench Systme - Box (with out an underdrain).docx]]
+
*[[File:7- Tree Trench Systme - Box (with out an underdrain).docx]]
**[[File:8 - Tree Trench System - Box (with underdrain).docx]]
+
*[[File:8 - Tree Trench System - Box (with underdrain).docx]]
**[[File:9 - Swale Side Slope and Main Channel Example.docx]]
+
*[[File:9 - Swale Side Slope and Main Channel Example.docx]]
**[[File:10 - Swale Side Slope and Wet Swale Example.docx]]
+
*[[File:10 - Swale Side Slope and Wet Swale Example.docx]]
**[[File:11 - Sand Filter example.docx]]
+
*[[File:11 - Sand Filter example.docx]]
**[[File:12 - Stormwater Pond.docx]]
+
*[[File:12 - Stormwater Pond.docx]]
**[[File:13 - Wetland example.docx]]
+
*[[File:13 - Wetland example.docx]]
**[[File:14 - Harvest and reuse - Cistern.docx]]
+
*[[File:14 - Harvest and reuse - Cistern.docx]]
**[[File:15 - Other example.docx]]
+
*[[File:15 - Other example.docx]]
**[[File:16 - Individual vs Clumping example.docx]]
+
*[[File:16 - Individual vs Clumping example.docx]]
**[[File:17 - BMPs in Series Example.docx]]
+
*[[File:17 - BMPs in Series Example.docx]]
 +
 
 +
==Other documents==
 +
[[file:3 - Performance Curves.docx]]
 +
[[File:2 - MIDS Calculator Overview.docx]]
 +
[[File:1 - MIDS Addendum_Sections1and2_final.docx]]
 +
[[File:4 - Calculator User Documentation Version 2.docx]]
  
 
<noinclude>
 
<noinclude>

Revision as of 16:15, 3 September 2014

The following documents were produced by Barr Engineering as part of the Minimal Impacts Design Standards project.

Documents for individual BMPs

Information for using the MIDS calculator for individual BMPs, BMPs in series, and lumping BMPs

Example applications for the MIDS calculator

Other documents

File:3 - Performance Curves.docx File:2 - MIDS Calculator Overview.docx File:1 - MIDS Addendum Sections1and2 final.docx File:4 - Calculator User Documentation Version 2.docx


Related pages

  1. Overview of Minimal Impact Design Standards (MIDS)
  2. Performance goals for new development, re-development and linear projects
  3. Design Sequence Flowchart-Flexible treatment options
  4. Community Assistance Package
  5. MIDS calculator
  6. Training and workshop materials and modules
  7. Technical documents