==Overview on soils with low infiltration capacity== | ==Overview on soils with low infiltration capacity== | ||
− | |||
==Stormwater concerns on soils with low infiltration capacity== | ==Stormwater concerns on soils with low infiltration capacity== | ||
Line 17: | Line 16: | ||
Table 1 provides an overview of low infiltration capacity soil related design considerations for several structural practice groups. | Table 1 provides an overview of low infiltration capacity soil related design considerations for several structural practice groups. | ||
− | + | {{:BMP use in soil with low infiltration capacity}} | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==Investigation for Low Infiltration Capacity Soils== | ==Investigation for Low Infiltration Capacity Soils== | ||
Soil testing is recommended for all proposed stormwater facilities that plan to have a recharge or infiltration component to their design. Testing can be less rigorous than that for karst areas or sites with shallow bedrock and soils. The purpose of the testing is to identify and confirm the soil characteristics and determine their suitability, if any, for infiltration practices. The guidelines outlined below should not be interpreted as all-inclusive. The design of any subsurface investigation should reflect the size and complexity of the proposed project. | Soil testing is recommended for all proposed stormwater facilities that plan to have a recharge or infiltration component to their design. Testing can be less rigorous than that for karst areas or sites with shallow bedrock and soils. The purpose of the testing is to identify and confirm the soil characteristics and determine their suitability, if any, for infiltration practices. The guidelines outlined below should not be interpreted as all-inclusive. The design of any subsurface investigation should reflect the size and complexity of the proposed project. | ||
+ | |||
===Location of Borings=== | ===Location of Borings=== | ||
Borings should be located in order to provide representative area coverage of the of the proposed BMP facilities. The location of borings should be: | Borings should be located in order to provide representative area coverage of the of the proposed BMP facilities. The location of borings should be: | ||
Line 60: | Line 26: | ||
*Near the edges and center of the proposed practice and spaced at equal distances from one another; and | *Near the edges and center of the proposed practice and spaced at equal distances from one another; and | ||
*Near any areas identified as anomalies from any existing geophysical studies. | *Near any areas identified as anomalies from any existing geophysical studies. | ||
+ | |||
===Number of Borings=== | ===Number of Borings=== | ||
The number of recommended borings are: | The number of recommended borings are: | ||
Line 65: | Line 32: | ||
*Ponds/wetlands - a minimum of three per practice, or three per acre, whichever is greater. | *Ponds/wetlands - a minimum of three per practice, or three per acre, whichever is greater. | ||
*Additional borings - to define lateral extent of limiting horizons, or site specific conditions, where applicable. | *Additional borings - to define lateral extent of limiting horizons, or site specific conditions, where applicable. | ||
+ | |||
===Depth of Borings=== | ===Depth of Borings=== | ||
Borings should be extended to a minimum depth of five feet below the lowest proposed grade within the practice unless auger/backhoe refusal is encountered. | Borings should be extended to a minimum depth of five feet below the lowest proposed grade within the practice unless auger/backhoe refusal is encountered. | ||
+ | |||
===Identification of Material=== | ===Identification of Material=== | ||
All material penetrated by the boring should be identified, as follows: | All material penetrated by the boring should be identified, as follows: | ||
Line 75: | Line 44: | ||
*Any indications of water saturation should be carefully logged, to include both perched and ground water table levels, and descriptions of soils that are mottled or gleyed should be provided. | *Any indications of water saturation should be carefully logged, to include both perched and ground water table levels, and descriptions of soils that are mottled or gleyed should be provided. | ||
*Water levels in all borings should be taken at the time of completion and again 24 hours after completion. The boring should remain fully open to total depth of these measurements. | *Water levels in all borings should be taken at the time of completion and again 24 hours after completion. The boring should remain fully open to total depth of these measurements. | ||
+ | |||
===Infiltration Rate Testing=== | ===Infiltration Rate Testing=== | ||
Soil permeabilities should be determined in the field using the following procedure (MDE, 2000), or an accepted alternative method. | Soil permeabilities should be determined in the field using the following procedure (MDE, 2000), or an accepted alternative method. |
Soils with low infiltration capacity (defined as soils with infiltration rates less than 0.2 inches per hour) are found throughout the state. Details of where to find soils that can and cannot be used for infiltration systems should begin with available county soil surveys, most of which are available digitally. However, these surveys are not accurate enough to determine site specific characteristics suitable for infiltration systems, so a detailed site analysis is recommended. Stormwater management limitations in areas with tight soils generally preclude large-scale infiltration and ground water recharge (infiltration that passes into the ground water system). These soils will typically be categorized under Hydrologic Soil Group (HSG) D and have other characteristics as shown in Table 13.3. The infiltration rates noted in Table 13.3 are conservative estimates of long-term, sustainable infiltration rates that have been documented in Minnesota. They are based on in-situ measurement within existing infiltration practices in Minnesota, rather than national numbers or rates based on laboratory columns.
Sites with poorly infiltrating soils (defined as soils with infiltration rates less than 0.2 inches per hour) limit the number of practices that can used for stormwater management on a site or specific area of a site. Certain watershed organizations in Minnesota do not allow the use (or strongly discourage the use) of infiltration practices where soil infiltration capacity is low. This does not mean, however, that these tight soils don’t have any infiltration and recharge capabilities. So it may be possible for sites to meet recharge objectives as long as appropriate design modifications have been incorporated.
Table 1 provides an overview of low infiltration capacity soil related design considerations for several structural practice groups.
This table shows structural BMP use in soil with low infiltration capacity
Link to this table
BMP | Low infiltration capacity soil considerations |
---|---|
Bioretention, dry swale, permeable pavement, tree trench/box | Should be constructed with an underdrain. Recharge criteria, if applicable, can be met by modifying the design to include an infiltration gallery below the underdrain, so long as it is appropriately sized. |
Media filter | Recommended practice in tight soils. Some design variants can be modified to incorporate an infiltration gallery that can help meet recharge criteria, if properly sized. |
Infiltration trench or basin |
|
Stormwater ponds | Acceptable practice with tight soils. Soils should help maintain permanent pool. |
Constructed wetlands |
|
Soil testing is recommended for all proposed stormwater facilities that plan to have a recharge or infiltration component to their design. Testing can be less rigorous than that for karst areas or sites with shallow bedrock and soils. The purpose of the testing is to identify and confirm the soil characteristics and determine their suitability, if any, for infiltration practices. The guidelines outlined below should not be interpreted as all-inclusive. The design of any subsurface investigation should reflect the size and complexity of the proposed project.
Borings should be located in order to provide representative area coverage of the of the proposed BMP facilities. The location of borings should be:
The number of recommended borings are:
Borings should be extended to a minimum depth of five feet below the lowest proposed grade within the practice unless auger/backhoe refusal is encountered.
All material penetrated by the boring should be identified, as follows:
Soil permeabilities should be determined in the field using the following procedure (MDE, 2000), or an accepted alternative method.