m |
m |
||
Line 26: | Line 26: | ||
<td>Stormwater Ponds</td> | <td>Stormwater Ponds</td> | ||
<td> | <td> | ||
− | * | + | *May need liner if A soils or active karst are present |
*Pre-treat PSH runoff | *Pre-treat PSH runoff | ||
*Provide a separation distance from well or water table to BMP</td> | *Provide a separation distance from well or water table to BMP</td> | ||
Line 33: | Line 33: | ||
<td>Constructed Stormwater Wetlands</td> | <td>Constructed Stormwater Wetlands</td> | ||
<td> | <td> | ||
− | *May | + | *May need liner if A soils or active karst are present |
*Pre-treat PSH runoff | *Pre-treat PSH runoff | ||
*Provide a separation distance from well or water table to BMP</td> | *Provide a separation distance from well or water table to BMP</td> |
BMP design considerations for groundwater aquifer protection
Link to this table
BMP Group | Design Consideration |
---|---|
Bioretention |
|
Filtration |
|
Infiltration |
|
Stormwater Ponds |
|
Constructed Stormwater Wetlands |
|