Line 1: | Line 1: | ||
<center><font size=3> | <center><font size=3> | ||
− | '''Recommended elements of a community snow management plane'''</font size><br>Click here to access[[Recommended elements of a community snow management | + | '''Recommended elements of a community snow management plane'''</font size><br>Click here to access [[Recommended elements of a community snow management plane|table]]</center> |
<table class="sortable"> | <table class="sortable"> | ||
<tr><th>'''Plan Element'''</th> | <tr><th>'''Plan Element'''</th> | ||
Line 7: | Line 7: | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
− | <th colspan="2">'''Snow Removal and Disposal Approach'''</th> | + | <th colspan="2"><center>'''Snow Removal and Disposal Approach'''</center></th> |
</tr> | </tr> | ||
<tr></tr> | <tr></tr> | ||
Line 20: | Line 20: | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
− | <td colspan="2">Salt/Mixed Sand-Salt Storage</td> | + | <td colspan="2"><center>'''Salt/Mixed Sand-Salt Storage'''</center></td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 35: | Line 35: | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
− | <td colspan="2">Chemical Application Practices</td> | + | <td colspan="2"><center>'''Chemical Application Practices'''</center></td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 54: | Line 54: | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
− | <td colspan="2">Opportunities for BMP Adaptation</td> | + | <td colspan="2"><center>'''Opportunities for BMP Adaptation'''</center></td> |
</tr> | </tr> |
Plan Element | Recommended Practices |
---|---|
Formalize snow removal and disposal goals and objectives (action steps) | Adopt community snow removal and disposal goals and objectives so citizens know what to expect under certain conditions; clarify intent of wiser salt use |
Develop plowing and removal/ redistribution plan | Formalize goals and objectives into an action plan that clearly delineates steps that will be taken under different snow and ice scenarios; target problem areas (such as ice formation) |
Characterization of storage areas | Identify areas where both public and private salt and salt-sand mixes are accumulated and stored, and the characteristics of these areas, such as:
|
Cover exposed chemicals | Provide a small containment shelter with full coverage and a 3” lip to stop small flow from even leaving the storage pile. For larger operations, full coverage of both storage and mixing areas, and removal of unused pre-mixed sand/salt back into covered storage is recommended |
Identify the amount and manner of salt use | Determine the volume of salt being used, by whom, and where they are storing and applying it |
Identify training programs for salt handlers | Institute formal training program for all loaders and applicators |
Specify methods used to minimize salt application rate | Develop protocol for promotion of less salt use through driver training, equipment calibration and maintenance, pre-wetting techniques, antiicing, sand mixing |
Initiate record keeping system to track application rates by route and driver | Develop log system to track the amount of salt applied by each dri |
Map surface water drainage system and BMPs designed to handle runoff | Examine existing drainage maps to determine where chloride-laden meltwater runoff will go; identify sensitive water bodies; and assess the effectiveness of BMPs to treat snowmelt runoff |
Upgrade BMPs if needed | Identify problem BMPs that could be preventing adequate runoff treatment and program to manage them better |