m |
m |
||
Line 4: | Line 4: | ||
<table class="sortable"> | <table class="sortable"> | ||
<tr> | <tr> | ||
− | <th rowspan="3 | + | <th rowspan="3"><center>BMP group</center></th> |
− | <th colspan="10 | + | <th colspan="10"><center>Pollutant removal mechanisms</center></th> |
</tr> | </tr> | ||
<tr> | <tr> |
Screening/filtration | Infiltration/recharge | Settling | Biological uptake | Temperature control | Soil adsorption | Volume control | Rate control | Velocity control | ETa | |
---|---|---|---|---|---|---|---|---|---|---|
Pollution prevention | ||||||||||
Better Site Design/low impact development | ||||||||||
Runoff volume minimization | ||||||||||
Temporary construction sediment control | ||||||||||
Bioretention | ||||||||||
Filtration | X | |||||||||
Infiltration | ||||||||||
Stormwater ponds | ||||||||||
Stormwater wetlands | ||||||||||
Supplemental treatment |